In order to prevent unnecessary losses caused by power outage, ensure the normal business of all merchants and the normal work of staff in the building, this power outage plan is specially formulated.
Two. member
Team leader: customer service department of the project manager: inform and explain the equipment warranty and recovery to the merchants; Engineering inspection: post inspection in the internal security building.
Third, the principle:
All employees obey the unified scheduling and arrangement of the general manager.
Fourth, the implementation method
1, notify the power failure.
(1) After receiving the power outage notice from the power supply bureau, after the second verification, the notice will inform the merchants and the sales department as soon as possible, indicating the power outage reason, time and recovery time.
(2) The project department should protect the facilities and equipment in the building before the power failure, such as stopping the elevator in advance before the power failure.
(3) Before the power failure, check whether the power supply equipment in the transformer room is running normally, and ensure that it can be put into normal operation after power supply is restored.
(4) Inform the merchants to resume power supply as soon as they get the power supply bureau or know that power supply will be resumed. Please check all the equipment, then resume the elevator operation and patrol the distribution room to see if the data is normal.
2. Emergency power failure
(1) After the power outage, get the power outage information from the power supply bureau as soon as possible, check whether there are trapped people in the elevator, and inform the merchants of the power outage reason and the approximate recovery time.
(2) Assign special personnel to patrol the power supply equipment to prevent unnecessary losses caused by sudden restoration of power supply.
(3) After the power supply is restored, notify the merchants in time after the second confirmation by the power supply bureau to check whether the equipment in the building is back to normal.
Emergency plan for power failure of property building 2 < 1 > Leading organization
Commander-in-Chief: day shift; Night shift: cadres on duty
First, the deputy director refers to the composition and responsibilities of emergency rescue.
Deputy commander:
Team members:
< 2 > responsibility
1, chief commander: responsible for organizing and directing the emergency rescue of the whole plant;
2. Deputy Commander-in-Chief: responsible for assisting the commander-in-chief in the specific command of emergency rescue;
3. Team members: work under the unified command of the headquarters. The responsibilities of each section chief in accident emergency rescue are:
1. Steelmaking foreman: responsible for the on-site command of the steelmaking section;
3. Continuous casting foreman: responsible for the on-site command of continuous casting section;
4. Mechanic foreman: assist the general commander in charge of the on-site command of emergency repair work;
5. Electrical maintenance foreman: assist the general commander in charge of the on-site command of emergency repair work;
6. Peripheral foreman: assist the general commander in charge of the on-site command of emergency repair work;
7. Engineer: responsible for the technical guidance of the emergency repair site;
Second, the emergency communication:
When dealing with accidents, all personnel involved in emergency rescue and emergency repair should keep communication open. If the signal is unstable or interrupted, they should immediately use the fixed telephone or mobile phone in the factory to get in touch with the chief commander in time and clearly state their position.
Third, the accident treatment plan:
1. When there is a power failure accident, the water pump owner controller should not panic, but should be calm. The south security water tower can supply water for about 15 minutes. In the meantime, the main controller can completely restart the water pump after sending electricity.
2. Under normal circumstances, the diesel engine can start automatically after the power failure in the North District. The owner controller of the water pump only needs to press the button combining the clutch on the operation panel of the control box, and then press and hold the speed-up button until the speed displayed on the speedometer no longer rises;
3. If the diesel engine can't start automatically, press the reset button first. If it still doesn't work, turn the transfer switch to the manual position. At this point, the diesel engine can be started as long as the finger presses the start button.
4. After the diesel pump is successfully started, the main control room of the water pump room shall immediately report the situation to the shift supervisor and notify the converter main control room and the continuous casting main control room.
5. After receiving the alarm call from the water pump room, the converter master control room should immediately stop smelting with guns, and immediately notify the shift supervisor of the situation, who will report to the superior.
6. After receiving the alarm call from the water pump room, the continuous casting master control room should pay close attention to the quantity of secondary cooling water and try to finish the molten steel in the ladle as much as possible.
7. After the diesel engine is started, the chief engineer of the water pump room can appropriately adjust the manual valve at the entrance to increase or decrease the water pressure, so as to achieve the safe water use required by the equipment.
Four. Preventive measures and assessment
1, the chief engineer of the water pump room should closely monitor the water level of the safety water tower in his usual work, and report to the shift supervisor immediately if there is any abnormality, so as to timely handle and eliminate hidden dangers;
2, safety water tower outlet pipe manual valve should be observed at any time, in case someone misoperation;
3, each shift personnel to patrol the diesel engine operation box panel switch, indicator light. For example, the selector switch should be in the automatic position; Turn on the power key switch; Whether the float indicator light is on, whether the alarm light is on, and reset it in time.
Emergency plan for power failure of Building No.3 of the property I. Power failure
(a) the logistics management office received a notice from the relevant departments about power failure and water cut, asking about the time of power failure and water cut;
(two) the logistics management office shall promptly notify the person in charge of each canteen and booth;
(3) The Logistics Management Office shall report to the leaders in a timely manner.
Second, power generation.
The logistics electrician immediately uses the generator to generate electricity to ensure the normal use of electricity in the canteen.
Third, post a warm reminder to inform teachers and students to stop water and electricity, and remind teachers and students to bring change to eat.
Fourth, canteen food processing.
If there is a plan to cut off power and water:
(a) electricity and water for breakfast:
(1) The night before yesterday, water was prepared in a container to make steamed buns, and the next morning, it was steamed with a diesel stove.
(2) Provide fried powder, fried rice, cooked noodles and porridge as much as possible;
(3) Provide eggs and milk.
(2) Power failure during lunch and dinner:
(1) Rice: Cook the rice in advance;
(2) Dishes: arrange cooking according to the power generation time of the generator; Stir-fry with a coal-fired stove or a briquette stove.
In case of sudden power failure:
(a) breakfast power failure:
(1) Hand-wrapped buns and cooked in a diesel stove;
(2) Provide fried powder, fried rice, cooked noodles and porridge as much as possible;
(3) Provide eggs and milk.
(2) Power failure during lunch and dinner:
(1) rice: arrange steamed rice in time after the generator generates electricity;
(2) Dishes: After the generator generates electricity, arrange cooking in time or use coal steam furnace or briquette furnace for cooking.
5. Food sales.
Teachers and students can buy meals in cash.
Emergency plan for power failure of Building 4 of the Property 1. In case of power outage notice, the management and operation department shall inform the residents and merchants of the power outage line, area, time, elevator use and safety precautions in advance, and issue power outage notices at the main entrances and exits; At the same time, the engineering materials department should do the emergency work before the power failure.
2. In case of sudden power failure without receiving any notice, the Engineering Materials Department shall immediately confirm whether it is an internal fault power failure or an external power failure. If it is an internal fault power failure, immediately send someone to find the reason and take measures to prevent the fault from expanding; If it is an external power outage, on the one hand, it is necessary to prevent accidents caused by sudden calls, on the other hand, it is necessary to call the Power Bureau to inquire about the power outage, know when to restore power supply, and inform the management and operation department of the information.
3, the security department immediately in conjunction with the project ministry of materials and equipment sent people to the floors to check the operation of the elevator, found that the elevator shut people immediately according to the emergency plan to rescue the elevator trapped people.
4. The management and operation department will immediately notify the residents and merchants of the power outage, and issue power outage notices at the main entrances and exits. When necessary, the emergency broadcast system will be activated to inform residents and ask them to remain calm and take preventive measures.
5. In case of sudden power failure, when the mall is open at night, the security department should assist the mall to maintain good order, guide the merchants to use emergency lighting, candles and other backup lighting to evacuate customers, and pay attention to fire prevention to prevent fire.
6. Arrange employees to the main entrance and exit of the community and the elevator hall to maintain order. Security guards should strengthen security measures to prevent people from creating chaos, fish in troubled waters, and close the door when necessary.
7. Send people to guard the office and duty room, patiently receive inquiries from residents and merchants, do a good job of explanation and guidance, and prevent conflicts with residents and merchants.
8. Record the time, causes, countermeasures and losses caused by the power failure accident in detail.
9. Preventive measures for sudden power failure:
1) ministry of materials and equipment shall regularly check the emergency lighting and emergency broadcasting system to ensure normal operation.
2) The management and operation department should remind office residents and merchants to prepare some emergency lights or candles to prevent power failure.
3) In addition to flashlights, the security department and the engineering materials department should also be equipped with portable emergency lighting for patrol and maintenance, which should be charged and maintained frequently and kept in good condition.
Emergency plan for power failure of property building 5 ① In case of power failure in the building, elevator maintenance personnel should bring emergency lighting equipment to the central control room at the first time to check the elevator position.
(2) When the elevator maintenance personnel arrive at the elevator floor, they must first determine the exact location of the elevator and judge whether they can release people.
(3) When the elevator is more than 80 cm above the ground, people are not allowed to be released, and they can only be released after turning to the flat position (see Emergency Plan for Elevator Rescue for the operation method of turning to release people).
(4) When judging that the elevator position can't let people go, comfort the passengers: "Please wait patiently, you are safest in the car".
⑤ When the trapped people are released, they should guide the guests to leave the building by taking the fire escape.
⑥ Elevator maintenance personnel should go to the machine room to cut off the total power supply of all elevators to prevent the heavy current from impacting the electronic board after the elevator is restored.