Current location - Quotes Website - Collection of slogans - Summary of flood control and drainage disasters
Summary of flood control and drainage disasters
The summary must have an overview and a description of the situation, some simple and some detailed. This part mainly analyzes the subjective and objective conditions, favorable and unfavorable conditions, working environment and foundation. The following is a summary of flood control and waterlogging disasters I brought to you, hoping to help you!

Summary of flood control and drainage disasters 1

On April, after the flood control work conference in the whole region was held, the street party committees and offices attached great importance to it and made arrangements in advance. In accordance with the principle of "unified command, hierarchical management, comprehensive defense, and key strengthening", with the safety of flood control in the jurisdiction as the goal, the starting point is to prevent major floods, grab major risks, and save major disasters, and the foothold is to pay equal attention to disaster prevention and mitigation, emergency rescue, and formulate practical flood control work plans to ensure the safety of people's lives and property. The report on the implementation plan of street flood control work is as follows:

First, convey the spirit of the meeting and improve ideological understanding.

After the flood control work conference in the whole region, the sub-district office held a special meeting on flood control, which conveyed the spirit of the flood control work conference in the whole region and made arrangements according to the actual situation. First, overcome the paralysis thought, deeply realize that the street jurisdiction is located in the city center, with many key parts, and strictly guard against the paralysis thought of "flood control without flood season"; Second, we must do a good job in preventing hidden dangers, fully realize that there are still problems such as the aging of municipal and hydropower facilities, dangerous houses in bungalows, hidden dangers in basements, and poor drainage of urban low-lying water, and check and register in advance to formulate effective measures; The third is to reserve flood control materials, and prepare necessary sandbags, pumps, shovels, colored strips, woven bags and other related flood control materials through the combination of flood control headquarters and property management companies in accordance with the emergency response requirements at all levels in the flood control emergency plan. Fourth, it is necessary to form a militia flood control and rescue team, enter a state of war, and ensure that it is on standby at any time.

Second, set up a leading body and clarify the division of responsibilities.

According to the form of flood season this year, combined with the characteristics of urban flood control, the office set up a flood control headquarters, and made it clear that the party secretary is the political commissar, the director of the office is the commander, other team members are the deputy commanders, and the party branch secretaries of various communities are members. Implement the leadership subcontracting responsibility system, implement the responsibility layer by layer, and form a strict organizational network. The headquarters office is located in the Armed Forces Department, responsible for the daily work of flood control and handling emergencies at any time. In addition, six working groups were established to clarify the tasks of each working group.

1, comprehensive coordination group

Be responsible for the overall flood control work in the area, ensure the normal operation of the flood control emergency command system, ensure the smooth communication of information, report the weather and flood in the area, the disaster-stricken site and the flood control arrangements and progress at any time to the headquarters, promptly issue various instructions from the headquarters, organize and mobilize all forces to carry out flood control and disaster relief work, and fully protect the lives and property of the people and ensure the safety of flood control.

2. Flood Warning Team

Responsible for meteorological monitoring, flood warning and forecasting, flood analysis, flood control advice, etc. , timely release flood forecast information to the headquarters and community neighborhood committees, and earnestly do a good job in flood control forecast and early warning work in the area.

3. Flood control and emergency rescue team

Responsible for the emergency rescue work of municipal, hydropower facilities, dilapidated buildings in bungalows, low-lying basements in residential areas, low-lying water accumulation areas in cities and other key parts; Responsible for the transfer and resettlement of affected residents, and ensure the safe transfer and proper resettlement of the masses.

4, material support group

Responsible for the preparation, dispatch and supply of flood control materials, and ensure that flood control materials and materials arrive at the designated place on time.

5, health and epidemic prevention group

Responsible for the health and epidemic prevention and medical rescue work during the flood control period in the jurisdiction. If there is any abnormality, medical instruments and medicines should be prepared in advance, and disinfection and epidemic prevention work in public places and crowded places should be done at any time during and after the flood season to prevent and control all kinds of infectious diseases to the maximum extent.

6. Publicity Group

Responsible for the publicity and reporting before, during and after the flood season, improve the flood control awareness and participation awareness of the whole people, and release early warning information to the public through television, radio, internet, information and other channels with full coverage and high density to remind the general public to adjust their travel plans in time and avoid risks; During the flood season, we should pay attention to excavating and publicizing the advanced experience of flood control and drainage, typical units and individuals, take the rapid assembly and evacuation of emergency rescue teams as important materials, timely report the deployment of flood control work of street party committees and offices and the advanced deeds of flood fighting and rescue, and do a good job in the on-site publicity and reporting of flood fighting and rescue in our office.

Third, revise the emergency plan and set up an emergency team.

According to the requirements of the meeting, the street made an emergency plan. The headquarters took the lead in perfecting and refining the responsibilities and authorities of four-level emergency response, such as command steps, rescue deployment, transfer and resettlement, and post-disaster disposal; The armed forces department took the lead in setting up a 30-member militia emergency team to carry out flood control and emergency rescue; Led by various communities, a property flood prevention and rescue team was established; Flood control materials shall be prepared in the form of integrated support. All communities require property management companies within their jurisdiction to prepare enough pumps, sandbags, shovels and power generation equipment as a first-line preventive measure. Sub-district offices should prepare relevant life-saving materials and vehicles as emergency rescue support.

Fourth, strengthen the investigation and supervision of hidden dangers to prevent ineffective rectification.

According to the requirements of the flood control work plan, the key parts with hidden dangers such as dangerous houses, low-lying garages, basements, damaged manhole covers, low-lying stagnant water areas, power facilities and construction sites were investigated by dragnet. After investigation, it was found that there were 0/5 households with dangerous houses, 0/5 bungalows, 2 low-lying waterlogged areas and 3 construction sites. Second, the manhole covers in low-lying stagnant water areas have all been cleaned up; Third, in view of the hidden dangers of deep foundation pits in construction sites, the responsibility for safety prevention of construction units should be implemented to people; Fourth, community organizations are required to set up emergency teams in flood season for property companies under their jurisdiction; The fifth is to instruct the property companies in the jurisdiction to prepare flood control materials and focus on protecting the low-lying water floors in the community.

Five, strengthen the duty system to ensure safety in flood season.

Government departments and communities strictly implement the 24-hour duty and leadership shift system to ensure that duty is not empty during the flood season. In case of flood, the main leaders of the party and government insist on being on standby in the organs every night, paying close attention to the flood, handling emergencies and supervising on the spot. Members of the street leadership team insisted on in-depth subcontracting community command at the first time, grasped first-hand information and conducted supervision. All members of the Bureau are on duty 24 hours a day to ensure the immediate handling of dangerous situations, smooth communication tools, timely and accurate transmission of flood information, and standby at any time to ensure the timely transmission of flood control information and related instructions.

This year's flood control work is another test for us after the heavy rainfall the year before last, and we shoulder the heavy responsibility of "keeping one side safe". To this end, we should carry out our duties, cooperate closely and make concerted efforts to ensure the safety of people's lives and property in the area in accordance with the requirements of "preparing for disasters without disasters and preparing for disasters with minor disasters".

Summary of flood control and drainage disasters II

_ _ city is the capital of _ _ province, located in the north-central part of _ _ province, and five wild cities, such as Ganjiang River and Fuhe River, on the shore of Poyang Lake. It governs five development zones (new zones) in four counties, five districts, with a total area of 7,400 square kilometers and a total population of 4.75 million. In 2065, it was 43.8+040.9 billion yuan, and the city's GDP in 2005 was 654.38+040.9 billion yuan. _ _ City is low-lying and prone to floods. It is one of the first 25 key flood control cities in China. There are more than 7,400 water conservancy projects in the city, including 72 flood dikes with a total length of1128km, 489 small and medium-sized reservoirs, and the total installed capacity of electromechanical irrigation and drainage stations is 230,000 kilowatts. After 1998, with the strong support of the Provincial Water Resources Department of the Ministry of Water Resources, the urban flood control and drainage standards in our city have been significantly improved. Two once-in-a-century flood control encirclement zones in Changnan and Changbei have basically taken shape, and the total installed capacity of power lines in urban areas has reached 25,000 kilowatts. The drainage standard reaches once every 20 years, and the rainstorm is discharged once a day. The main dikes in urban areas are Youdayou Dike, Gandong Dike, Nange Dike and Jiangyan Dike. The main drainage stations are Qingshan Lake Drainage Station, Xinzhou Drainage Station, Qianhu Drainage Station and Yu Wei Drainage Station.

Since the beginning of this year, the city has closely focused on the center of "people-oriented, ensuring the safety of people's lives", based on the prevention of major floods, resistance to major floods, grabbing major risks and saving major disasters, making careful arrangements, doing solid work, and making various flood prevention preparations from early, strict and practical. Related scenarios are reported as follows:

I. Flood prevention preparation plan

1, the flood control responsibility system is implemented. Before the flood season, the three-level flood control headquarters of cities, counties and townships and the members of the flood control headquarters have been adjusted in place, and the flood control responsibility system with the chief executive responsibility system as the core has been strictly implemented. The administrative responsible persons of important dikes, reservoirs and flood storage and detention areas shall be the leaders at or above the county level. From the end of March to the beginning of April, cities, counties and townships held flood control work conferences at all levels, and issued flood control target task books at all levels, which made comprehensive arrangements for flood control work this year. Carry out flood control inspection for 3 times, and issue rectification notices one by one for the problems found in the inspection, and make rectification in place within a time limit. City, county and township three-level prevention offices are on duty 24 hours from April 1 to ensure smooth information.

2. Set up a flood control team. The city has set up a mass flood control and rescue team of 6,543,800+3,000 people, and the municipal defense assembly has set up a surprise rescue team of 37,000 people. 549 safety administrators of 482 small reservoirs in the city have all completed their employment and re-employment, and all of them are in place to carry out inspections and duty reports during the flood season; The 87 township defense offices in the city have been further optimized and equipped with full-time and part-time personnel.

3. Formulate and improve the flood control plan. In order to effectively deal with emergencies, the municipal government issued an emergency plan for flood control and drought relief in _ _. According to the preparation procedures and requirements of flood control schemes for water conservancy projects, flood control schemes for dikes, reservoirs, flood storage and detention areas and other water conservancy projects are prepared and implemented as scheduled. Further improve the residents' transfer plan in the mountain flood danger area and the flood control plan for flood crossing construction and dam break.

4. Prepare enough flood control materials. In order to make up for the straw bag consumed in the anti-freezing disaster at the beginning of the year in time, the municipal finance arranged a special fund of 6,543,800 yuan. At present, straw bales have been replenished to the quantity before freezing. According to statistics, there are 2.38 million straw bags, 4.09 million woven bags, 360,000 sacks, 290,000 pebbles, 48,000 stones, 3,435 life jackets, 80 lifeboats, 2 lifeboats, and assault boats 1 1 boat, all reaching or exceeding the planned number.

5. Implement flood control funds. City and county finance further increased investment in flood control funds, and the municipal finance arranged 6 million yuan for the purchase of flood control materials, the construction of small water conservancy projects and the reinforcement of reservoirs; _ _ county financial investment of 2.8 million yuan for the restoration of water-damaged projects and the purchase of flood control stones and straw bags; _ _ County financial investment is 6,543,800 yuan+0.7 million yuan to rectify the water damage projects of six important dangerous sections; Other counties and districts have also arranged funds for flood control and danger removal. In 20 15, 550,000 yuan has been allocated for municipal flood control work, and no less than 200,000 yuan has been allocated for county flood control work; In 20 15, 474,000 yuan of reservoir inspection and flood reporting fees in provinces and cities have all been allocated to relevant counties and districts, and have been distributed to people. The funds for reservoir flood reporting in 20 15 are being arranged.

6. Prepare for the project. Last winter and this spring, the city invested1.20 billion yuan in capital construction of farmland water conservancy, implemented 40 reservoirs to meet the standards, raised and reinforced dikes by 60 kilometers, dredged rivers 1.654 and 38+0.8 kilometers, and repaired 963 water-damaged and ice-damaged projects and dangerous sections. Of the 197 dangerous reservoirs listed in the national dangerous reservoir reinforcement plan, 18 1 has completed the dangerous removal and reinforcement, and 24 dangerous reservoirs listed in the national special plan have started the preliminary work and started construction before the end of the year to ensure that the dangerous reservoirs are capped within three years.

7. Implement flood control works. Access, electricity and telephone have been basically realized for dikes with an area of over 50,000 mu and small key (Class I) and above reservoirs in the city, and access, electricity and telephone have been realized for most other flood control projects. The city and county flood control networks have been interconnected, and the barrier-free link with the municipal emergency command system has been realized; The special treatment of sand mining in Nanchang section of Ganjiang River will be implemented, and all sand mining vessels will dock in April 1.

Second, the next stage of work arrangements

Taking the visit of Vice Minister Zhou Ying and his party to our city as an opportunity, we thoroughly implemented the general instructions of the State on flood control and the spirit of the flood control work conference of the whole province, and constantly tightened the string of flood control, so as to make preparations without water and with water, and solidly promote various flood control preparations.

1, for flood control inspection. From April to May, two flood control inspections were arranged, namely, the flood control inspection of the member units of the Municipal Defense General and the flood control project inspection of the whole city. The inspection focuses on five aspects: first, the investigation of hidden dangers in small and medium-sized reservoirs; Second, flood control measures for water conservancy projects under construction; Third, the dangerous sections of important dikes, dike-breaking projects and dike-crossing buildings; The fourth is the reserve of flood control materials; The fifth is the scene of river clearing obstacles. Timely rectify the problems found in the inspection.

2. Carry out flood control knowledge training. It is planned to hold a city-wide flood control knowledge training course in early May to train flood control commanders, reservoir safety administrators, flood control mobile rescue team members and directors of township flood control offices.

3. Conduct exercises for the flood control team. It is planned to organize municipal flood control mobile rescue teams, militia boat companies and diver detachments to carry out rescue drills in mid-May to further improve the actual combat capability of flood control.

4. Strengthen emergency management. Adhere to the flood control duty system, strengthen the duty force in time according to the needs of flood control, and ensure the smooth flow of flood control instructions and information. Strengthen the early warning and forecast of rainstorm and flood, do a good job in flood control and drainage command and dispatch, and ensure the safety of flood control projects and people's lives and property.

5. Be prepared for drought resistance. Adhere to both flood control and drought relief, and both hands should be hard. While doing a good job in flood control, we should actively prepare for drought prevention and drought relief, strengthen the dispatch of various water storage projects, reasonably intercept the "last rain" at the end of the flood season, and reserve drought-resistant water sources.

Summary of flood control and drainage disasters 3

First, continue to strengthen flood control and disaster relief work.

All localities, especially Changsha, Yiyang, Yueyang and other places, should clearly realize that the current situation of flood control and disaster relief is still severe and complicated, and further implement the flood control responsibility system with the chief executive responsibility system as the core, and there must be no paralysis, luck or relaxation. According to the requirements of flood control and emergency, all localities should always be on high alert, overcome the unfavorable factors such as fatigue and paralysis, and unremittingly do a good job in the "investigation, treatment, prevention and rescue" of the dikes of Xiangshui, Zishui, the main stream of Shui Yuan and Dongting Lake area during the current water withdrawal period. Effectively strengthen the key defense and protection of weak and dangerous sections of dikes. Continue to do a good job of 24-hour duty, and resolutely put an end to the phenomenon of off-duty, missing posts and empty posts. It is necessary to strengthen the work of information submission, timely, accurately and comprehensively grasp and report information such as disasters and dangers, and resolutely put an end to late reporting, omission, concealment, false reporting and omission.

Second, properly resettle the affected people.

All localities should earnestly do a good job in the resettlement of the affected people, especially those whose houses are completely demolished and urgently transferred, strengthen organizational leadership, clarify the responsibilities of special personnel, implement resettlement measures, and make every effort to ensure that the affected people have food, clean water, clothing, safe shelter and timely treatment for illness.

Third, do a good job in health and epidemic prevention and food safety.

All localities and relevant departments should do a good job in post-disaster health and epidemic prevention, strengthen epidemic monitoring, improve the health environment in disaster areas, and prevent epidemics. Timely and harmless treatment of dead animals to prevent the occurrence of highly pathogenic epidemics. It is necessary to organize professional epidemic prevention teams, mobilize the affected people, strengthen disease prevention and monitoring, adhere to the elimination of stagnant water and follow-up of disinfection and epidemic prevention, earnestly do a good job in environmental disinfection, prevention and control of "four pests", monitoring and disinfection of drinking water sources, and focus on the comprehensive disinfection of key parts such as schools, resettlement sites for affected people, food processing plants, livestock and poultry breeding sites, and farmers' markets to ensure that there are no dead ends and no epidemics. It is necessary to strengthen food safety inspection and resolutely put an end to food of unknown origin, animals that died for unknown reasons and fruits and vegetables that have been soaked in floods flowing to markets and dining tables.

Fourth, actively carry out self-help in production.

Party committees and governments at all levels should promptly organize disaster relief working groups to go deep into the disaster areas to investigate disasters and nuclear disasters, effectively solve the main difficulties and problems faced by resuming production, and actively carry out self-help in production. Water conservancy, agriculture, forestry, civil affairs and other departments should go deep into the front line of the disaster area, comprehensively find out the disaster situation, formulate targeted and operable production self-help guidance programs according to different disasters, integrate funds, make overall arrangements, implement disaster relief policies, and actively do a good job in production self-help and post-disaster reconstruction.

Five, pay attention to the maintenance and protection of infrastructure.

All localities should seize the favorable weather, organize personnel and equipment in time, make every effort to repair damaged infrastructure such as water conservancy, electricity and transportation, and realize access, water supply, electricity and communication as soon as possible, so as to provide a strong guarantee for disaster relief and ensure the normal production and living order of the people.

Sixth, strictly implement the responsibility for disaster relief.

Party committees and governments at all levels should implement their work responsibilities, carefully study disaster relief measures, refine their work plans, and increase assistance to the affected people in production and self-help. All relevant departments at the provincial level should attach great importance to the assistance work in disaster areas, clarify their work responsibilities, conduct special research and special deployment, and combine their respective functions to provide assistance to the disaster areas to the maximum extent. The financial department should speed up the allocation of disaster relief funds and strengthen the supervision of funds; Civil affairs departments should implement policies and measures for disaster relief and benefiting the people, and effectively help people in need to solve practical problems; Land and resources, transportation, water conservancy, agriculture, forestry and other departments should strengthen technical guidance to the affected areas and increase relief efforts.

Summary of flood control and drainage disasters 4

The first is to further strengthen the sense of responsibility.

Party and government leaders at all levels and those responsible for flood control should always stick to their posts, go deep into the front line of rural areas and the scene of emergency rescue and disaster relief, master the rain, water and disaster situation within their jurisdiction, implement various countermeasures, guide flood control and disaster relief work, mobilize and organize all forces to carry out emergency rescue and disaster relief in the affected areas, and ensure that property losses are minimized.

Second, further strengthen transfer hedging.

Adhere to the safety of life as the first priority, and promptly and decisively transfer people in dangerous areas such as the lower reaches of reservoirs, hidden dangers of geological disasters in mountain torrents, low-lying areas in urban and rural areas, and dilapidated houses. The transfer of the transfer, the hedging of the hedging and the proper placement will ensure the safety of people's lives.

Third, further strengthen inspections and eliminate risks.

It is necessary to strengthen traffic control in dangerous areas such as wading roads, bridges and tunnels, set up safety isolation signs to guide pedestrians and vehicles away from dangerous areas and ensure the safety of people's lives. Schools with traffic interruption and stagnant water should take decisive measures such as suspension of classes to ensure the personal safety of primary and secondary school students.

Fourth, further strengthen flood control discipline.

Strict implementation of the 24-hour flood control duty and leadership shift system, the relevant personnel should keep abreast of the rain, water and disaster situation, and report the information in a timely manner according to the regulations, and shall not conceal, delay or omit the report. Strict flood control discipline, strengthen accountability, and severely deal with those who have a significant impact on flood control and dereliction of duty.

Summary of flood control and drainage disasters 5

The first is to raise awareness and unify thoughts with the decision-making and deployment of the party Committee and government.

* * * The Youth League is the party's assistant and reserve army. At the critical juncture of flood fighting and disaster relief, league organizations at all levels in the province should unify their thoughts and actions with the major decisions and important arrangements of party committees and governments at all levels on flood fighting and disaster relief work, actively mobilize and organize the youth members to actively participate in flood fighting and disaster relief work, and gather to form a youth force for flood fighting and disaster relief. League organizations at all levels should, in light of the actual situation, make timely arrangements and careful arrangements for flood control and disaster relief work, clarify tasks, establish mechanisms and implement responsibilities, and organize the majority of youth members to participate in flood control and disaster relief work in an orderly and effective manner.

Two, act quickly, mobilize and organize the majority of young members to actively participate in flood relief work.

The party has a call and the regiment has an action. League organizations at all levels should quickly mobilize and organize young members to join in flood control and disaster relief work, set up youth commandos and youth volunteer service teams, take the initiative to undertake urgent and dangerous tasks, and play a good role as fresh troops and commandos in the process of dam reinforcement, personnel evacuation, mass resettlement and logistics support. It is necessary to carry forward the fine tradition of "one party is in trouble and all parties support", give play to the role of youth organizations such as youth federations, young entrepreneurs associations, youth foundations and young volunteers associations, integrate resources from all sides, and help the affected people overcome difficulties, reduce disasters and rebuild after the disaster. It is necessary to obey the unified deployment and arrangement of the local flood control and disaster relief headquarters, pay attention to personal safety, and steadily promote flood control and disaster relief work without adding chaos.

Third, strengthen publicity and promote the positive energy of flood control and disaster relief.

League organizations at all levels should make full use of newspapers and magazines, websites, Weibo, WeChat, SMS, instant messaging and other new media tools to timely release flood control and disaster relief information, safety tips, disaster reduction knowledge, etc., so that the masses can keep abreast of the latest progress of flood control and disaster relief, and enhance their awareness of prevention and safety in flood control and disaster reduction. It is necessary to vigorously publicize the advanced models and deeds of young people emerging in the process of flood fighting and disaster relief, give play to the exemplary role of role models, rally people's hearts, invigorate morale, carry forward positive energy, and help the affected people establish their determination and confidence in overcoming floods.

League organizations at all levels in the province should strengthen emergency duty work, implement the leadership shift and duty system, and ensure that emergency duty measures for flood control and disaster relief are put in place. Strengthen information communication and timely report flood control and disaster relief work and disaster information.

Summary of articles related to flood control and waterlogging elimination;

★ Summary of flood control and fighting in 2022

★ 2000 words summary of flood control and flood fighting work.

★ Summary of Flood Relief Work in Henan 202 1 Latest

★ Five Summaries and Selected Works of Reservoir Flood Control

★ 202 1 summary of flood control work in Henan province

★ Summary of flood fighting and emergency rescue of fire forces: 5 articles.

★202 1 summary of flood fighting and emergency rescue work in Henan.

★ Latest 202 1 Summary Report on Flood Control in Henan Province

★ The latest selection of 5 experiences in flood fighting and disaster relief in 2022.

★ 2065438+2008 flood control and disaster relief experience model essay