Current location - Quotes Website - Collection of slogans - Ipqc work summary report
Ipqc work summary report
Ipqc work summary report

Chapter 1: ipqc Work Summary Report

I joined XXxx kairuite lighting co., ltd in xx. With the correct leadership of the company's leaders and the close cooperation of my colleagues, I quickly integrated into the company's cultural atmosphere and completed my work well. Constantly adapting to the busy work, I gained a lot unconsciously and realized a lot. Here, I want to make a summary of my work in the company for one month.

First job performance

Constantly understand and master the company's quality control policies and various quality control methods, strictly implement the company's quality policies, set an example, constantly improve the awareness of quality concepts, abide by the strict control operation and product standard documents of the quality control department, and operate in strict accordance with the document operation specifications, mainly responsible for online tracking inspection, finished product packaging inspection, receiving confirmation and sample testing of the R&D department. When you find problems in your daily work, you can solve them in time, just like the person in charge of the project and the person in charge of relevant departments.

Since joining the company, it is very difficult to ensure the quality of products at work because of the shortage of staff in the department and the initial state. During this period, it is a heavy task and difficult to complete online tracking, find problems in time and make statistics in time. With the help of colleagues in the department, the task was successfully completed, and the most impressive thing was the aging of finished products. Time is limited due to many aging problems.

For extensions, it is necessary to track them. At first, the data and solution records were not detailed enough.

The second major harvest and experience

Joining Keret Company and learning constantly in the busy work can be said to have gained a lot, which deepened my understanding of the company's related products. Due to continuous online tracking, the process and characteristics of the product

More and more familiar. Before I joined the company, I knew little about LED lights. Now I have a deeper understanding of the company's LED lights, and I am familiar with the relevant inspection methods. In fact, I can also complete some inspection work.

We often encounter difficulties in our work, and the deepest experience is not to be afraid of difficulties and not to be unable to finish the task because of difficulties. The most correct way is to face up to the difficulties and list them and discuss them with colleagues in the department.

The third deficiency and the need for improvement.

Over the past month, I have done some work and made some achievements, but there are still some gaps from the requirements of leaders and colleagues. For example, the company's LED lights often die in the aging process, the specific reasons and treatment methods, but I don't know enough about the company's specifications and testing standards, and I lack experience. This will accumulate experience in the follow-up work and master the test methods and specifications. At the same time, it is found that the packaging inspection and testing is not perfect enough, and there is no standard scheme for reference, so it is necessary to carry out inspection and testing based on work experience. This is prone to loopholes, and I hope it can be improved in the follow-up work.

Determined to carry forward achievements and overcome shortcomings in future work. With a highly responsible attitude to the work, do all the work conscientiously and down-to-earth.

Chapter II: ipqc Work Summary Report

1, hand-over before work, mainly to understand the following issues:

A: What's unusual about the shift change?

B: those things haven't been dealt with yet? Need to follow up with QC.

c; Which products have had customer complaints and which products have had major anomalies?

D: Has that set of molds been repaired or modified?

E: Which models have special inspection requirements?

2. First check each set of equipment one by one:

a; The first inspection mainly confirms the size, structure, appearance, color, assembly and testing of the product.

B: The main basis for product inspection is SOP. SIP, drawings and samples.

c; After stopping the machine, repairing the mold, changing the operator and adjusting the molding parameters, it is necessary to confirm the confirmation of the first product again.

3. Inspect each machine as required.

a; For model 3 products of 1, check the product size, structure, appearance and color one by one. b; In the process of inspection, products with major anomalies and customer complaints should be strictly inspected.

c; Confirm the operator's operation method during inspection. Pay attention to new employees.

d; When a new product is produced for the first time, it is necessary to clearly understand the inspection standards.

e; For a large number of scrapped products, production improvement must be notified immediately.

f; Any abnormal situation that cannot be handled should be reported in time.

4. Sampling inspection

a; Sampling shall be carried out in strict accordance with GB2828 Normal Sampling.

B: Sampling inspection is the confirmation of product quality, which has certain risks, so the sampling inspection method should be reasonable. c; For new employees' products, the number of sampling inspections should be strengthened.

d; For products produced by employees with poor quality awareness, it is necessary to strengthen sampling inspection.

e; The packaging method of the product should be confirmed.

f; All abnormal situations that cannot be handled within half an hour will be deleted from the abnormal quality contact table.

5. Exception handling methods;

a; Any anomalies need to be identified and isolated.

B: You should inform the production workshop of the defects you can judge in time.

c; Unqualified products shall be submitted to the supervisor for confirmation.

D: If the batch is abnormal, the Abnormal Quality Contact Sheet will be invalid.

F: No matter what the abnormality is, the final therapeutic effect should be confirmed.

6. The core value of IPQC work;

Find problems, analyze problems, solve problems and prevent problems.

7. Work news:

Be bold, cautious, earnest, responsive, self-study and self-summary.

8. Team slogan:

Check the product quality, supervise the production process and ensure the smooth production.

Work step by step:

What should I do first among many things?

What is the first thing you need to do?

How to do the first thing well?

Among many things, what are the first two things I should do?

What does the second thing have to do with the first thing?

How to do the second thing well?

Where to start?

;