Current location - Quotes Website - Collection of slogans - Flood control inspection notice
Flood control inspection notice
Model essay on flood control inspection notice (5 general articles)

With the step-by-step development of society, more and more places need to use notices, and the arrangements, requirements and opinions of higher-level units for a certain work of lower-level units are often conveyed in the form of notices. Then the question is coming, how should I write an appropriate notice? The following is a model essay (5 general essays) on flood control inspection notice carefully compiled by me, for reference only, and you are welcome to read it.

1 Notice of flood control inspection of property service enterprises:

In order to do a good job in flood control in 20xx, relevant issues are hereby notified as follows:

First, establish flood control organizations.

Each project should establish a set of flood control organizations with clear personnel, detailed division of labor and clear responsibilities, so as to ensure that the flood control work organization is in place.

1. The project leader is the first person responsible for flood control. Fully responsible for the on-site command and coordination of flood control work and emergency response. If the information of the person in charge of the project in the project filing information changes, it shall be changed in time.

2. Identify an information officer. In case of all kinds of dangers and emergencies, the information officer should report to the flood control headquarters, the Housing Construction Committee and the Housing Authority of the project territory within 30 minutes, and report the progress information in time. Announce a 24-hour emergency call.

3. Announce the telephone number on duty for flood control, ensure smooth communication, and arrange personnel to be responsible for it 24 hours a day.

Second, prepare flood control materials and establish a ledger.

1. Improve and supplement flood control materials, personnel and equipment. Improve and supplement the flood control material reserve, maintain and maintain emergency machinery and equipment, establish a material ledger, clarify the type, quantity, storage location and management responsible person of materials, and ensure that flood control materials are complete and effective.

2, the establishment of hidden trouble investigation ledger. Combined with the disaster situation and management practice over the years, the hidden dangers are investigated, so as to achieve comprehensive coverage and leave no dead ends, especially the hidden dangers such as lightning protection failure, roof leakage, blockage of drainage outlets and drainage pipes, failure of flood control measures in garages or underground spaces, and foundation collapse; For all kinds of hidden dangers found out, it is necessary to establish a ledger and register them by classification, so that the situation is clear and the time limit for hidden dangers management is clear. In principle, all treatments should be completed before the flood season.

Third, organize drills.

All property projects should formulate operational and feasible emergency plans according to the project situation, and everyone involved in flood control work should master them skillfully. Before the flood season, an emergency drill should be conducted to further strengthen the operation skills of the emergency team, check whether the emergency plan is operable in advance, check whether the materials are fully equipped and placed in a reasonable position, and improve the contents of the emergency plan according to the drill.

xxx

20xx June 3rd

2 notice of flood control inspection of project supervision department (group) of the company:

Recently, Xi 'an experienced continuous heavy rainfall. In order to do a good job in construction site safety, please urge the construction unit to take effective measures to prevent all kinds of quality and safety accidents in strict accordance with the requirements of relevant laws and regulations and mandatory standards and norms for engineering construction. The relevant matters are hereby notified as follows:

1, it is necessary to strengthen the monitoring of deep foundation pit support, set observation points, observe the changes of slope and adjacent buildings and structures at any time, find hidden dangers in time, and take effective measures to nip in the bud.

2, do a good job in the fixed state of tower crane and other large mechanical equipment and the sensitivity of various safety devices, and improve the wind, rain, lightning protection and collapse prevention performance of the equipment. The mechanical equipment with major accident hidden danger should be stopped immediately, rectified within a time limit, and it is strictly forbidden to run in spite of illness. If the rectification fails to meet the standard requirements, it will be resolutely stopped.

3, the construction of temporary electricity must conform to the requirements of the standard specification. Strengthen the safety management of on-site substation (distribution room) to ensure the safety of electricity consumption.

4, scaffolding safety precautions focus on checking the implementation of the vertical pole foundation and drainage measures and Rachel, so that the foundation is smooth and solid, drainage is smooth, Rachel is effective, and the scaffold is solid and reliable.

5, the dormitory, kitchen, office, warehouse and other temporary facilities on the construction site to conduct a comprehensive safety inspection, the existing unsafe hidden dangers, to take immediate measures, the maintenance of the maintenance, the reinforcement of the reinforcement, to ensure personal safety, to resolutely dismantle, to prevent the occurrence of collapse accidents.

6, do a good job in the supervision of production safety management on the construction site. Organize weekly and monthly safety inspections and special meetings; Review the safety technical schemes and measures of various sub-projects in the construction process in strict accordance with the requirements; If potential safety hazards are found, timely urge the rectification, issue a notice of potential safety hazards if the rectification is not in place, and report to the superior when necessary.

I hereby inform you, please follow it carefully!

xxx

July 1st, two thousand xx.

3. Notice of flood control inspection of highway maintenance teams:

At present, our county is about to enter the flood season. In order to conscientiously implement the spirit of Notice No.4 [20xx] of Yi Lu Yang Zi and do a good job in highway maintenance and highway flood control in rainy season in 20xx, relevant matters are hereby notified as follows:

First, raise awareness, make preparations for highway flood control, and pay close attention to the analysis and forecast of meteorological and hydrological departments in time;

Second, the highway maintenance team should attach great importance to highway maintenance and highway flood control in rainy season, actively take effective measures and pay close attention to implementation. The bureau has set up a leading group for highway maintenance and flood control in rainy season (the list of members is attached), and the office of the leading group for flood control is located in the bureau maintenance company;

Three, to further implement the responsibility system for highway maintenance and highway flood control in rainy season. Highway maintenance and the responsibility system for flood control and flood fighting in rainy season should be implemented in warehouses, highway maintenance teams or individuals. Gansu-Dalian line, Wanhuang line, Fengdai line, Sitang line and other tourist routes, county exits and other trunk lines and highways with great social impact should be strictly disciplined in flood control and flood fighting. If the responsibility is not in place and the work delay causes serious consequences, the relevant personnel should be held accountable;

Fourth, strengthen the prevention and emergency repair of highway water damage, organize personnel to inspect the road sections prone to water damage and accidents over the years, and deal with hidden dangers in time, especially take effective preventive measures for dangerous bridges and culverts and soft collapsed road sections, strengthen and repair, pay close attention to highway maintenance and material preparation, repair road pits and grooves in time, and remove sundries on bridge and culvert structures. Adhere to patrol roads in rainy days, and immediately organize personnel to carry out emergency repairs in case of water damage to roads, so as to ensure that flooded sections are flooded with water.

Five, strengthen the maintenance management of the construction section, the construction section should be clear about the maintenance responsibility, according to the principle of traffic while construction, the implementation of full-time maintenance personnel and traffic guidance personnel, to ensure the normal traffic of the construction section.

Six, relying on governments at all levels to do a good job of highway flood repair. In case of water damage, report to the local government in time for support and help. At the same time, in flood fighting and emergency rescue, we should obey the unified command and dispatch of the local flood control headquarters, organize manpower and material resources, actively participate in flood fighting and emergency rescue, ensure the smooth flow of flood fighting, disaster relief and epidemic prevention materials and personnel, and give priority to release.

Seven, the establishment of day and night duty and reporting system in flood season. In order to fully grasp and understand the flood situation, emergency repair caused by water damage and meteorological conditions in time, all highway maintenance teams report the road conditions in flood season under their jurisdiction once every ten days (4th, 1 4th and 24th), and report serious water damage, emergency repair and traffic jam in time within1hour, and all highway maintenance teams are on duty day and night during flood season. Comrade Song Lei contacted the sub-bureau to dispatch flood control and emergency rescue work due to water damage. Each road maintenance team shall designate a special person to be on duty for flood control and water damage, and report the duty location, telephone number and contact person to the sub-bureau for timely contact.

Eight, the highway maintenance team after receiving this notice, should set up a team site flood emergency support team, unified deployment, responsibility in place. Do a good job in highway maintenance and flood control in rainy season.

Nine, the branch will organize a special inspection and appraisal of highway maintenance work in the rainy season this year, and incorporate the results into the year-end assessment.

xxx

Two Oxx may 7th.

Dear residents and friends,

According to the latest news released by Ningxia Meteorological Observatory and the latest meteorological data analysis, it is predicted that there will be a rainstorm in Ningxia from this evening to this evening. It is estimated that from the night of 23rd to the night of 24th, there will be heavy rain to rainstorm along Shizuishan, northern Wuzhong and Helan Mountain in Yinchuan, with the cumulative rainfall of 50-80mm, and some towns and villages can reach more than 80mm. There will be moderate rain (10-25mm) in other areas, and there will be heavy rain (25-38mm) in the southwest of Guyuan City, which may cause flash floods, urban waterlogging and geological disasters.

Please remain vigilant and pay attention to the following safety matters to prevent problems before they happen:

1. Please don't charge outdoors and in the garage today and tomorrow, so as not to cause electricity accidents.

Second, try not to park the vehicle in the underground garage to avoid damage.

Third, don't drive in the water, and don't restart the vehicle after it is turned off in the water.

Fourth, personnel should pay attention to safety and take good care of the elderly and children at home.

Five, to ensure that property is not damaged, and take preventive measures.

6. Residents who live in bungalows and have underground garages should take waterproof measures in front of the door, and it is best to bring their own sandbags to prevent rainwater from pouring into the house.

Reminder: In case of danger, residents and friends should not panic and take relevant first aid and self-help measures. At the same time, cooperate with the community and property companies to do emergency work.

xxx

Date:

Notice of flood control inspection of urban residential quarters, property service enterprises and owners' committees:

According to the requirements of the flood control work of the municipal party committee and the municipal government, all property service enterprises should make preparations for flood control and disaster prevention, regard the flood control work in the property management area as an important task at present, and take various effective measures to maintain the normal living environment of the majority of owners. In order to ensure the safety of urban residential areas in flood season, relevant matters are hereby notified as follows:

First, strengthen duty on duty and stick to post responsibilities.

The realty service enterprises should strictly follow the stipulations of the realty service contract, further strengthen the duty system in flood season, clarify the job responsibilities of each post, assign personnel, set time, set posts and assign responsibilities, stick to their posts, ensure smooth telephone communication on duty, properly handle emergencies and report to relevant departments in time. We must resolutely put an end to the phenomenon of empty posts, sleeping in posts and leaving posts, and constantly improve the sense of responsibility and service of the personnel on duty.

Two, strengthen outdoor inspections and maintenance, and earnestly fulfill their responsibilities.

The realty service enterprises should strictly follow the stipulations of the realty service contract, strengthen the inspection and inspection of the parts and facilities used in residential areas, focus on the inspection of basement passages, equipment rooms, rainwater pipes (wells), drainage wells and other parts, take effective measures in time to solve the problems found, and dredge and clean up the accumulated water in the main roads of residential areas in time. At the same time, it is necessary to make all preparations for flood control and implement "organization, planning, personnel, materials and measures" to ensure the safe and orderly development of flood control in flood season.

Third, strengthen the inspection of safety precautions and weak links to ensure safe operation.

The realty service enterprise shall conduct a comprehensive inspection on the safety prevention facilities, equipment and measures of residential quarters, including fire fighting equipment, lightning protection facilities, alarm devices, monitoring equipment and electrically controlled security doors. , should be kept in a normal state. Conduct safety inspection on the attachments and appendages of the house (such as outdoor air conditioner, sunshade, clothes hanger, TV satellite antenna, outdoor advertisement), notify the owner in time and make rectification when finding hidden dangers. To strengthen the protection, reinforcement and pruning of tall trees, to prevent heavy rain and dumping accidents in flood season.

Fourth, strengthen education and mobilize widely.

All property service enterprises should educate all employees on flood control, earnestly convey the spirit of flood control work at higher levels, preach the flood control regulations, measures and requirements of property enterprises, and let employees tighten the string of flood control work. At the same time, it is necessary to publicize the importance of flood control to the owners through scrolling screens, wall newspapers, blackboard newspapers, meetings, posting notices, etc., so that everyone knows it.

Hereby inform!

xxx

July 1st, two thousand xx.

;