Integrated wall installation method points for attention in integrated wall installation
Wall decoration is very important to the whole family. When decorating the wall, in order to better protect the environment and reduce pollution for people in the family, integrated wall has become the mainstream product of wall decoration at present, but people don't know how to install it when choosing integrated wall. Next, Bian Xiao will bring you the installation method of integrated wall.

First, the integrated wall installation method

1. Preparation materials: art knife, table cutter (choose high-speed serrated saw blade), grinder (serrated saw blade), ruler, tape measure, triangular file, curve saw, 3P air pump, cement nail gun, wooden side: mainly used for the structural part of the top return air area. Wood board: mainly used for background wall. Corners: Some corners are closed. Facilities calculation: The estimated wall area used in the family decoration scheme is 3 times of the building area, basically including the wall and the top. The basic installation area is in this area. The method of measuring the actual area of a family is to basically ensure that the height from the top to the ground is not less than 2.75M after the completion of the tropic area according to the actual estimated area, which can provide a lot of protection in the installation process after calculation. Consumers bring unnecessary losses.

2. Prepare materials: Make sure to prepare two identical walls. The background wall needs to be spliced in many places, and the material is more than 0.5 square meters. Construction steps: wood structure of top return belt and background wall: according to design requirements, pay attention to wood structure when using. The wooden side structure has enough wall joint points. Go straight; Try to make the dimensions on both sides at right angles.

3. The structure is relatively firm; After the wood structure is completed, the actual wiring is carried out and the electrical wiring is reserved. Water pipe layout and floor installation. Install an integrated wall at the top. When installing, install the integrated wall from the top. In the process of cutting plates, the cutting surface of materials must be smooth and burr-free. The higher the speed of the cutting saw, the less burrs there are. The measured size must be within the error range of 2MM, otherwise the joint will be very irregular. Install the wall and background wall. In the installation process, such as corner line, foot line, waist line, door cover line, window cover line, etc. We have used it all, so we have to install this line and install the whole wall.

Second, the integrated wall installation considerations

1. The problem of integrated wall protection film, in order to protect the integrated wall clean and beautiful, integrated wall manufacturers will cover the surface with a film so as not to be scratched. The film needs to be torn off before installation, and the slogan of tearing off before installation is also marked on the film, but many people still consider the dust problem when installing the integrated wall. Tear it off after installation.

If you want to tear off the integrated wall after installation, it is difficult to tear off the protective film in the liner, which will affect the appearance. The integrated wall has been installed on the shackle, and the protective film was torn off during the installation. It will be more compact without any gaps. If you put it on and tear it, there may be a gap.

2. The wall surface is too uneven, and the installation requirements of the integrated wall surface are not high. You can directly install the blank wall, but the wall surface is too uneven to be processed. Because the room size of the blank is irregular, please avoid heightening the wall when there is deviation between the left and right sides of the wall, because the intersection of two boards will lead to a large gap and affect the appearance. Just cut a slot in a piece of paper. You can fill the wall with gypsum or cement. Test the wall height through a horizontal line. If you don't keep a certain level, you can also use the method of installing wooden strips to level the wall.

3. When dealing with the bending problem, the bending of the wall is inevitable, so the bending treatment of the whole wall is also very important. Right-angle bending: in the process of bending, the wall thickness must be considered in the bending line. Pay attention to the bending process, first bend the bending line, and then use the slotting knife to slot.

The above is the introduction of integrated wall installation that we bring to you.