Busy and fulfilling work has come to an end, and the work problems that existed in the past period of time are worth summarizing. It's time to write a self-inspection report seriously. How to write the self-inspection report? The following is the safety self-inspection report of the project department that I compiled for you. You are welcome to study for reference. I hope it helps you.
Project Department Safety Self-inspection Report 1 According to the document spirit and relevant requirements of the Notice on Carrying out Safety Inspection, our project department attached great importance to this safety inspection, actively organized it, and immediately set up a leading group to be responsible for the organization, communication and arrangement of safety inspection, and conducted a comprehensive safety inspection according to specific requirements. The safety inspection of xx Power Station is hereby notified as follows:
First, set up a safety inspection working group to ensure the in-depth development of safety production work organizationally.
In view of the spirit and requirements of this document, the project department attached great importance to it, and specially set up a safety inspection team with project manager Zhao Xianfeng as the team leader, safety director Yuliang Wang as the deputy team leader and heads of various departments as members to strengthen the organization and leadership of this safety inspection activity, and instructed the safety and environmental supervision department to be responsible for inspection, implementation and implementation. Supervise and rectify this safety inspection activity, take this safety inspection as an opportunity to eliminate existing safety hazards, strictly rectify and create safety civilization. "
Second, check the content.
The safety production inspection team, headed by the project manager, personally leads the team members every Saturday to carry out safety production inspection in all working surfaces of the construction site. Mainly investigate the construction site personnel, machinery, electricity, hole safety hazards and civilized construction.
Third, the inspection results and corrective measures
1, oxygen cylinder and acetylene cylinder are not standardized.
2. There are ever-burning lamps in the containers of individual units.
3. Individual workers on the construction site did not wear work clothes and safety helmets correctly.
4, individual unit welding machine grounding wire lap is not standard, with rail or electric drill parts as grounding wire.
5. Some grounding wires of electric welding machines are damaged and exposed.
6. The water pipes of individual units are not closed properly, and there is water on the rear platform.
After checking the safety situation of the construction area and the living area one by one, the above-mentioned potential safety hazards were rectified immediately, and the rectification measures were formulated. The details are as follows:
1, organize full-time safety officers to go deep into the construction workplace to strengthen inspections, and urge relevant departments to carry out rectification to ensure construction safety. To find out the hidden dangers and problems, it is necessary to establish an accident reporting system, and use the "two books" (accident hidden danger report and accident hidden danger rectification notice within a time limit) to report and rectify in time.
2. Improve the safety training and education system, ensure funds, strengthen the safety training, education and assessment of construction personnel (including migrant workers), and strengthen the pre-job training of construction personnel, so that operators can master the operating procedures skillfully. The person in charge, safety management personnel and special operations personnel resolutely carry out certificates.
3. It is stipulated that the heating power consumption of each room shall not exceed 3KW, and the living quarters shall be equipped with fire-fighting equipment.
4. Drivers should not drink alcohol during working hours, and should not drive under the influence of alcohol or fatigue.
5. Strengthen the safety education and on-site supervision of the construction unit; Strengthen the management, monitoring, guidance and training of seafarers. Implement the responsibility for production safety at all levels, pay close attention to the implementation of the system, strictly enforce the law, and strictly reward and punish.
6, strengthen the daily safety inspection, eliminate hidden dangers in time.
7. Without permission, electrical equipment such as wires and electrical switches shall not be connected or disconnected. All electrical problems should be handled by electricians.
8. Absorb good work achievements and lessons, improve the investigation, management and monitoring system of major hazard sources, and earnestly do a good job in the investigation and management of various safety hazards.
9, check the usage of mechanical equipment, electrical equipment for leakage switch, hole construction is safe.
10, site construction equipment and tools should be put in order, classified storage, create a clean construction environment.
Four, to further establish and improve the safety production system, formulate a sound and feasible safety prevention plan.
In this safety inspection, the project department will further improve and perfect the previously formulated rules and regulations, such as environmental protection management measures, construction site safety and civilized management measures, safety production management system, construction electricity safety regulations, major hazard source monitoring management regulations, flood control emergency plan, construction site safety management reward and punishment system, safety production accident emergency rescue plan, fire safety management system, etc., and implement the responsibility system for safety production.
1, strengthen safety education and improve employees' safety awareness.
While improving the safety rules and regulations, the project department will still carry out various forms of safety education from time to time to improve the safety awareness of employees and ensure safety education throughout.
Firmly establish the ideological policy of "safety first, prevention first". During the construction process, the project department will continue to do a good job in the safety management of the construction site, strictly implement the "three-level education", firmly establish the principle of "three no injuries", and realize the transformation from "I want safety" to "I want safety", thus improving the overall safety quality of the construction team and forming a good safety production situation of "everyone attaches importance to safety and everyone attaches importance to safety".
2, divide the rectification area, clear prevention plan.
2. 1 Safety management of construction site
According to the terrain, the general layout of safety construction should be carried out reasonably, and necessary protective measures should be taken.
All operators entering the site construction must conscientiously implement and abide by the safety technical operation procedures. All kinds of mechanical equipment, materials, objects, temporary facilities, etc. , must be arranged according to the safety construction plan, to ensure the smooth road. According to the arrangement of safety construction organization design, a good construction environment and a coordinated construction sequence will be formed. Power lines and fire prevention facilities shall comply with relevant regulations, so that the facilities are complete, reliable and easy to use. Take protective measures for high slopes in the construction area to avoid the occurrence of rolling stone injuries.
2.2 mechanical construction safety management
Personal safety accidents in mechanical construction, such as collision, trapping, involvement, electric shock, etc. Mechanical construction personnel must strictly abide by the mechanical safety operation procedures. All mechanical transmission parts must be equipped with protective devices, and wear protective equipment and various lifting equipment as required, and be equipped with safety devices such as safety limit devices and interlock switches as required. The crane commander and driver must strictly abide by the operating rules and shall not operate illegally. It is forbidden to operate too fast and the operating range is too large. Operators should pay attention to the operation direction in all directions, especially when no one is walking around the radius of gyration. All mechanical equipment and cranes should be inspected, maintained and repaired frequently to ensure their sensitivity and reliability.
2.3 Vehicle driving safety management
This project strictly abides by the road safety operation rules of vehicles, strengthens the study of traffic safety laws and regulations, and regularly inspects and maintains vehicles to ensure their safe operation. Fatigue driving, speeding and drunk driving are strictly prohibited.
2.4 Construction electricity safety management
Electrical accidents mainly refer to fires and explosions caused by electric shock, overload operation of electrical equipment and improper use of electricity. Establish a regular safety inspection system for electrical facilities, wires and cables on the construction site, rationally arrange power supply lines, take leakage protection measures for electrical equipment, and strictly require electricians to regularly check electrical equipment and switches on the construction site to eliminate hidden dangers in time. Strengthen the safety management of electricity consumption, strictly abide by the electrician's safety operation rules, and prohibit unlicensed personnel from engaging in electrical operations.
2.5 Work and labor protection
Basic protection for operation Personnel entering the construction site must wear safety protection articles correctly: safety helmet, safety shoes and work clothes;
Safety helmet:
(1) It is forbidden to use safety helmets with no service life or service life exceeding 30 months;
(2) It is forbidden to knock on the helmet and sit on it;
(3) it is forbidden to remove the mandibular belt or not fasten it;
Work clothes:
(4) It is forbidden to open overalls, open chests and bare backs;
⑤ It is forbidden to wear overalls with serious damage, or cut off sleeves and trouser legs, or make holes in overalls;
2.6 Safety management of living camps
(1) Be responsible for the public security and fire control work in the living camp, and provide sufficient fire fighting equipment;
(2) Responsible for the hygiene and food safety of the canteen, and strengthen the food hygiene inspection with the gradual increase of the temperature;
(3) Strengthen the dormitory electricity inspection to avoid overload operation and prevent fire accidents.
Verb (abbreviation for verb) Next work plan
In order to implement safety production management and check the implementation of various safety management systems and measures, the project department will conduct regular safety inspections every week.
The inspection shall be combined with daily inspection, and the inspection scope shall include the construction site, living camp and other places where there may be potential safety hazards, leaving no dead ends.
Horn. If potential safety hazards are found, timely rectification and rectification within a time limit are required, and the rectification results are tracked and checked. At the end of each month, summarize the safety rectification work of the month, sum up experience, find out the shortcomings and make comprehensive improvement.
Conclusion of intransitive verbs
Safety work has a long way to go. XX project department regards this safety inspection as a new opportunity to improve the production management level, and will carry out safety work in depth, so that the safety work of the project department will reach a new level, ensure the safe and efficient construction and production of the project department, and make unremitting efforts and due contributions to the harmonious and healthy development of the company.
Project department safety self-inspection report II. The safety production management of the project department always implements the policy of "safety first, prevention first and comprehensive treatment", adheres to the responsibility system of "safety must be in charge of production" and "whoever is in charge is responsible", comprehensively improves the scientific management and civilized construction awareness of all employees, and establishes an effective safety production guarantee system. So far, there has been no safety accident of any level in our project department.
In 20xx, our project department further improved the safety production management system and the safety responsibilities of each post in the project management department, drew the safety production network diagram, formulated a series of safety production guarantee measures, various operating procedures and technical requirements, standardized the behavior of employees, made the safety work rule-based, implemented it in production management, and ensured the effective operation of safety production management. And formulated the "Emergency Rescue Plan for Safety Production Accidents", so that every employee has mastered the knowledge and basic skills of emergency rescue, thus ensuring the thorough implementation of safety work. At the same time, according to the annual plan of safety production, the project drill is carried out in the project department.
The project department organized and established a safety production leading group with the project manager as the team leader, the deputy manager as the deputy team leader, and the management personnel and observation leaders as members, determined the responsibility system for safety production in a targeted manner, and implemented it layer by layer. The leading group for production safety often goes deep into the construction site for inspection, and reports the situation of production safety and the measures taken to the company leaders in time to eliminate potential safety hazards. Under the direct leadership of the project manager, we will conscientiously implement the guidelines, policies, regulations and systems related to production safety of the superior, and promote the production safety of this project.
The project department put safety production in the first place and strengthened its attention to safety production. In order to promote employees to learn safety production laws and regulations and increase the publicity of safety production, the project department has set up full-time safety officers. Conduct pre-job safety education for new employees and assist in handling the safety monitoring of this project.
To find out the hidden dangers of accidents, the project department should formulate a rectification plan, so as to ensure that the personnel, measures and completion date are fixed, and all the items are implemented and the funds are received. Before the hidden danger is eliminated, reliable protective measures should be taken, and if the personal safety of employees is endangered, the operation should be stopped immediately.
The project department shall formulate flood control measures, set up a flood control leading group headed by the deputy project manager, sign a safety responsibility letter, pay close attention to the water situation, do a good job in various temporary protection and drainage facilities, and arrange special personnel to patrol the construction site in rainy days without any negligence.
The safety education of the project department is fully implemented, and all employees and new employees are regularly provided with different forms of safety training and education: all project personnel (including temporary workers, interns, apprentices, migrant workers, etc.). Must receive pre-job safety education, including: safety knowledge, various operating procedures, safety system, etc. Only after passing the training can they work at their posts.
In addition to the daily general safety education and publicity, the full-time safety officer of the project also makes full use of warning signs and other forms to carry out safety popularization and publicity, and uses typical accident cases to educate employees, requiring employees to strictly implement the safety operation procedures of this type of work (post), not to take risks in violation of regulations, refuse to command in violation of regulations, and stop illegal operations.
The project department hangs safety signs and signs in the living area and construction area, which not only plays a warning role, but also rejuvenates the spirit of the project department. The project department conducts pre-shift education and training every day, so that employees can firmly establish the awareness of safety in production and standardize their own behavior. They must carry out safe operation and safety monitoring during construction to prevent all kinds of accidents. The work of safety in production is always unremitting, and the policies and regulations of safety in production are implemented in the front line of production. Everyone attaches importance to it and all employees participate, so that the alarm of production according to law will ring in everyone's heart.
Employees actively participate in various safety activities organized by the project department, put forward improvement measures and rationalization suggestions for the management of accident hidden dangers of this project and this team, adhere to principles, dare to stop "three violations", eliminate accident hidden dangers, protect employees' personal and national property from losses, and make outstanding contributions to the safety production of the project department. The accident treatment adheres to the principle of "four don't let go", that is, the responsibility for the accident is unclear, the parties involved in the accident and related personnel are not spared, and the person responsible for the accident is not spared, and preventive measures are not formulated.
The project department pays more and more attention to safe production, and safe and civilized construction has become the goal of our work. The project department has provided all employees with safety protection articles. During the construction period, employees are forbidden to work with illness and fatigue, and they must wear safety helmets when entering the construction site. These humanitarian measures reflect the care for employees and inspire their enthusiasm and enthusiasm. Employees consciously abide by various systems and concentrate on production.
In 20xx, our project department will, as always, carry out the work of safety in production, further improve and consolidate the work of safety in production, further formulate and refine relevant systems and management regulations, and reserve strength for our project department's work of safety in production in by going up one flight of stairs.
Safety self-inspection report of the project department 3 According to the requirements of the Notice on Forwarding the Traffic Department of the Autonomous Region on Carrying out the Inspection and Supervision of Safety Production in the Transportation Industry in the Region (No.343 [XX]), the project department of Liuhe 1 1 Bid Section has seriously carried out the self-inspection and self-correction work in combination with the actual construction situation.
First, safety production reflection, inspection, self-examination and self-correction activities
1, safety management agency
In the construction of safety management organization, our project department pays special attention to on-site technology and the allocation of safety personnel. Each work area is equipped with the person in charge of the work area, the chief engineer of the work area, the safety and quality department, the engineering department and other important personnel and departments. Each job site has on-site technicians and full-time safety officers to supervise the whole process at the site, and all of them have signed a letter of responsibility for safety management terminals, clarifying the responsibilities of all managers and ensuring the safety and quality of on-site construction.
2, production safety management system
Through self-examination and self-correction activities, some original safety production management systems and safety protection facilities are not perfect, and now they are gradually becoming formal. For example, before the construction, there is no detailed safety construction management system, and the on-site management personnel have no specific disclosure to the construction team. After that, Yang Hongquan, the chief engineer of the project department, used his spare time in the evening to make a detailed safety technical disclosure to the construction management personnel and construction personnel, and signed a letter of responsibility with the relevant responsible persons, and formulated measures for the precautions in the construction process of the construction team one by one.
3, major hazard investigation and management and monitoring.
At present, as the project of our project department draws to a close, the main danger points are controlled in the traffic safety of formwork support of Liangsan overpass, the concrete pouring construction of the secondary trunk road of the overpass, the construction of making and transporting beams (umbrella bridge, Tian Liang overpass and Liutang overpass), and other main danger points such as tunnels have been basically completed. Wei, the manager of my project department, organizes large-scale safety inspection and self-correction twice a month. The safety department and engineering department, led by Lu, deputy manager of Jiaxiang Safety, organize self-examination and self-correction of safety production twice a week, and report the investigation and management of hidden dangers and monitoring of major hazard sources in each work area every ten days, whether it is rectified in time, and impose economic penalties on units or individuals who fail to rectify in time.
4, safety education and training and special type of work related certificates
With the focus of safety production rising from substructure to superstructure, most of the beam-making in our project department is aerial work, so safety education and training is particularly important. The project department has worked out monthly safety education and training for beam construction. Check the certificates of the construction workers at each site, and find that there are nearly 200 people with special jobs at the site of our project department, and the certificates at the site are 100%.
5, the use and management of special equipment
Because the special equipment of our project department is basically concentrated in beam section construction, we must check the safety performance of mobile formwork every day. After pouring a few beams for some stressed members, the fatigue test of the stressed members is carried out again, and the members that cannot meet the safety performance are removed and replaced. Due to the influence of subgrade, the special equipment of beam yard and transport frame was basically out of service from June to August, but the special equipment on site was maintained normally.
6, safety investment situation
My project department has learned safety lessons from all kinds of construction sites in safety investment, and spared no expense in safety production investment to ensure construction safety. At present, all the construction sites in our project department have not neglected the safety problem because the safety investment funds are not in place, nor have they affected the construction progress because the safety investment funds are not in place.
7, emergency plan preparation and exercise
According to the understanding of the measures taken by migrant workers in accidental injuries, and in view of the actual situation of safety construction and production in our project department, an emergency drill was specially organized in yi river No.6 Bid Section, which was successfully concluded and recognized by the owner and the supervision site.
Second, the existing problems
During this safety inspection, * * * found 33 problems, and immediately rectified 15, and rectified 18 within a time limit. The main problems found in the inspection are:
1, scaffolding of Liangsan overpass above the secondary road was not erected as required;
2. The site construction electricity is not set as required. (Liutang Bridge Deck, Liutang T-beam Precast Yard and Liangsan Overpass) are not set up according to the requirements of "three-phase five-wire system", "three-level distribution and two-level protection" power distribution system, switch boxes are not set up according to the requirements of "one machine, one brake, one leakage and one box", power lines are not set up in a standardized way, and the lines are mopped;
3. The "four ports and five entrances" on the construction site lack safety protection facilities;
4. The safety protection of Liutang overpass bridge is not in place, and the safety net set in the limb is damaged and does not meet the requirements;
5. The use and management of special equipment for box girder prefabrication yard of Liangsan Bridge is not standardized;
6, fire fighting equipment is insufficient, expired, not in the obvious position;
7. All the safety hazards detected yesterday have been rectified.
Third, the rectification measures
In view of the above problems, the next step is to strengthen measures, urge enterprises to rectify on time, review on time, track rectification and ensure that rectification is in place.
1, strengthen leadership and establish awareness of safety in production. It is necessary to strengthen measures, conscientiously implement the responsibility system for production safety, put the work of production safety on an important agenda, and the top leaders should personally grasp it. It is necessary to intensify the work of production safety, conscientiously implement the policy of "safety first, prevention first", adhere to the principle of who is in charge and who is responsible, implement the responsibility system for production safety at all levels, and earnestly implement it. In particular, enterprises that have stopped production or semi-stopped production and key units of safety and fire prevention should do a good job in safety production and safety and fire prevention in strict accordance with relevant regulations.
2, law-abiding, establish and improve the rules and regulations of production safety. According to the requirements of safety production, establish and improve the rules and regulations of safety production, post operation procedures and organizational structure, so that there are rules to follow, laws to follow, organization and implementation, system implementation and measures implementation. At the same time, do a good job in propaganda, education and training of safety production, and enhance the awareness of safety production and legal concept of leaders and migrant workers.
3, regular inspection, careful investigation and rectification of hidden dangers. Our inspection of production safety should be regular, institutionalized and standardized, which is mainly reflected in the word "diligence" in our work. Be diligent in asking questions, urging and checking. It is necessary to urge enterprises to speed up the rectification of potential safety hazards raised in the inspection, nip them in the bud and reduce the occurrence of safety accidents.
4. Strict discipline and serious accountability. We should do a good job in preventing accidents in production safety and put an end to all kinds of accidents. In the event of an accident, we should conscientiously implement the accident reporting system and report it step by step in time. Units that have production safety accidents shall, in accordance with the principle of "four let-offs", seriously investigate the responsibilities of the main responsible persons and relevant responsible persons to ensure the safety of the country and people's lives and property.
Four, production safety reflection, inspection, self-examination and self-correction activities have achieved results.
Through the great reflection, inspection, self-examination and self-correction activities on the safety production in the construction site of our bid section, the safety and quality hidden dangers existing in the operation sites of our company's projects, the signs of major safety hidden dangers and the occurrence of safety and quality accidents have been eliminated, especially the awareness of safety hidden dangers investigation in various work areas, departments and construction teams. In a word, the project department has effectively promoted the safety production work in site construction by carrying out safety production reflection, inspection, self-examination and self-correction activities. On-site construction safety production responsibility subject is more clear, the sense of social responsibility is further enhanced, and the safety awareness of employees is obviously improved, forming a strong and good atmosphere in which everyone pays attention to safety within the whole project scope.
;