Summary of water conservancy work 1 It has reached the end of 20 19 in a blink of an eye. 20 19 is 1 complete 1 year when I came to the Institute of Water Conservancy. This 1 year is basically in a hurry, with some confusion, some urgency, and sometimes a little emotion, but it is still relatively stable on the whole, with no special achievements. I can only say that I have worked hard to lay the foundation for the future.
In 20 19, I not only completed my professional work and consolidated my professional experience and knowledge, but also entered a new industry field (municipal water supply and drainage) or a new professional work (hydraulic building design, which was not independently designed before) with a learning attitude, and participated in some new design work, which paid some sweat and gained some gains.
This year, from February to March at the beginning of the year, it is mainly about the construction drawing and disclosure of the diversion project of the second stage of dam construction. In March, I mainly went to the site to be responsible for agency work, and experienced the process of cofferdam filling and closure in Longkou. Compared with the previous feasibility study, bidding and other construction professional design work, I participated in the construction drawing design and site construction process, which made me have a specific and vivid understanding of construction methods and site layout, and laid a solid foundation for the construction layout of large reservoir projects in the future. Thank you for giving me this opportunity.
From April to May, I devoted myself to the structural drawing design and drawing of the waterworks, mainly drawing the drawings of structures such as "sludge concentration tank", "sludge drainage tank" and "clean water tank" in the preliminary design stage. Faced with the structural design and drawing of structures that I have never been exposed to, and the urgency of task submission time, I felt pressure for the first time.
I used my spare time to consult the teaching materials related to structural design in the university, learned the relevant standards, specifications and calculation software, and then communicated with process designers and checkers many times to discuss the scheme, and barely completed the scheme design in the preliminary design stage. Due to the lack of attention to drawing specifications, tight time and lack of specifications, it is inconvenient for drawing reviewers to review drawings. I apologize for that.
At the end of May, I also started the preliminary design of another gravity dam, which is a project of a brother department. At the beginning of the task, I was anxious to submit the construction drawing. Later, I also rushed to ask for preliminary design drawings, from the owner to the final draft, from experts to the final draft, from excavation drawings to preliminary design drawings to excavation drawings.
From the official start of construction in June to the end of September, the construction organization design, pre-planning of construction organization design, and revision of some construction chapters of a river-lake connection project are also carried out alternately, and the work often overlaps. Although the scale is not large, but the sparrow is small and complete, it is still very complicated. There are many factors in the dam, such as poor slope geological conditions, wide spillway section, complicated upstream and downstream water level conditions, uncertain opinions of the owner and so on.
Fortunately, under the guidance of the director, chief engineer and the "main school", the design disclosure of the dam construction drawing was finally completed. I have gained a lot from the design of dam drawings, which gives me the opportunity to comprehensively learn the hydraulic and structural design methods and general requirements of gravity dams, as well as the characteristics and experience of small dams. Through the dam design, I believe I can be more competent for the dam design in the future.
From June 10 to February 12, the main work is mainly the construction organization design in the preliminary design stage. The project includes three drainage pumping stations, 1 pumping station, 1 river regulation, two sewage interception trunk pipes and 1 river dredging and reconstruction project, which has the characteristics of many projects and more schemes.
In addition, there are many factors in this municipal project, such as dense surrounding houses and complicated boundary conditions of foundation pit support. Because this is the first time to do the construction design of municipal engineering, I basically design while learning, which basically overcomes the difficulties encountered in the construction design and can basically come up with a more reliable construction plan. Of course, for example, the design of foundation pit support and dewatering scheme still needs to take some time to sort out and summarize systematically.
The above is a summary of my work this year. Due to the care and understanding of the leaders, the work is generally smooth. This year, I also strengthened my understanding of myself. My habit of doing things is generally to master big ideas and then do them step by step. I lack the consciousness of task decomposition and grasping the main contradiction, and I lack the attention to time arrangement and schedule management, which often leads to the difficulty in completing the schedule. In the new year, I will take my work seriously and cultivate my habits strictly.
On 20/0/9, Kloc applied for the major of water conservancy and hydropower, and reviewed three courses in August and September intermittently in his spare time. The problems exposed in the exam are the lack of objective understanding of review time planning and enforceability, too optimistic about one's spare time and energy, and lack of adequate physical preparation and planning, which leads to uncertainty about the exam. In the next year, I will plan ahead, use my spare time to prepare for review, and strive for a one-time pass.
During this year, I am very happy to work and grow with my colleagues in the department. Everyone is very capable and makes me full of hope for the future. In the coming year, I will continue to strive to improve myself, cultivate good habits, arrange planning time reasonably, and add value to myself and the Second Hospital!
Summing up the water conservancy work in the past year, under the correct leadership of the township party committee and government, with the specific guidance and help of the regional bureau, various departments and institutions, we actively carried out the work around the central tasks set by the township party committee and government, and made due efforts for the basic construction of farmland water conservancy in the township. The main work is summarized as follows:
First, actively participate in comprehensive agricultural development projects.
It is the first time that the 20 19 comprehensive agricultural project undertaken by our township has been implemented in mountainous villages and towns in our region. There is no experience to learn from and no technical data to check. Therefore, we groped while working, constantly summed up experience and lessons, and passed the joint acceptance of municipal authorities on May 24, 20 19, and completed the construction task of the project on time and with high quality.
In this project, a new production road around the mountain18km, 200m3 water tanks13km, 5 pumping stations, 2 air pump facilities, 30 water culverts, PE pipes13km, and standard weirs10km are reconstructed. The completion of the project has been highly praised by the main leaders of the urban area, laying a foundation for the project to improve the agricultural efficiency of the village and increase farmers' income.
Due to the excellent completion of this project, the 20 19 agricultural comprehensive development project can be continued in my hometown. The project started on 20 19, 10 and 15. After more than two months' efforts, about 70% of the total engineering quantity has been completed, and all the production roads around the mountain 13.6 km have been connected.
Two, a good completion of the municipal financial bidding project construction tasks.
The financial bidding project in my township is a 3000m main canal maintenance project supporting the reservoir, which started in May 2065438+2009 and was completed in July. The project construction is divided into sections according to the area of beneficiary villages, and the construction is organized in the form of professional teams. The government is responsible for unified material supply, and the water conservancy station and village cadres are responsible for technical construction, which ensures the smooth implementation of the project.
Third, do a good job in flood control.
After entering the flood season, according to the requirements and arrangements, all kinds of water conservancy facilities and rivers were inspected and removed, of which 654.38+million yuan was invested to complete the removal and reinforcement project of Dongyu River embankment, and * * * built berms 1.600 meters and dredged rivers 1.5 kilometers. Prepare all kinds of flood control materials, set up the reserve team of flood control and emergency rescue team, implement the 24-hour duty system, and report the rain, water and water conditions in time to ensure that the flood control work is foolproof.
4. Completed the grouting work of the reservoir.
Due to the renovation of the 20 19 road, the water injection of the two reservoirs will start at the end of 10 and end at 10 on October 24th. Judging from the grouting effect, the effect of reservoir leakage section is obvious, and the leakage phenomenon has been eradicated. Because the aggregate of Tuquan Reservoir is basically washed away, although many measures have been taken, the grouting effect has not been achieved, and hidden dangers still exist.
5. The ecological restoration of soil and water conservation has been solidly completed.
In the last year of 2065438+2009, under the specific guidance of the District Water Conservation Office, we implemented the project item by item in accordance with the requirements of the implementation plan. Whether it is the construction of water conservation forest, the construction and management of closed restricted areas, the production of various publicity signs, the writing of slogans and the construction of related water conservancy facilities, the task has been successfully completed, which has created rich basic conditions for the environmental construction goal of building an ecological town in our township.
Sixth, other aspects of work.
First, the tap water projects in six villages were completed, which solved the problem of draught difficulty for more than 2,000 people; Second, raise funds through multiple channels and drill a deep well in each of the three villages to solve the problem of insufficient draft water sources in the three villages; Third, the daily business work such as observation report and water sample collection of groundwater and surface water was completed in time.
First, go all out to complete the construction task of the comprehensive agricultural development project in 20 19, and ensure that all measures are fully completed on time to meet the acceptance.
Two, the use of this year's reservoir storage more favorable conditions, timely grasp the spring irrigation of wheat.
Third, do a good job in the annual flood control work, often observe the operation of the reservoir, promptly investigate and deal with all kinds of hidden dangers, and ensure the safety of flood control.
Four, timely do the daily business work assigned by the Party committee, government and superior business departments.
Summary of Water Conservancy Work 3 (1) The reservoir project in our city has been fully completed and developed rapidly.
First, the flood control and disaster relief work was successfully completed this year. Ensure the agricultural production and domestic water demand in the irrigation area, and effectively guarantee the normal agricultural production in the reservoir irrigation area. Second, the reservoir reinforcement has achieved remarkable results. There are 29 dangerous reservoirs in our city, of which 10 (2 large, 4 medium and 4 small) has been included in the first and second batch of dangerous reservoirs reinforcement planning in China, and it is planned to be included in the third batch of dangerous reservoirs invested by the central government.
0/5 reservoirs/kloc-0 (medium-sized reservoirs 1 4 reservoirs/kloc-0). Up to now, the first batch of dangerous reservoirs reinforcement projects invested by the central government have been basically completed. The second batch of reinforcement projects for dangerous reservoirs invested by the central government started in an all-round way, with a total investment of 654.38+0.2 billion yuan. All plans have been issued and the project implementation is progressing smoothly. Shagang Reservoir plans to invest 26265438+ 10,000 yuan. The plan has been issued and the implementation plan is being prepared. Third, the construction management procedures are further standardized. According to the principle of hierarchical management, the work responsibilities are clear, the fund management is strict and the construction management is standardized. Fourth, the continuous construction of reservoir irrigation areas and the steady progress of water-saving transformation. The supporting construction and water-saving renovation project of the irrigation area of the dangerous reservoir was completed in an all-round way, with an investment of 54.4 million yuan, and the engineering facilities of the irrigation area were obviously improved. At the same time, we also attach great importance to the management of irrigation test stations. This year, the provincial water resources department approved the xxx drainage experimental station in our city as a provincial key station. The station actively cooperates with universities and scientific research units to carry out special research on agricultural irrigation, and many scientific research achievements have won national and provincial awards; Combined with the water-saving reconstruction project of reservoir irrigation area, the observation facilities of xxx irrigation test station were completely updated and reconstructed.
(2) The Municipal Water Conservancy Bureau continues to increase investment attraction.
First, attract investment. At the beginning of the year, a mobilization meeting for investment promotion of the city's water conservancy system was held to arrange and deploy investment promotion work. Regular symposiums on investment promotion were held to supervise the investment promotion, which effectively promoted the investment promotion. The city's water conservancy system attracted nearly 500 million yuan, and the Municipal Water Conservancy Bureau introduced five investment projects with an investment of 1, 0 1 ten thousand yuan. Actively participate in the water supply project of cooperation between xx Water Supply Company and xxx Co., Ltd., and fully introduce Hongyuan Titanium Project invested by xxx merchants, with a total investment of 80 million yuan and a first-phase investment of 30 million yuan, which has been officially put into production. Help Wudi County to introduce Tianjin merchants to invest in the construction of chemical fertilizer processing projects, and introduce construction funds of180,000 yuan, which will be completed and put into operation in 10. Help Zouping Mingji Town Shandong Zeyong Industry and Trade Technology Co., Ltd. to introduce a jet weaving project with an investment of 55.7 million yuan.
(3) At present, there are still many difficulties and problems in reservoir reinforcement and construction management.
The reservoir project management unit is a quasi-institution, and the daily management and maintenance funds of the reservoir are not included in the local financial budget. Competent departments and reservoir engineering management units must attach great importance to this work and actively strive for it. All reservoir project management units should overcome the fear of difficulties and wait-and-see mood, do everything possible to promote the system reform of reservoir management units, and lay a solid foundation for the benign operation of reservoir projects. Next year, all units of the Water Conservancy Bureau should conscientiously do a good job in reservoir flood control and drought relief. Second, we must continue to do a good job in reservoir reinforcement. Third, we should vigorously promote the work of irrigation areas and experimental stations. Fourth, we should gradually carry out the assessment of project management objectives. Fifth, strive to improve the modern means of project management. Sixth, strive to promote the reform of the project management system.
Summary of Water Conservancy Work The year of 4 xx is the third year for our town to implement the "Twelfth Five-Year Plan", and it is also a crucial year for our town's water conservancy development and reform. Focusing on solving the bottleneck problem of water resources that puzzles the sustainable development of our town's economy, focusing on the construction of "ecological water conservancy", we will provide a good water environment for the sustainable development of our town's economy and society and the ecological establishment of our town.
1, flood control and drought relief work
Since the flood season this year, measures such as strict flood control responsibility system, storing flood control materials, building flood control teams, dredging rivers and unblocking information have been taken. Immediately deal with hidden dangers of flood control and problems existing in flood control safety work to ensure flood control safety.
At the same time of flood control, we must not neglect the drought relief work. First, professional technicians are invited to inspect, maintain and support the well. Secondly, strengthen irrigation management, vigorously promote water-saving irrigation technology, and implement furrow irrigation for spring irrigation white land to fully improve water utilization and effectively alleviate spring drought.
2, irrigation and water conservancy infrastructure construction
The investment in irrigation and water conservancy infrastructure in the town has been continuously increased, and farmers' awareness of labor input has been continuously improved. This year, the renovation project of low-yield fields in six villages 1 1000 mu in Nantiangong, Xitiangong, Nanshe, Beishe, Jia Cun and Guocun was completed, and the 1 1 machine room was built, with 56 wells drilled.
3, rural drinking water safety and winter drinking water safety work
In xx, on the basis of completing the reconstruction of the water network in Dongtiangong, the drinking water safety project in Guocun was implemented, and the pipeline was reconstructed, with a total investment of 80,000 yuan, which solved the drinking water safety problem of10.4 million people.
According to the arrangement of the superior, do a good job in winter water safety in the whole town. Villages timely implement winter water safety and set up warning signs.
4, reservoir resettlement support work
Over the past Xx years, we have actively cooperated with the Water Conservancy Bureau to complete the annual reservoir resettlement audit and support fund distribution according to the arrangement of superiors.
5, soil and water conservation work
The town planted more than 450 mu of walnut trees, which effectively promoted soil and water conservation.
Over the past year, with the strong leadership and strong support of the Municipal Party Committee and the Municipal Government, Qi Xin, a township cadre in our town, has made concerted efforts, and up to now, the water conservancy task has been successfully completed.
Overview of water conservancy work Chapter V Water conservancy is the lifeblood of agriculture and an important foundation for national economic and social development. Persistently strengthening the basic construction of farmland water conservancy is the primary task of water conservancy construction and the objective requirement of building a new socialist countryside. Through the construction of farmland water conservancy, we can effectively improve the agricultural production, living and rural ecological conditions in our region, promote the adjustment of rural economic structure and increase farmers' income, and provide strong water conservancy support for the construction of new countryside and the realization of transformation and leapfrog development and sound and rapid economic development in the whole region. The farmland water conservancy work in our region this year is summarized as follows:
First, rural drinking water safety work
Our region insists on ensuring safe drinking water as the top priority of people's livelihood and the primary task of water conservancy work in the region. The drinking water safety task issued by the Municipal Bureau this year is to solve the drinking water safety problem of 5 100 people in xx4 administrative villages. The drinking water safety project in xx has been completed, and preparations for equipment installation are under way in xx3 village. After the completion of the project, the water quality of these four administrative villages will be improved, and the production and living standards of farmers will be further improved.
At the beginning of the year, our district plans to drill 3 deep wells in xx. At present, xx well drilling project has been completed, and xx two-way pipe network laying project has been completed. At present, the drilling is 560 meters, and the drilling task is expected to be completed this year. After the completion of xx, the problem of drinking water quality in xx will also be solved.
This year, the water supply pipe network of xx village was reformed, so that the household tap water rate reached 100%, and the water supply pipe network of xx village was reformed. These two projects have obviously improved the water quality of the two villages, met the villagers' domestic water demand and significantly improved their living standards.
Second, the construction of soil and water conservation forest project
This year, in order to complete the task of controlling the soil erosion area of 3,000 mu issued by the Municipal Water Affairs Bureau, our bureau carried out the ecological project of soil and water conservation forest in xx3 village, mainly planting large-scale Pinus tabulaeformis, Platycladus orientalis and Acer truncatum, with an investment of about 30,285,500 yuan. Now that all planting tasks have been completed, it is of great significance to implement the water and forest conservation project for conserving surrounding water sources, conserving soil and water, improving water quality and improving microclimate.
Three. Regulation project of key reach in the upper reaches of Nanshahe River
In order to carry out the "urban and rural cleaning project" in depth, improve the overall flood control capacity of the river, create an ecological river, create a safe, civilized, beautiful and clean environment for the citizens, and ensure the flood safety of the river, our bureau has rectified the river in xx section of the upper reaches of Nanshahe River with a total investment of 7,920,400 yuan. At present, the two river regulation projects have all been completed, which is of great significance to realize the basic functions of the river, improve the river environment, provide green ecological space and ensure flood control safety.
Fourth, the river dredging project
Combined with the urban and rural clean-up project, before the flood season, our district carried out dredging and clearing of obstacles and garbage, with a total area of 1.08 million cubic meters; The open channel and culvert section of xx flood discharge canal were dredged, and the dredging was 3500 cubic meters, which kept the river clean and ensured the safety of flood control facilities.
Five, xx reservoir reinforcement project
The investigation and design of the reinforcement project of Xx Reservoir has been completed, and has passed the expert review, and the provincial water resources department has also approved it. At present, the project is inviting tenders, and it is expected that all preparatory work before construction will be completed before the end of the year. Construction will begin next year, mainly to reinforce the dam and rebuild the spillway. After the reservoir is reinforced, its flood control capacity will meet the requirements of flood control standards, which is of great significance to the flood control safety of 4910.6 million people in our city and many schools, highways and railways around the reservoir.
Over the past year, our bureau has vigorously carried out the construction of farmland water conservancy, which has effectively improved the agricultural production, living and rural ecological conditions in our region and improved the comprehensive agricultural production capacity. In the capital construction of farmland water conservancy in the new year, we will constantly update our ideas, adjust our thinking, reform and innovate, speed up the development of farmland water conservancy construction in the new period, further promote the improvement of rural production and living conditions, promote the construction of new socialist countryside, and create a new situation in the capital construction of farmland water conservancy in the whole region.