Current location - Quotes Website - Collection of slogans - Summary of project manager's work
Summary of project manager's work
Summary is a written material that comprehensively and systematically reviews and analyzes the study, work or its completion in a period. Writing a summary is conducive to the improvement of our study and work ability. Let's write a summary carefully together. How should I write a summary? The following is the summary of four project managers' work I collected for you, hoping to help you.

Summary of Project Manager's Work 1 I joined XX Group Real Estate Company on September 14, 2008, and entered the project site of xxxx Department Store on September 23rd as a project manager. It has been more than three months now. During these three months' work, with the strong support and guidance of the group real estate company, the project department has overcome many difficulties and it is extremely difficult to get to today. At present, the site is in the piling stage, and 46% of the pile foundation construction tasks have been completed. Although the next construction task is extremely arduous, I still have confidence and ability to complete the construction period of each stage. Below I will make the following report on the work of these three months in XX years and the work plan for next year:

First, the preliminary construction preparation stage

As an investment promotion project in xx county, the xxxx department store project can basically get government support and help as long as it is conducive to the construction progress. However, before the smooth start of construction, the following work must be completed.

1, laying out the basement control line.

2. Building alignment.

3. The planning department shall conduct line inspection.

4. Submit the leveling points and coordinate control points provided by the surveying and mapping department to the general contractor.

5. Organize the design disclosure of foundation pit supporting construction drawing and the blue prints.the design twice.

6, pile foundation construction drawing design disclosure and the blue prints.the design.

7. The planning department shall provide the drawings of municipal pipelines around this project.

8. Assist to complete the expansion work of temporary power shortage on site.

9. Before construction, go through the quality supervision procedures at the quality and safety station.

Second, the construction stage

Before piling construction, the foundation pit earthwork has been dug to a depth of about two meters and five meters. Because there were no construction drawings at that time, most places were not excavated in place. Considering that there are enough working faces in the surrounding row of piles, it is necessary to cooperate with the earthwork excavation unit to dig out the remaining soil. For a long time, the earth excavation unit didn't cooperate with our work arrangement, kept antagonistic feelings with us, and even made trouble at the construction site, so the construction site work could not be carried out at the moment. Through our patient and meticulous communication, we learned the unit price of earthwork excavation in other local sites, and finally reached an agreement with the earthwork excavation unit through rewards.

After the foundation pit is excavated for 2.5m, it will have a great impact on the site piling. The concrete truck can't drive into the construction site at all, and the surface of the foundation pit is covered with silt. Once it rains, the bearing capacity of silt layer drops sharply, and piling construction is very difficult. The general contractor will use this as an excuse that there is no condition of three links and one leveling on the construction site, which leads to claims for expenses and time limit. We made a decisive decision and actively organized the local construction unit to backfill the pond slag in the site, which ensured the need of piling construction in the site.

The hardest part is actually in the beginning After three weeks at the site, the general contractor still hasn't arranged for the pile driver to enter the site. It is also a fact that the general contractor has not received the formal construction drawing of pile foundation provided by us, which is not convenient for organizing machinery to enter the site. However, after we provided the blueprint for pile foundation construction on 10/5, the general contractor still failed to enter the pile frame. The general contractor encountered great difficulties in finding subcontractors, and found more than a dozen units back and forth, but they were unwilling to undertake this business. It was not until1October 22 that several piles were entered one after another. 1October 29th, the trial pile construction of podium and tower was started. The trial pile construction of podium was successful, but the tower ended in hole collapse after 6 days of trial drilling. The tower pile must enter the rock 1.5 meters, and the circulating drilling rig encounters pebbles with large particle size in the sandy pebble layer (the largest pebble collected on site is close to 40 cm), which is easy to block the pipe. Later, with the consent of the design unit, the tower recycling hole-forming process was changed to impact hole-forming process, and the general contractor organized six impact hammer drills to enter the site on 1 1 July 7. First try to make a hole in the north side of the tower, but the soil layer about three meters on the north side of the ground is quicksand. When lifting the hammer, the heavy hammer, quicksand and casing are pulled up together, which makes it very difficult to form a hole. In order not to delay the construction period of the tower pile foundation as much as possible, the pile test construction began on the south side of the tower, and the pile test began on 1 1 month, and the first concrete pouring was completed on 1 1 month 16. However, due to the limited working face on the south side of the tower, only four piles can be placed for construction. At the same time, we have not given up our efforts on the north side of the tower. After consulting various experts, we put forward some suggestions, such as dewatering first, and then arranging piling construction. The general contractor has successively carried out well point dewatering, shallow tube well dewatering, grouting and other strengthening foundation construction technologies, but none of them have achieved the required results. Geological factors on the north side affect the construction of about 60 pile foundations, and together affect the construction of about 70 uplift piles in the surrounding pure basement. The next step will be deep well dewatering, and then piling construction will be arranged.

The podium pile foundation construction task has been completed, including 57 towers and 1 15 pure basement piles, totaling 349 piles (46%).

Three. 20xx work plan arrangement

The progress of pile foundation construction is lagging behind, and the main work in the next stage is to arrange work around earthwork excavation to ensure that the basement floor pouring is completed before the flood season. The main work arrangements are as follows:

1, 20xx 65438+1October 15 entered the site and started excavation.

2. Piling (including retaining piles) will be completed before the end of 20xx 1, but the next stage of piling construction and foundation pit retaining construction will not affect earthwork excavation. 20xx Earth excavation will be completed before March 20th, and the basement will be started in early March of 20xx, and completed on April 15.

3.20xx Complete the concrete structure below 0.000 before the end of May.

4.20xx Complete the concrete structure of the podium before the end of August.

This tower will be capped before the end of 20xx.

6. Electromechanical installation, curtain wall construction, secondary structure construction and fine decoration construction are carried out in the main structure construction.

Four, the current need to coordinate other work.

1. Provide a full set of construction drawings, and examine and approve the construction drawings.

2, fire, HVAC, weak current, hardcover, curtain wall, elevator and other subcontractors.

3. Determine the brand information provided by Party A and Party A. ..

In the new year, I will work hard from the following points.

1. Continue to do a good job in the project management of xxxx department store: the work of 20xx is the main structure, electromechanical installation, curtain wall engineering, fine decoration, etc. Time is tight and the task is heavy. Considering the requirements of the total construction period of the project, I will continue to pay special attention to the progress control of the project to ensure that the project is completed on schedule and the whole project is guaranteed.

Delivery on schedule.

2. Strengthen business knowledge learning and continuously improve management level: With the progress of the times and the application of new technologies, we must learn professional technical knowledge and management knowledge to improve our management coordination ability. Continuously improve the professional skills of subordinate employees to ensure that the quality and progress of on-site construction are effectively controlled.

3. Further do a good job in site management: In the 20xx years' work, although some achievements have been made in the projects I am responsible for, there are still many shortcomings, which need to be further summarized and improved. Only by summing up the past well can we serve the future better. In the new year, I will pay more attention to three aspects of management: first, people management. People are the organizers and executors of management, and project managers cannot relax. Only when all the managers cooperate closely and perform their duties, can all aspects of the construction be interlocked and the overall work be orderly. The second is the construction schedule management. Always track the site construction progress, find problems, and immediately communicate with the construction unit to ensure that the weekly, monthly and annual progress plans are completed on time. The third is cost control management. Although the construction unit will not take the initiative to consider the project cost when settling accounts with the construction unit according to the quota, even the more cost investment, the better the construction unit will be. However, as the on-site management personnel of Party A, it should belong to the expenses borne by the construction party, and there will be no additional visas, and everything will be settled according to the quota.

In short, in the new year, I will further improve myself, research and improve project management methods, and make contributions to the development of the company.

Summary of project manager's work in 20xx, I obeyed the company's arrangement and took the post of "project manager" of "XX commercial and residential building" developed by xxX Group with a construction area of more than 200,000 square meters and a total project cost of more than 70 million yuan. A series of problems need to be solved urgently, such as the pressure of funds, the difficulty of construction technology and the organization of the main management personnel of the project department. Any mistake will bring immeasurable pressure to the smooth completion of the project. "People-oriented", especially the selection of construction management personnel for major projects, are carefully selected, technically independent and have considerable on-site construction management experience. The optimal combination of the main managers of the project department is a powerful guarantee to complete the project.

Any project is composed of three aspects: personnel, funds and material resources. The lack of any one aspect will bury hidden dangers for the quality, safety and progress of the project. Choosing a "people-oriented" construction team is my key consideration. In the process of organizing construction teams of various types of work, the professional and technical quality and safety and quality awareness of team leaders are the key. They are the leading geese in the construction process of various types of work, and their comprehensive quality plays a mainstay role in the whole project.

The amount of funds invested and the speed of funds in place are the barometer to ensure the quality of building products, ensure safe production and finish on schedule. Only sufficient funds can ensure the quality and safety of production and finish it on schedule. However, as far as the current situation is concerned, the construction industry is already a low-profit industry, and the low rate of funds in place for some construction parties has increased our economic pressure. However, no matter how tight the funds are, the wages of migrant workers and managers in our project department are still paid on a monthly basis, and there has never been a phenomenon of deducting or defaulting on the wages of migrant workers due to financial constraints.

In daily construction, we strictly control the quality. In order to ensure the quality of each working procedure, the project department is equipped with a full-time quality controller to fully track the construction process and never affect the quality due to financial difficulties. The overall quality of the project has been well received and affirmed by the owner and relevant parties. Safety is the benefit of enterprises; Safety is the life of workers! This is not a simple slogan. "Safety and quality coexist" and "reputation and benefit coexist" are the project management purposes of our project department.

In the 20xx years' work, although some achievements have been made in the projects I am responsible for, there are still many shortcomings that need to be summarized and improved. In the new year, I will pay more attention to three aspects of management: first, people management. People are the organizers and executors of management, and project managers cannot relax. Only when all the managers cooperate closely and perform their duties, can all aspects of the construction be interlocked and the overall work be orderly. The second is the management of things. That is, material management. In 20xx, I will continue to do a good job in the quota acquisition system in project management, and further refine it, and make a comparative analysis with the project budget on a regular basis to find out the shortcomings and formulate countermeasures. The third is the management of law. That is, the research and management of construction methods. On the basis of the company's preventive measures, combined with the actual characteristics of the project, optimization and improvement were carried out to form a set of effective construction methods to guide the construction and workers' operation.

Summary of Project Manager's Work 3 Since the beginning of this year, under the correct leadership of the Municipal Party Committee, the Municipal Government and the Municipal Urban and Rural Construction Committee, the urban landscaping work has adhered to scientific planning, high-quality construction and fine management, focused on the key work objectives throughout the year, and has been implemented with great efforts, and successfully completed the annual work tasks. The quality of landscaping has been continuously improved, and the urban ecological environment has been continuously improved, which has contributed to the construction of green Qingdao, ecological Qingdao and beautiful Qingdao.

I. Complete the work in 20xx years

(a) adhere to the quality construction, tree planting and greening work has achieved remarkable results.

1. The task of planting trees and greening has been fully completed. Complete the road greening upgrading project of Heilongjiang Road (luoquan Jian to Xiyingmen overpass) and the greening project of Binhai Avenue and Jiushui Road overpass. The Qingdao Garden of the World Expo was successfully completed at the end of March, and won the "Creative Special Prize of Outdoor Garden Competition" of the World Expo. The fifth Shandong City Garden Expo "Qingdao Garden" project was successfully completed and won the gold medal. The 10th China (Wuhan) International Garden Expo "Qingdao Garden" project is progressing as planned. Decorate the city and create the atmosphere of the World Expo *** 12 road, and all the nodes at 17 have been completed. Voluntary tree planting and planting of more than 40,000 trees and shrubs. The top of Loushan Mountain and Meihua Mountain will be afforested 10, and three-dimensional greening will be completed 100, and courtyard greening 194. 2. Complete the task of bare land greening with high standards. The city has completed 590 bare land greening, covering an area of 4,4861hectare, and planted 2108,200 trees and shrubs, covering an area of 2,095,700 square meters, exceeding the annual bare land greening plan. In July and August, it ranked first in the Progress Report on Urban Construction Dust Control and Bare Land Greening in Shandong Province issued by the Housing and Construction Department for two consecutive months. Six projects, including bare land greening on both sides of Laoshan Road, were rated as demonstration projects of urban bare land greening in the whole province. 3. The planning and construction of the Greenway around the Bay and Fushan Ecological Park are progressing in an orderly manner as planned. Organize relevant districts and cities to scientifically and reasonably submit the construction scheme of 20xx greenway around the bay. In accordance with the requirements of "three-year task, two-year completion", the greenway project around the bay in the jurisdiction was fully promoted, and all districts and cities completed the annual construction tasks as planned. Complete the master plan of Foshan Urban Ecological Park; The main leaders of the municipal party Committee and the municipal government have visited Fushan for field research; According to the work arrangement of the Municipal Party Committee and the Municipal Government, the comprehensive management of Fushan will complete the project approval this winter and carry out the project construction in an all-round way next spring. The World Expo venues will be opened on time to welcome guests. Five sub-venues opened at the same time as the World Expo on April 25th. Among them, the construction of the branch venue of Taiping Mountain Central Park has integrated the original resources of Zhongshan Park, Botanical Garden and Zoo, comprehensively afforested the park, and added the Giant Panda Pavilion, Flower Garden, Yungu and Continental Garden. The park has taken on a new look and is very popular with citizens and tourists.

(two) adhere to the fine maintenance, and effectively improve the level of greening management.

1. Carry out publicity activities to improve the greening effect. Consolidate and upgrade the green belt of 130 primary and secondary roads that were intensively rectified in 20xx, rectify 490 exposed loess, and the boundary point of 150, with planting soil 24,560 meters higher than the boundary stone and replanting more than 200,000 shrubs.

2. Implement gardening pruning to improve the greening quality. During the dormant period, the city pruned 1, 406 roads and more than 4 1, 000 trees. During the growing period, 79,677 street trees were pruned from 265,438+00 main and secondary roads in six districts.

3. Implement plant cleaning to create a beautiful landscape. In order to meet the requirements of urban development, reduce urban dust pollution and improve the quality of atmospheric environment, the Working Standards for Cleaning and Dust Removal of Landscaping Plants and the Incentive Measures for Special Funds for Cleaning and Dust Removal of Landscaping Plants have been formulated and promulgated. In 20xx, the city * * * implemented an incentive fund of 20xx million yuan for cleaning and dust removal of urban landscaping plants to create a fresh and beautiful urban environment.

4. Improve the management of parks. Formulate the "Assessment Methods for Grid Management of Bureau Parks", and all the grid distribution maps of the four parks are on the wall. Sun Yat-sen Park and others put up "QR code" signs for ancient and famous trees. Focus on re-planning the layout of the pavilions in Zhongshan Park, and demolish all the Sakura Road pavilions before the opening of the World Expo. Clean up the mobile vendors of tourists in the park, completely eliminate the ills of illegal operation in the park, and create a good garden environment for tourists. 5. Pay special attention to safety work. Focus on urban forest fire prevention and accident prevention to ensure safety and stability.

(three) adhere to standardized management, and constantly improve the level of scientific greening according to law.

1. The scientific greening level has been effectively improved according to law. The remote sensing experiment of urban landscaping was successfully completed. Formulate the Code for Landscape Planning and Design of Qingdao and the Code for Maintenance and Management of Urban Green Space in Qingdao, improve the Measures for Management and Use of Compensation for Urban Greening in Qingdao, and strengthen the quantification and integration level of landscaping work. 2. Landscaping scientific research work in an orderly manner. The national approved scientific research project "Introduction and Cultivation Technology of Wild Ornamental Flowers in Qingdao" has passed the acceptance appraisal of the relevant departments of the state, province and city, which is the first time that the garden scientific research project of our city has won this honor.

(4) The Party Committee attaches importance to continuously consolidating the achievements of building a clean and honest party style.

1. Seriously study the spirit of the 18th National Congress of the Communist Party of China and the Third and Fourth Plenary Sessions of the 18th Central Committee, and consciously arm your mind with Party theory to guide your work. Establish a "garden lecture hall" system, adhere to regular training, and invite famous teachers to give four large-scale lectures.

2. attach great importance to it. The Party Committee of the Bureau attaches great importance to the construction of party style and clean government, and looks back with the high standards of the Party's mass line education and practice activities.

3. Implement the system. Consciously implement the eight regulations, strengthen the construction of a clean government, investigate the risks of clean government one by one, and establish preventive measures. The conference system, foreign affairs reception system and bus use management system were sorted out and improved. Establish a system of asking for instructions and reporting, and keep the government decrees unblocked.

Solve the problem. The work of letters and visits implements "one post and two responsibilities", so that visitors will answer questions when they visit, and visitors will actively solve problems for the masses; The performance salary of employees in Siyuan Park was paid in place, the cohesion was enhanced, and positive energy was constantly emerging.

Summary of Project Manager's Work 4 In this year, under the leadership and care of the company leaders and with the help and cooperation of my colleagues, I gradually grew up in the post of project manager and was promoted to engineering manager. In the past year, through the practice in the construction site and the training courses in the company, my skills in professional technology, site management, bidding strategy and cooperation with decoration units in construction have been significantly improved. And under the guidance of company leaders, I have a certain understanding of the management department. After I transferred from project manager to engineering manager, under the guidance of company leaders, I constantly improved my working methods, improved my work efficiency and successfully completed various tasks.

First, strengthen the image and improve their own quality.

In order to be a good project manager, I insist on being strict with myself, pay attention to setting an example and treat others sincerely. First, I love my job and pay attention to dedication. The most important feature of engineering work is "planning". Therefore, I have a correct understanding of my work and value, correctly handle the relationship between joys and sorrows, gains and losses, personal interests and collective interests, adhere to professionalism, honesty and dedication, and carry out targeted management objectives for departmental project managers in stages, such as weekly work plan, project construction log inspection, and departmental regular meeting system. In order to manage the project managers who need to run various construction sites and subcontract materials.

Second, strengthen functions and provide good services.

At work, I pay attention to integrating myself into the staff of the department. As a grass-roots cadre, we should not only do a good job in department construction and our own work, but also do a good job in employee service. When department employees need help, I should take the initiative to help them solve problems to ensure the smooth progress of all the work in the department. The first is to make a serious fuss. Official documents are the carrier to convey the company's policies and intentions, and the quality and level of official documents directly affect the smoothness of commanders, so they are written in the work instructions of the engineering department; Factory delivery flow chart and description, detailing the decomposition process of each detail node; Second, strictly hold meetings, the engineering department from scratch, from the establishment to the beginning of the departmental system, to the fixed project seminar every Wednesday; The regular meeting system of departments every Saturday effectively implements the arrangement and deployment of leaders and ensures the smooth progress of the work.

Although some achievements have been made in the work in the past year, there are still many shortcomings, mainly due to insufficient ideological emancipation, insufficient height in dealing with problems, a certain distance from being a qualified department head, insufficient seriousness in management and insufficient rigor in department construction. In my future work, I will definitely sum up my experience, overcome my shortcomings and strive to do better.

Entry stage: Take over the finishing work of Oasis Segway Project at the beginning of the year, and the construction site will cooperate with thirteen decoration units. As a novice, I still have a lot of ideological pressure. However, with the encouragement of the company leaders' strategy of "Joining the Party with Firewire and Rapid Growth in Practice" and the help and cooperation of colleagues in the company, the final work was successfully completed and passed the acceptance. Through field practice, I have accumulated a lot of experience. During this period, I participated in the bidding for projects such as "Tianshan Riverside" and "Xinfengcheng".

Trial stage:

With the trust of the leaders, I independently operated the cabinet project of Xinfengcheng-Ginza Apartment. Although I encountered various difficulties due to lack of construction experience and site management experience, with the assistance of my colleagues in the production department, installation team and other companies, I successfully completed the project and recovered the project money. During the construction, we have maintained a good cooperative relationship with Party A's representative.

Growth stage:

Fengdu International Project participated in the whole process of bidding, scheme determination, material determination with Party A's engineering department, material supplier selection, coordination with the construction unit on how the cabinet installation progress is coordinated with decoration, and the interface finishing treatment scheme, and presided over the preparatory work before construction such as project preparation meeting and material preparation meeting. In this project, under the coordination of leaders, through the resource platform of the head office, the triangle valve problem of the kitchen water inlet pipe was successfully solved, and the project was completed on schedule. We have established a good cooperative relationship with the staff of Party A's project department, and maintained a smooth communication channel with Dongyuan Company after the completion of the project, so as to know whether there are new cooperation opportunities in time.

Now I'm doing two model houses for real estate. Baguio Project cooperates with the developer to negotiate with the general contractor and the designer of Party A on drawing deepening, material sample selection, material supplier selection, signing a supply contract with the general contractor, analyzing the quantity of materials, cooperating with the general contractor to refine the joint interface construction scheme and construction period, and coordinating the processing technology of external processing with our construction requirements. Workload analysis, material sample determination, material supplier selection, on-site construction coordination of Huafu Tiandi furniture supporting project, and coordination to complete the preparatory work before signing the contract.

Looking back on my work in the past year, I have both achievements and shortcomings. In the next year, I will adhere to the company's "rigorous and pragmatic" enterprise spirit, learn professional knowledge, do a good job more seriously, think more, read more, use my head diligently, and constantly improve my field management ability. I will also consult modestly in my work, learn more about decoration engineering, so that I can better cooperate with the decoration unit in my work, do a better job and successfully complete every job.