1 first of all, you should be familiar with various measures of waterproof structure of steel structure, and waterproof materials are also essential.
2, building selection, in order to ensure the waterproof effect of the grid structure, try to choose a single roof form, avoid ditching in the building, and try to use the outer gutter for the side ditch. As for the choice of materials, it is also necessary to make a reasonable choice according to the drainage slope and slope length.
3. Drainage organization, the intensity of precipitation in different regions is different, so when designing drainage organization, we should fully refer to some precipitation data to rationally arrange drainage points.
In fact, in the rainy season, we should also pay attention to the installation of gas stations. The specific installation method is as follows:
The first way is to weld the whole product directly and complete it as a whole, then hang the whole frame into the air with the corresponding ceiling, and then weld the shelf to the corresponding position within a certain hovering time to connect it with the whole building. This method is faster, but it also needs a strong operation team.
The second method is much milder. This method is direct aerial work, and the grid is installed bit by bit through the intersection with the building, that is, from the four sides to the last central point. This construction method will be slower in time, but the operation difficulty will be much reduced.
The third method is mainly suitable for quadrangular pyramid structure and triangular pyramid structure. We can build all the pyramid structures in the grid structure in advance, and then when installing, we only need to use the slider step to assemble these structures together, which can effectively complete the whole project.