About the coal mine drilling rig team
The drilling rig team belongs to the first team, 1. Upon arrival, Party A will not provide living materials assistance to the drilling team; 2. The rig needs mud when drilling, and the mud is dirty; 3. It's sunny outside, and there is a saying in the rig team that "rubber shoes, raincoats and cotton-padded jackets are the three treasures of the driller". So working in the drilling team is still tiring, but the pay is ok.