Work summary of building safety personnel;
Since it was transferred to _ _ _ _ _ _ _ General Contracting Project Department in June+February, 65438, under the guidance of Master X and other predecessors, through their own efforts, they have a further understanding of safety work, not only mastering the basic knowledge of site safety, but also realizing the importance of safety to construction. The main work is as follows:
At present, the production has been safe for nearly _X days, and the Safety and Quality Department has carried out strict management from all aspects, and urged the implementation of various safety management measures to ensure production safety without casualties and major safety accidents.
The Project Department entered the site at the beginning of June 1 1, established a safety management system, set up a safety leading group, and compiled a compilation of the management system, which was checked and signed by the heads of various departments (posts) of the Project Department, and the project director gave orders to the heads of various departments, formulated a breakdown table of safety responsibility objectives, and clarified their respective post responsibilities.
Implement the safety technical disclosure system, so as not to leak jobs, and make disclosure to the personnel of each operation team. Establish the account of safety education and training for operators, the account of special operators and the account of safety technical disclosure for each type of work. Sign safety production agreements with subcontractors. Do a good job in daily safety management and improve the internal information of safety management.
Establish machinery and equipment safety management institutions, and implement machinery and equipment entry acceptance system. Designate a special person to be responsible for the large-scale special equipment, and compile the Safety Management System for Tower Crane, Maintenance System for Construction Lifting Machinery, Rules and Regulations for Safety Production of Tower Crane, Construction Scheme for Tower Group Operation, and Management Regulations for the Use of Lifting Rigging. Check the tower crane and other equipment regularly, handle the registration formalities of special equipment in time, and establish the account of mechanical equipment in and out. Special training and technical disclosure shall be given to tower operators, signalmen and cable workers on a regular basis, with certificates, and a daily inspection system for lifting rigging shall be implemented to curb the occurrence of major safety accidents of mechanical equipment from the source.
Organize regular joint safety and quality inspection, ten-day inspection and monthly inspection. Make inspection records, formulate rectification notices for potential safety hazards, and follow up the rectification results according to the four principles. Establish a major hidden danger management account.
Implement the construction scheme and management measures of fire control facilities, designate special personnel to be responsible for managing the number of fire extinguishers and hydrants placed in fixed places, and conduct regular inspections. Organized 1 fire emergency drills. 2 times of fire protection knowledge training, implementation of hot work approval system, special fire safety technical disclosure, comprehensive technical disclosure of open fire operation in key parts, supervision and inspection of safety protection measures on the construction site. Sign a fire safety responsibility letter with the operation unit.
Looking back on the safety management work in _ _ _, the construction site is in a safe and controllable state, with zero casualties and no fire accidents. It is the result of careful planning by the leaders of the project department and the joint efforts of all departments to carry forward the team spirit. Although there is no obvious economic benefit in the supervision and implementation by the quality assurance department in construction management, the safety work should be done with care and managed responsibly. It is necessary to have all kinds of knowledge and practical experience in carrying out the investigation and inspection of potential safety hazards, and master certain methods for management, so as to be diligent in hand, eye, mouth and legs, and have a bad face and a hot heart. There is no safety accident at the scene, and the economic benefits are naturally prominent.
There are some shortcomings such as the implementation of the operator's real-name registration system, habitual and collective violations (helmets are not worn, and a few people smoke on the spot), so management should be strengthened and communication should be made with the safety management personnel of the ZuoYedui.
_ year work ideas:
1, further improve the safety management of the construction site, and cooperate with various departments to manage the site and office materials.
2. Do a good job in the entrance education and training of new workers, improve the safety technical disclosure system, and assist in organizing the implementation of safety training such as fire emergency plans.
3. The safety protection and fire control facilities above the ground of this project are the key points of safety management next year, and various construction schemes should be formulated in advance and supervised in the construction.
4. The safety management methods done well in _ should be detailed, and at the same time learn from the good management models of other projects to learn from each other. The safety management of this project has a long way to go and cannot be taken lightly. The goal is to achieve zero death in production safety, put an end to major safety accidents and ensure normal and orderly production safety.
In addition, comprehensively monitor the construction site to ensure safe production and advocate civilized construction. Try to create a safe, civilized, green and environmentally friendly working environment for everyone.
Safety work should start from dribs and drabs, but safety is no small matter. The success of an enterprise lies in safety, and the failure lies in accidents. All accidents can be attributed to management reasons. I know that my knowledge and skills are far from perfect, and my management methods are still lacking. Therefore, in the future work, I will study hard professional knowledge, improve my theory and management level, be strict with myself, improve myself, ensure the normal construction and reduce unnecessary losses.
In the new year, I will pay more attention to safety management, strictly follow the requirements and instructions of superior leaders, supervise and implement various safety management measures, ensure zero death in safety production, put an end to major safety accidents, and ensure normal and orderly safety production. In the future work and study, I still hope that the leaders will criticize and advise.
Summary of building safety personnel model work Part II;
20_ years, as a safety officer on the construction site, fully responsible for the safety management in front of the project department. Looking back on my work in the past 20 years, although there are some achievements, there are also some shortcomings. Now I will make a brief summary of my work in 20_:
First, the ideological aspect.
In my daily work, I always adhere to the spirit of safety documents issued by the company as my action guide. Always put safety work in the first place ideologically, strictly abide by the relevant laws and regulations on safety production in action, perform the duties and obligations of safety personnel, and attend the safety production coordination meeting held regularly by the project department on time. In addition, in my spare time, I study related safety production materials through the Internet, collect all kinds of safety cases, and strive to improve my level and business. Resolutely obey the arrangement of the project manager and do all the work consciously. On major issues, adhere to principles, distinguish right from wrong, and better perform the duties of a safety officer.
Second, the work.
Under the condition of fully implementing the spirit and requirements of the superior documents, taking the opportunity of creating work and implementing special rectification as the way, the safety and civilized construction work has been obviously improved. Looking back on the work in the past year, we have mainly done the following work:
1. Strengthen organizational leadership and plan ahead.
At the beginning of the year, we should improve the responsibility system for safe production and implement the responsibility for safe production and civilized construction, with clear objectives and powerful measures, timely analyze the problems existing in safe production and civilized construction, communicate and coordinate, and strengthen management; On the other hand, all managers of the project department and the construction team have formed a top-down communication management system. In addition, the project manager and the group company attach great importance to the work of safety in production, so as to grasp it early, realistically and firmly.
2, increase the propaganda of production safety, enhance safety awareness.
In order to effectively enhance the awareness of safety production and civilized construction of all employees, special meetings such as "Safety Production Coordination Meeting" and "Safety and Civilized Construction Inspection" are held regularly according to the actual situation of our construction site, and slogans of safety production and rewards and punishments of civilized construction are actively promoted through slogans, banners and blackboard newspapers, and migrant workers are trained in safety production. Every worker who enters the construction site must go through three-level safety education, ensure that special operations personnel must hold relevant certificates, strive to improve the self-defense and self-help ability of workers, and constantly increase safety education, so as to further improve the safety awareness of personnel in our project department.
3. Carry out special inspections to eliminate quality and safety hazards.
Since the beginning of this year, while strengthening daily supervision and management, we have carried out special inspections on safety production and civilized construction every Sunday, held regular safety meetings every Monday morning, actively arranged for the personnel on duty to take measures to prevent high temperature in summer and fire in winter, earnestly carried out self-examination and self-correction, and immediately ruled out hidden dangers when found. We have strengthened the follow-up inspection of the implementation of the rectification of various construction teams, and strived to nip the hidden dangers of accidents in the bud.
4. Strengthen the management of workers' dormitory and improve the environment of workers' dormitory.
Because the management of workers' dormitories is difficult and the security risks are great, our project department has made great efforts in dormitory management. The sanitary environment of workers' dormitories is poor, wires are pulled and connected indiscriminately, and illegal appliances such as rice cookers and electric stoves are used privately. In order to overcome the above problems, the project department organized many inspections to strengthen the management of workers' dormitories, requiring all construction teams to assign special personnel to clean the public areas of living quarters every day, adopt dynamic management methods for the hygiene of workers' dormitories, conduct sanitary inspections of dormitories from time to time, and assign specific responsibilities to each team. After many inspections and renovations, the dormitory situation has been greatly improved. We will continue to strengthen the management of workers' dormitories, persistently manage workers' dormitories and create a good living environment for workers.
Third, the shortcomings in the work and the direction of future efforts.
In the past 20 years, although I have worked conscientiously, earnestly performed my duties within the scope of division of labor, and successfully completed various tasks assigned by the leaders, there are also the following shortcomings, mainly including:
1. Problems in safety production and civilized construction: some safety data are incomplete; The materials on the construction site are piled up in disorder; The electricity consumption at the construction site is chaotic; The supervision requirements for the construction site are not strict and the standards are not high. They just want to get by, but they can't work too hard, thus laying a safety hazard;
2, in the usual work, the enthusiasm for learning professional knowledge is not enough, and the relevant drawings, documents, construction measures and other contents are not thoroughly grasped and understood;
3, the work is not detailed enough, and mistakes often appear on small problems.
The year 20_ is coming to an end. Although some work has been done in safety production and civilized construction management this year, some achievements have been made and some experience has been accumulated, but there are still many problems. With the arrival of 20 1 1, I will definitely strengthen targeted measures, open up working ideas, innovate management models, sum up experience, find out deficiencies, and focus on implementation and future work.
Summary of building safety personnel model work Part III:
Time flies, from spring to summer, from harvest autumn to snowy winter, a busy year has passed. At the end of the year, looking back on the work of the past year, there are many things that need to be carefully summarized.
From the beginning of the year to May 23rd, I worked in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ At the same time, one year's experience has made me realize the shortcomings in my work, and I need to strengthen my study and improvement to lay the foundation for safe and civilized construction next year.
1, this is my second year of safety work. Although I know some professional knowledge, my work experience is not very rich, and there will always be some problems in my work. In order to be familiar with all kinds of business in a short time, I constantly learn safety knowledge through various channels to enrich myself, and gradually become a qualified safety officer through the work of "safety standardization". In many cases, we can take root in the production line and widely absorb the experience of all parties. At work, I am more involved in the production line, because it can give me enough growth nutrients. Only by truly taking root in the production line can we have a deeper understanding of occupational health, safety and environmental protection and promote my better work; Communicate with workers in the front line of production, and extensively absorb experiences from all sides, so as to find problems in time, expand their working ideas, and truly realize the coordinated development of occupational health and safety and the environment.
2, correctly handle interpersonal relationships. In daily work, there are many exchanges with superiors, colleagues and construction personnel, so problems of one kind or another may occur in the course of daily work, and friction is inevitable. This requires me to straighten my mind and actively avoid such problems. Young people are easy to be impetuous at work, and they are likely to be thoughtless when dealing with problems, and they will do irrational things on impulse, which I try to avoid at work. Correctly handle the relationship with other colleagues, and actively and optimistically help colleagues in trouble.
3. With "being a qualified safety officer" as the working motivation, it can assist leaders to conscientiously implement the responsibility system for safety production, strengthen the publicity and communication of relevant laws and regulations on safety production, and firmly fulfill the commitment of the responsibility book for safety objectives. In management, we are loyal to our duties, strict in safety awareness and professional ethics. Through pre-shift activities and regular safety meetings, we analyze the signs of weak safety awareness, lack of experience, fear of trouble and lazy thoughts, and nip them in the bud. Learn safety skills and knowledge together with project department employees, study and analyze accident cases, summarize accident lessons, and continuously improve business level.
4. Under the correct leadership of the leadership, carefully supervise the safety function of equipment and personnel on the construction site. In the planning, arrangement, inspection, summary and assessment of safety production, we should put an end to habitual violations, resolutely pay close attention to unlicensed operation, and resolutely punish other safety violations, so that they can master the major hidden dangers and weak links that threaten safety production.
5, through the daily safety patrol in a timely manner to understand the situation of production safety. Go to the construction site every day to check the safety in production and make records, and rectify the hidden dangers found in daily inspections in time. According to the requirements of the project manager, employees are absolutely not allowed to go to the construction with hidden dangers, and grab the progress on the premise of ensuring safety and quality. At the same time, in the construction, the inspection shall be carried out in strict accordance with the special construction plan and various safety technical disclosure, and the violations of discipline and discipline shall be corrected and punished in time.
6. Carry out three-level education for new employees, improve employees' safety awareness, conduct full-time training for special types of work, conduct on-site emergency drills for employees, ensure safety in production, and do a good job in safety education for outsourcing team members. The outsourcing team is an indispensable force in the construction process of the project department, and its operators generally have many problems such as low academic qualifications, weak safety awareness and disobedience to management. Therefore, it is the focus of supervision to do a good job in the three-level safety education of outsourcing personnel. At work, actively organize newcomers to carry out three-level safety education and training, effectively bring safety knowledge to every construction worker, and conscientiously complete the training course with a "people-oriented" attitude to prevent superficial phenomena; Monitor the payment process of migrant workers' wages to ensure the interests of every construction worker.
7, actively carry out hidden trouble investigation work, and earnestly accomplish security affairs know fairly well. Actively establish a hidden danger investigation and management system and seriously carry out hidden danger investigation and registration, effectively monitor and guide the governance process. Listen carefully and collect the reasonable safety suggestions and opinions of the team, and truly reflect the safety wishes of employees to their superiors. Provide labor protection articles for construction personnel for inspection; Check the living quarters irregularly, such as unauthorized connection, burning small pots, food hygiene in canteens, etc. Prevent electrical fire, electric shock and poisoning accidents.
8. Constantly learn to enrich yourself and complete further solid transformation. Safety is an eternal topic, and the ocean of safety knowledge is boundless. Recharge yourself after work. Be familiar with the relevant laws and regulations on production safety, relevant work safety operation procedures, and consult more relevant safety technical knowledge, so as to truly be a full-time safety manager with a new era, new concept and connotation.
Over the past year, due to the great attention paid to safety production and the joint efforts of leaders at all levels, departments, operation teams and teams of the project department, the safety production of the project department has achieved certain results, and no major safety accidents have occurred, which has contributed to the company's economic development and personnel stability. While affirming the achievements, I am also soberly aware that there are still some shortcomings in the management of production safety:
The first point is that a few responsible persons have a weak sense of safety in production, and their concept of safety in production is still relatively weak. They are lucky, and the safety officers will be transferred if they can't get it or get half of it; The second point is that the rectification of safety hazards of a few operation teams is not timely and in place, and it is a dynamic variable, and general minor accidents occasionally occur;
The third point is that many workers in the outsourcing team do not listen to dissuasion;
The fourth point is that the construction team often ignores the safety work when they are busy with their work. They always find it troublesome to implement the necessary rules and regulations, and the employees are somewhat resistant. Some people even wear necessary labor protection articles, which makes our rules and regulations exist in name only in some places and become slogans, sometimes just to cope with inspections; Fifth, the publicity and education of safety production needs to be carried out in a lasting and in-depth manner;
The existence of these problems requires us not to be blindly optimistic, to keep a clear head at all times, to further enhance our sense of hardship and responsibility, not to be careless in our work, and to do our utmost to strive for effective measures to improve the level of supervision and comprehensive management. On the basis of summing up achievements, we will continue to look for gaps, find weak points and clarify the direction of efforts. I will also learn professional knowledge, improve my safety management level, and ensure that I will do better in safety management next year.
There are three articles about the work summary of construction safety personnel:
★ Four summaries of the annual work of building safety officers.
★ In 2020, there were 5 model articles summarizing the work of safety personnel in construction sites.
★ Four model essays on personal work summary of building safety personnel in 2020.
★ Annual work summary, building safety officer, 5 articles.
★ Five selected articles on annual work summary, one building safety officer.
★ Summary of Personal Annual Work of Fan Wen, Building Safety Officer
Taken the construction site safety officer year-end personal work summary excellent model essay.
★ 3 short articles summarizing personal safety during construction.
★ Three selected models for personal work summary of security personnel in 2020.
★ Model essay on personal work summary of safety personnel on the construction site