The first step is to log in to the marketing acquisition system and open the terminal scheme formulation, as shown in the figure below.
After opening the terminal scheme, as shown in the figure below, click and select the existing acquisition point.
Click Query on the user's collection point, enter the terminal address 2 1 173865 in the terminal address of the dialog box, and click Query to pop up all the meters in the concentrator and the corresponding measuring point serial numbers, as shown in the figure below.
Find the measuring point number of the corresponding electric meter, and then click on the lower right corner to remove it, so that the electric meter is removed from the concentrator, and the electric meter becomes an uncovered measuring point, and then added to the correct concentrator. After dismantling the meter, click on the lower right corner to send it.
A dialog box will pop up, and click OK to continue sending.
Find the process you just left, and each process has a corresponding application number. Remember the application number, so you won't make mistakes in other processes. The first one in the picture above is the process we are taking, and then double-click.
Click Print in the lower right corner of the new page, and the above picture will appear after clicking Print. Select the third checkbox, click OK, and then close it.
After closing the print dialog box, click the debug notification in the lower right corner to pop up the dialog box as shown in the above figure, click the terminal debugging in the lower right corner of the dialog box, and finally click Send in the lower right corner.
Finally, find the corresponding process application number, and double-click Archive to open a new page with an archive in the lower right corner. Click Archive, and the process ends. Then another instrument flow that needs to be disassembled can be disassembled step by step according to the above steps. This is for removing one meter from one concentrator at a time. If a concentrator dismantles multiple tables at a time, or needs to dismantle several concentrators at a time, it may be a bit slow to dismantle a concentrator, so how to go through multiple processes at the same time? Today, we will introduce this problem. Next, we will transfer the two meters in the figure 1 table to two different concentrators and demonstrate how to complete these processes at the same time.
First, open the terminal scheme, find the user's collection point query, enter the address of the concentrator to be adjusted, and click Query, and the above-mentioned dialog box for removing the electric meter will appear. This time, instead of removing the measuring point meter, click Add in the dialog box, as shown in the figure below.
In the place where the asset number is on the way, enter the asset number of the meter we want to add, click Query, and the corresponding meter information, user name and user address will be displayed. Then, check in the check box in front of the information, click the position displayed by the mouse above, and the meter will be added to the concentrator, and the dialog box will be closed, as shown in the figure below.
The hidden table in the figure is a new table, and the corresponding acquisition port is 1. At this time, it is necessary to change this port to a number other than 1, but it cannot be repeated with the collection port number of the electric meter in the concentrator in the future, because the serial number of this electric meter in the concentrator corresponding to this collection port number should be changed as much as possible. The modified place is the place where there is a red star directly below the above picture, and click the lower right corner to save it. Don't click Send at this time, continue to click and select the existing acquisition point in the above figure, then enter another concentrator address that needs to be adjusted, click Query, then add an electric meter and modify the corresponding acquisition port number.
As shown in the above figure, this is the case where two concentrator processes are running simultaneously. If you do this once, you can go through the same process. Click Send, and the remaining steps are the same as above, except for the terminal debugging. If there are multiple processes at the same time, the terminal will be slow to debug.
However, the overall time is still shorter than one process after another. Click the synchronization result of the master station in the above figure to view the synchronization of all processes.
Wait for all synchronizations to succeed, click Send, and then click File. In this way, the process of these two concentrators is completed, and the remaining task is to open the acquisition system to download parameters and tasks. If you have any questions about meter reading, you can leave a message, and Bian Xiao will reply to you in time.