Generally, the supervision unit shall be informed first, and the supervision unit shall require it to rectify or suspend the construction according to the seriousness of the case, or report to the owner in time. If the construction unit refuses to make rectification, the supervision unit shall report to the construction administrative department in time, preferably in writing.
The relevant penalties for the construction unit to cut corners are as follows:
1. If the construction unit cuts corners during the construction, uses unqualified building materials, building components and equipment, or has other behaviors that are not in accordance with the engineering design drawings or construction technical standards, it shall be ordered to make corrections, and a fine of more than 2% and less than 4% of the project contract price shall be imposed;
2, resulting in the quality of construction projects do not meet the prescribed quality standards, responsible for rework, repair, and compensation for the losses caused; If the circumstances are serious, it shall be ordered to suspend business for rectification, lower its qualification level or revoke its qualification certificate;
3. If the construction unit fails to inspect the building materials, building components, equipment and commercial concrete, or fails to sample the test blocks, test pieces and related materials related to structural safety, it shall be ordered to make corrections and be fined between 654.38 million yuan and 200,000 yuan.