Summary is a written material to review and analyze the study, work, life or its completion, including achievements, existing problems, experiences and lessons gained in a certain period. It helps us to find the laws of the development of work and things, so as to master and apply these laws. It is better to act immediately and write a summary. How to write a summary to play its role? The following is the summary report of librarian's internship that I carefully arranged for your reference, hoping to help friends in need.
Summary Report of Documentary Internship 1 Time flies, and the end of the year is in a hurry. With the attitude of reviewing the past, summing up experience, finding out shortcomings, enriching oneself, always urging yourself to work diligently, be a down-to-earth person, have no regrets about work, never shirk, be strict with yourself, unite with colleagues and set an example. Since 20xx was integrated into Gansu 21st Metallurgical Construction Co., Ltd. in April, I have experienced the dedication and care from the leaders, the diligence and self-discipline from my colleagues, the responsibility and rigor in my work, and the care and warmth brought by the 21st Metallurgical Family in my life. Busy and full is my deepest experience of this year's work.
Now, I will summarize my personal work in the past year as follows:
Since I joined the company and took over the work as a documenter, under the guidance of Shi Lei, who is in charge of engineering technology, I have been responsible for the data management of buildings 22#, 23#, 24#, 25# and 26# in Zone D of Hengmei Olympic Cannes. I have begun to collect and sort out the engineering data, communicate with Party A and the supervision unit in time, and carefully handle the construction plan, change negotiation, supervision notice reply and other related information for inspection. Cooperate with the work of Party A, the supervisor and all units as much as possible, and be able to better assist project managers and engineering-related personnel during the construction period, provide them with the required information and do similar work.
Data work seems easy, but in fact it is trivial and complicated. It is not easy to really do it well. I have been working intensively since I started work in April, because this is the beginning of the main work of buildings 25# and 26#, and both the experimental report and the field construction data have increased greatly. However, I have just entered this new environment and have not fully entered the state. Even in the face of the greatest difficulties, I can't back down. On the basis of grasping all the working hours and working hard, I gave up my lunch break and then used the evening to race against time. If I don't know this place, I will call a stonemason for advice. After unremitting efforts, I finally fully adapted to this environment and rhythm, and maintained great enthusiasm until the 25#, 26#, 24# and 22# buildings were capped.
My other job is to collect and keep the documents and meeting documents issued by the company and relevant departments, and put the documents that have not been sorted out in detail into folders for easy access.
Secondly, do a good job in the distribution, circulation and transmission of various documents and drawings, and archive the original documents. According to the regulations of the project department, the documents are distributed, circulated and transmitted by relevant departments, signed and confirmed by the receiving unit or individual, and the original documents are filed.
And be responsible for the custody of engineering data. Verify the integrity of engineering data, fill, cut and fold folded, damaged and uneven documents, and try to keep the appearance uniform. According to the data regulations, the documents are classified according to the characteristics of the data content, and the data belonging to the same volume are bound in a file box and stored in a cabinet. And regularly check the documents, trace the lost documents and find out the reasons. Engineering data should be carefully filled in, neatly written and neatly bound. At a glance, it is convenient for future investigation and filing.
During this year, I learned a lot of experience and knowledge, and made great progress in communicating with people. By reading more books, asking more questions and listening more, I have further improved my work skills, which is a big step forward compared with last year.
During this year, many problems and low-level mistakes in my data were exposed through many inspections and acceptances by various departments. This pointed out the direction of improvement for me, and also urged and improved my level accordingly. At the same time, it is also necessary to seriously study norms and regulations and related documents, master professional knowledge, improve work ability, strengthen sense of responsibility, and do all the work in time.
The ancients said, "Only when you save yourself three times a day can you know you have done nothing wrong!" In short, in the future work, I will constantly reflect and study and consolidate on the basis of summing up my own and my predecessors' experience, so as to make a qualitative leap in my practical level and ensure my ability of continuous progress to adapt to the development of the times and enterprises.
20xx is the most brilliant period in my life experience. Thanks to CCTV, MTV, Channel[V], SMG, all TV stations and 21st Metallurgical Company for giving me this opportunity to write this year-end report. Thanks to the organizer 21st Metallurgical Company, as well as the promotion companies Pepsi, Coca-Cola, Sprite, Fanta, Qixi Company and my agent Gu Weifeng. Thanks to the wily leader who gave me this position, I deeply realized the meaning of "Dapeng has a good wind and flies nine Wan Li in one day". I am grateful to the enthusiastic stonemason for his guidance and help, which made me make further progress. Thank you, thank you, thank you, thank you, director Zhang Xue, for making me no longer lonely on the 2nd1metallurgical day …
I have supported the 21st Metallurgical Company for quite a long time, so I won't talk about it. It is my greatest wish to talk about myself on the platform of 21st Metallurgical Company today. I didn't expect it to come true so soon. I will, as always, try my best to be myself, and I will not violate the law and discipline, blow up buildings, scold leaders, bully colleagues or call Lao Yang a porter. I will continue to develop morally, intellectually, physically and aesthetically and strive to be an excellent project manager.
Of course, studying hard and making progress every day is also my slogan to constantly motivate myself. Come back and publish it when I'm in the mood. Here, I would like to thank the 21st Metallurgical Group in particular. Thank you for giving me such a good platform. I will continue to support 21st Metallurgical Group and do a good job in publicity. Ok, I will work harder this year and insist on criticism and self-criticism! Your criticism is the source of my motivation!
Summary Report of Documentary Internship 2 As a student majoring in civil engineering, I know the importance of internship and have a solid theoretical knowledge. Without practice, I can only build castles in the air. In order to test my knowledge, I practiced for two months before graduation. The following is my site practice report.
My internship unit is a supervision company in Jinan, with Grade A construction qualification. The management of the company is very standardized and attaches great importance to the cultivation of new people. It is this standardized management that makes me suffer and taste the sweetness.
On the first day of registration, after introducing the relevant workflow, I was arranged to work as an information officer at the university town site in the east of Jinan. The university town is located under a barren hill, and the construction site is digging. Although the company has built temporary offices according to the standard, the conditions are still very difficult. The director asked me to learn from Gong Li, the information officer of engineering supervision. According to the company's regulations, the construction supervisor should stay at the construction site at any time, and the construction information officer should often go to the site to verify the information, although not necessarily at any time. My specific job is to follow Gong Li to complete the daily construction supervision log, fill in and verify the construction records formed that day. If there is any problem, let the contractor sign the construction record as required, and ask the director to put forward rectification opinions and send them to the contractor for signature.
It's easier said than done. Just make construction records. According to the specifications, the construction team should be recorded in detail every day, including how much manpower and machinery are used, the specific construction site, what problems occurred during the construction process, how to solve them, and whether the construction party has made rectification according to the requirements of the supervision. Before going to work every day, the data generated on that day should be sorted and filed. In the first few days, I followed Gong Li to take notes with my folder every day. Under the guidance of Gong Li, there is basically no problem. After getting familiar with the procedures, Gong Li asked me to try to make my own records and file the data. I felt the difficulty at once. First, when making construction records, there should be a connection between earthwork and foundation burial depth every day. Because I was a little busy taking notes at first, I either forgot this content or that. At the end of the first day of independent recording, Gong Li and I summarized the archival materials and found many mistakes and omissions. As a result, I worked overtime until 89: 00 at night to find out them one by one.
After discovering the problem, I no longer asked for independent work, but stayed with Gong Li at any time to understand how his day's work was arranged, and gradually learned some tricks of being a construction information officer, such as when to make rectification records, when to ask the director to sign, and how to budget the daily earthwork progress. Of course, the tricks here can only play an auxiliary role in the work. The key lies in the expertise and experience of professional knowledge, such as budgeting earthwork progress, which actually requires professional computing knowledge. In addition, during the internship, it is found that although everyone in the supervision project department has different division of labor, in an emergency, almost everyone can fight against an enemy, that is, the librarian can also act as the supervisor, and the supervisor can also perform some functions of the director. Therefore, it is not easy to exchange personnel positions. The key is that almost all the personnel in the supervision project department are battle-hardened and familiar with all the procedures on site, even if they are not within their own work scope. I admire this, but I also feel that what I have learned is far from enough. Just like filing, Gong Li can accurately classify and file in a chat, but I have to check it a little before I can do it. This is the difference between professional knowledge and experience, which needs to be accumulated for me.
After two months of internship, I feel that I have gained a lot. The construction site is like a real university auditorium, full of knowledge. Unfortunately, the internship can only be ended in a hurry near graduation, but this internship will definitely have an impact on my future work and life, that is, knowledge is everywhere and it is worth learning at any time.
Documentary internship summary report 3 After staying at the construction site for a period of time, I gradually feel that word and Excle must be able to do data, and then CAD must learn to read drawings. Making data is actually very simple, but it is very difficult to do it well. Need extensive knowledge. The work of a librarian seems trivial, and it seems that an individual can do it, but it is absolutely impossible for anyone to do a good job as a librarian. Look at the drawings more when you have time. If you don't understand, ask your predecessors. Doing well in data management is a necessary condition for doing well in data management. As the project supervision information is gradually recorded and formed by the project supervision organization in the process of project supervision, it is a comprehensive and true reflection of the project construction process and plays an important role in controlling the quality of project construction. Therefore, if the data can't meet the work requirements, the quality of the engineering entity is virtual.
There are three main points in doing information:
1, raw material inspection test, site construction test, all quality assurance sheets and inspection reports are the basis and basis of data, and there can be no defects. Others come to check and see these things, because only these can't be forged.
2. The construction inspection data should follow the date, quantity and location of the quality assurance certificate and test report. Even if the construction inspection data is complicated at ordinary times, as long as the submitted data is consistent with the data in the report after acceptance.
The most important thing is not to have missing parts. Look carefully at each table on the data form, find out their purpose and the order of doing it, and you will soon understand how the data is done.
Secondly, the filing of engineering documents should follow the natural formation law of engineering documents, keep the organic connection of the documents in the volume, and facilitate the storage and utilization of files. When a construction project consists of multiple unit projects, the project documents shall be compiled according to the unit projects.
Engineering document filing:
1 The project documents can be divided into five parts according to the construction procedure: project preparation stage documents, supervision documents, construction documents, completion drawings and completion acceptance documents.
1 The documents in the project preparation stage can be grouped according to the construction procedure, specialty and organizing unit.
1 supervision documents can be grouped by unit project, division project, specialty and stage.
1 Construction documents can be grouped by unit project, division project, specialty and stage.
1 As-built drawings can be grouped by unit project and specialty.
1 The completion acceptance documents are grouped by unit project and specialty.
Paperwork summary materials procedures will be included in the scope of urban construction archives supervision data handed over to the urban construction archives. Only when all the previous links are done well can the files be handed over smoothly and the supervision work be completed smoothly.
The completion of the above work also has many shortcomings:
(1) First of all, there is a certain slack in checking the engineering data of the construction unit, and often the construction unit reports the engineering data to the supervision department after the construction is completed. Engineering data should be collected, sorted and handed over as required with the progress of the project.
There are also some shortcomings in supervising and managing the construction unit to make the engineering data true, effective and complete. Among them, the construction unit did not pay attention to the compilation of engineering data and did not use engineering data software to make engineering data, which led to the inability to manage the data in a unified way.
(3) The monthly supervision report is incomplete, and the construction unit can cooperate with the supervision in time at the beginning. When the project draws to a close, it will start to delay, resulting in the inability to collect and prepare monthly supervision reports in time. Compiling a complete monthly supervision report requires the full cooperation of all parties.
The above are the problems I have encountered in the work of the supervision department in the past six months, and they are also the shortcomings in my work. As a professional information manager, I have been tempered in long-term work practice, and I can skillfully manage construction materials, supervision materials and construction materials. Although I have been engaged in data management for a short time, I have some experience in different kinds of data management. However, there is still a certain gap in being a professional librarian. I will try my best to do every data management job. In the past six months, I have been familiar with and improved in my own work since I started to do supervision information. It is still very rewarding.
Without practice, many problems can't be considered. Only after practice can we know that anything may be encountered, which requires us to have rich practical experience. For example, interns who have just left school are not rich in practical experience, but if they don't know anything in theory, they can't stand it during the internship.
College life is tense and full of expectations. In my spare time, I always look forward to packing my bags, staying away from my relatives and friends and teachers, and going my own way. However, when we can finally leave the nest built by our elders and walk on the big stage of social work like a fledgling eagle, we find that the road of life is so bumpy that everyone's success has experienced some storms. During my internship, I learned a lot, which is of great help to my future work. This is the first time in my life that I stepped into the society and took up my job. I feel that life is really not easy.
;