Rural cement road construction contract sample _ rural cement road construction contract template
Cement road is a concrete road made of cement and sand. So what should we pay attention to when signing the rural cement road construction contract? The following is the rural cement road construction contract I compiled. Welcome to reading.

Demonstration of rural cement road construction contract Article 1 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

Through negotiation between Party A and Party B, Party B is willing to undertake the construction of Party A's project. This contract is signed on the basis of equal consultation between Party A and Party B, and both parties shall abide by it.

I. Project and Unit Price

1. Subgrade renovation: m, RMB/m.

2. Concrete pavement: meter, RMB/meter.

3. Concrete trench with cover plate: m, yuan/m. ..

Second, the construction period

The project is required to be started and completed.

Third, the project quality

1, material requirements

Cement adopts 32.5# qualified cement products produced by Tianwangtai or Jidong; The crushed stone produced by the crusher is clean, hard, tough, durable and uniform below 4cm, which meets the second-class crushed stone standard and has no wind fossil particles; Sand adopts medium-coarse sand; The water used for mixing cement concrete is usually drinkable.

2, quality standards

The engineering quality of this project is an excellent engineering standard, and Party B shall carry out the construction according to the requirements of construction technical specifications. Both parties should conscientiously implement the national quality standards with a high sense of responsibility, regard the quality of the project as their life, take a century-long plan and quality first as the slogan. Party B must carry out the construction according to the requirements of Technical Specification 22 22. If Party A finds that Party B's construction is irregular, cuts corners and does not meet the engineering quality standards, it requires Party B to rework immediately, and the losses caused by rework shall be borne by Party B. ..

Fourth, the construction cost.

The general contracting cost of this project is RMB Yuan only, and the final cost shall be subject to the actual engineering quantity.

Verb (abbreviation of verb) payment terms

After Party B enters the site, Party A shall pay Party B 65,438+00% of the material fee in advance, 20% when the project is officially started, and the rest shall be paid according to the progress during the construction and paid at the end of the project.

Six, safety in production

Party A shall provide the construction signs of the starting point and the ending point. Party B shall carry out safety construction in accordance with relevant safety construction laws and regulations and safety system. In case of violation of discipline, Party A has the right to educate Party B, fine or terminate the contract according to the seriousness of the case.

In the process of construction, Party B must strictly manage and construct safely. In case of major or minor accident, Party B shall be responsible for it, and Party A shall not bear any responsibility.

Seven. Responsibility of both parties

1, Party A's responsibility

Party A conducts overall management of the project, and is mainly responsible for the control, supervision and acceptance of the project quality and progress.

B. Party A is responsible for providing Party B with construction water, electricity, site and accommodation. C. Party A is responsible for coordinating various external relations in the process of project construction to ensure the smooth progress of the project.

2. Party B's responsibilities

Party B must obey the management of Party A and actively cooperate with Party A to complete the construction task.

Party B must carry out the construction in strict accordance with the relevant requirements of the construction specifications.

This contract is made in triplicate, with Party A holding two copies and Party B holding one copy. It shall come into effect as of the date when both parties sign and seal it, and shall automatically become invalid after all formalities are completed. Matters not covered herein shall be supplemented by both parties through negotiation.

Party A (signature):

Party B (signature):

date month year

Model rural cement road construction contract Article 2 Employer: (hereinafter referred to as Party A), representative and team leader.

Contractor: (hereinafter referred to as Party B).

In order to do a good job in the project of "one thing, one discussion", with the consent of the villagers' congress, the village Committee reported to the higher government for approval, and carried out the cement pavement hardening project in Yanfang Village. In order to ensure the main pavement to complete the task on time and in quantity, Party A and Party B have reached the following agreement through negotiation:

A, contracted projects and main quantities:

This road project: the total length is 680m. Pavement structure: the base layer is the stabilized layer of original subgrade soil, the surface layer is paved with sand and gravel, and the surface layer is 0. 17m thick concrete. The pavement width is 3.5m (including the shoulder). Party B shall be responsible for laying boards and casting templates on both sides of the road surface to ensure that the road surface is natural and smooth without polishing. The quantity of works shall not be less than the quantity stipulated in the contract, and the extra expenses shall be calculated according to the new quantity of works.

1. subgrade retaining wall project: retaining wall with full length and width of 0.7m ... jointing with cement slurry and leaving a certain number of drainage holes for drainage and decompression.

2. A parking lot: length 16m, width 13m, surface with 0.05m gravel cushion and top with 0. 18m thick concrete.

2. Contract cost: 65,438+064,000 yuan, in words: one hundred and sixty-four thousand yuan only.

Third, the construction requirements:

1. This project is invested and constructed by Party A, and the cement is provided by the state free of charge. Party B will carry out the construction according to Party A's planning and design requirements.

2. During the construction, Party B shall be responsible for cleaning and lowering the subgrade with insufficient subgrade width, and Party B shall provide Party B with the necessary sand (including freight), manpower and machinery at its own expense.

3. During the construction process, Party A's newly-increased quantities shall be calculated and paid according to the requirements of this contract.

Four. Payment method:

In the early stage, Party A paid 20,000 yuan as start-up capital, and after Party B completed the roadbed sand laying project, Party A paid 20,000 yuan to Party B; When the cement pavement is half completed, Party A shall pay Party B 20,000 yuan; After the cement pavement is completely completed, Party A shall pay 104000 to Party B.

5. During Party B's construction, all engineering projects shall not be subcontracted. In case of subcontracting, Party A has the right to terminate the contract, and Party B shall bear the economic losses.