Construction Commitment 1 My name is xx, and I volunteered to be a worker in the project (construction team). In order to cooperate with the standardized management of the project and maintain the normal construction order, I make the following commitments:
I signed a labor contract with (the construction team) and had a labor relationship with me. Under his leadership, I carried out all the work. Obey management and perform duties according to the letter of commitment.
1. Obey and implement the system management of general contracting, subcontracting and construction team. I am willing to accept punishment if I violate it.
1) Implement the entry-exit registration and inspection system;
2) Work card use management system;
3) Register the safety education system;
4) Contract management system;
5) Industrial injury insurance system;
6) Quality, safe production and civilized construction management system;
7) dormitory management system and rules and regulations on health, electricity, fire prevention and public security;
8) Dining system in canteen;
9) Confirm your attendance record every month, so as to facilitate the supervision and management of the general contractor.
2. In the process of construction and life, we should unite and be friendly, do not fight, make trouble, or do anything that violates the law and discipline. When there are conflicts with workers and teams, report to leaders or organizations immediately to seek peaceful and just solutions.
3. When their legitimate rights and interests are infringed (such as labor disputes, industrial accident disputes, etc.). ), to negotiate with the labor contracting unit (construction team). Solve it through legal channels, or find the general contractor to coordinate and solve it. Never take excessive actions. No fighting, no damage to production and company property. If there are unreasonable illegal acts, they are willing to accept punishment and bear legal responsibility.
Commitment to workers (signature)
Date, year, month and day.
The above commitments shall be confirmed by the construction team, whose name is
Date: Year Month Day
Construction Commitment 2 Due to the need, our company needs to dig roads. In order to ensure the civilized construction and smooth traffic of urban road excavation, our company solemnly promises to strictly follow the requirements of relevant laws and regulations to reduce the negative impact on the city appearance and traffic during the construction period. Our unit promises to implement in accordance with the following regulations and requirements:
First, before construction, we must find out the underground pipelines in the construction area, contact the relevant pipeline units, and take effective measures to protect the underground pipeline network.
Two, in a prominent position on the construction site, hanging "urban road excavation permit". If it is really necessary to temporarily pile up materials due to operation needs, the temporary occupation permit formalities shall be handled at the same time, and the materials can be piled up only after permission. It is forbidden to directly mix cement on the road.
Three, in strict accordance with the approved time limit for a project, area and construction scheme for construction, rational allocation of human machinery, avoid construction in the peak period.
Four, in accordance with the relevant provisions of the civilized construction, the construction scope to WeiDang operation, construction materials, machines and tools shall not be beyond the scope.
Scope of construction.
Five, the construction site set up obvious traffic signs, marking, set up warning lights at night. Traffic diversion measures should be taken for engineering construction that has a great impact on vehicles and pedestrians, and special personnel should be assigned to assist the public security traffic management department to divert traffic to ensure road traffic and pedestrian safety.
Six, large machinery construction work should be completed before 10, and take effective measures to prevent construction noise and dust.
Seven, construction sludge, garbage, etc. Should be removed in time, the construction mud water should be discharged into the municipal sewage pipeline after precipitation treatment, and should not be directly discharged into the road.
Eight, in strict accordance with the road repair standards of Lucheng District Urban Management Law Enforcement Bureau, timely repair the excavated pavement. When excavating concrete pavement, the whole area needs to be repaired. When excavating the pavement of other materials, it should be repaired according to the actual excavation area. The implementation of road quality warranty system, the warranty period is one year. If there is any problem during the warranty period, it will be rectified as soon as possible, and the rectification situation will be taken as an important reference for the next license application.
Nine, any form of disputes and losses in the process of excavation, the construction unit shall bear and coordinate to solve. If there is any violation of the above contents, administrative punishment shall be imposed according to law in addition to prompt correction. Violation of the first and eighth items, depending on the situation to suspend the construction unit in the future excavation application.
Employer (seal): person in charge: contact person: year month day.
(This letter of commitment will be issued when receiving the application form and sent to the approval window when submitting the application form. )
The pace of urban construction has never stopped, and more and more high-rise buildings have sprung up, accompanied by noise, dust and environmental pollution. With the improvement of the quality of life, people pay more and more attention to environmental problems and have higher and higher requirements for the living environment. The concept of green construction came into being, and how to protect the environment and save resources in the process of engineering construction became the main task of green construction. The following are some practices and experiences in green construction of Beijing xxxxx project.
First, planning first.
A good plan is a good start for everything. Green construction planning should adapt to local conditions, closely combine the construction site and engineering characteristics, and implement energy saving, material saving and environmental protection in every corner of the construction site and every detail of the construction process. Avoid one step at a time, and put an end to covering up process defects by grabbing progress.
First of all, organize employees to carry out training and study on green construction management regulations, improve employees' awareness of green construction, and make employees fully grasp every regulation of green construction. Establish a green construction management system with the project manager as the leader, achieve clear goals, and form a good start for everyone to have something to do and everything to do.
Secondly, brainstorm, according to the actual situation of the construction site, with the principles of land saving, energy saving, water saving, material saving and environmental protection, carefully plan and prepare the green construction scheme, and use advanced technical measures and management to save resources to the maximum extent, improve resource utilization and reduce the adverse impact of construction on the environment.
Thirdly, establish the green construction project management system, establish and improve the green construction management data files, and carry out green construction inspections regularly, with clear inspection records. Hold regular meetings on green construction management to sum up experience and promote implementation. At the same time, green construction, civilized construction and safe construction must be deployed.
Second, funds are in place.
If green construction is regarded as a product, there will inevitably be manufacturing costs, and the investment of funds is also the guarantee condition for doing a good job in green construction, and earmarking funds can well ensure the orderly implementation of the green construction plan.
Green construction funds are led by the contract department, and other relevant departments are organized to calculate the amount of green construction funds according to the green construction plan, and form specific details, which will be distributed in place with the construction progress and green construction.
Third, the specific details of green construction.
This paper introduces the concrete contents of green construction of Beijing xxxxx project from aspects of energy saving, land saving, water saving, material saving and environmental protection.
Energy saving:
1, the office area and staff dormitory area are all illuminated by energy-saving lamps, and the power density of the office is not more than 8w/m2, and that of the dormitory is not more than 6w/m2, so that the lights are turned off when people walk. In the construction area, iodine tungsten lamp and dysprosium lamps with high energy consumption were replaced by metal halogen lamps of Shanghai Yaming brand. 1000 watt metal halogen lamp is equivalent to 3000 watt dysprosium lamp, and 1500 watt is equivalent to iodine tungsten lamp, which greatly saves energy. Moreover, the metal halogen lamp has a waterproof grade of IP6, which reduces daily maintenance. Although its cost is relatively high, its energy saving far exceeds its cost.
2. Formulate "Regulations on the Use of Office Air Conditioning", which requires that the refrigeration temperature of air conditioning should not be lower than 26℃ in summer; The heating temperature of air conditioning in winter is not higher than 22℃.
3, construction electricity metering management, strictly control the electricity consumption in the construction stage.
4. The temporary building adopts the composite wall of rock wool color steel plate, which has good thermal insulation performance, can well reduce the energy consumption during the heating period in winter, and can be reused to save materials.
5. The shower room adopts solar water heater to make full use of environmental protection natural energy and save electric energy consumption.
Save land:
1, according to the actual situation of the site, reasonably arrange each site land, and do not waste or idle it. Exposed land can be paved with stones or covered with sand bricks according to a specific pattern, and the stones and sand bricks can be reused after the project is completed.
2, according to the site soil, engineering structure, reduce earthwork excavation to a minimum.
Water saving:
1. All faucets and valves in the living quarters and the construction site shall adopt water-saving ball valves, and the toilet for management personnel shall adopt water-saving flushing switches, and water-saving signs shall be affixed in conspicuous positions. Designate special personnel to patrol regularly to avoid running water, and replace the faucet switch in time if it is damaged.
2, using the water level difference, the canteen, shower and other drainage pipes are directly connected to the toilet, and the toilet is washed with recycled water such as vegetable washing water to save water resources.
3, concrete curing water on the construction site, plastering curing water using small water, often wet, and the specialist is responsible for regular maintenance, avoid running water, regular education for workers to save water, in order to achieve the purpose of saving water.
Material saving:
1, take technical measures, optimize the construction scheme, choose green materials, actively promote new materials and new processes, promote the rational use of materials and save the actual consumption of building materials. "Step-by-step tightening" (a freely variable length F-type fixture) was introduced in the beam formwork construction of xx Hotel Project, which saved a lot of beam bottom 10* 10 cubic meter.
2, the construction site to establish a list of recyclable materials, formulate and implement the recycling management measures of recyclable waste, improve the utilization rate of waste.
3. Removable fences, mobile houses, reusable water supply pipes and fire fighting equipment are used on site.
Environmental protection:
1. Plan the construction site reasonably, minimize road hardening and avoid the negative impact of concrete on the land. Earthwork is piled up in a centralized way. Short-term storage is covered with dust-proof net, and long-term storage is covered with green plants. The exposed land on the site is covered with green plants first, and then covered with white sand bricks, dust screens and crushed stones as usual. The materials used can be reused, and the coverage rate reaches 100%.
2, the construction site is equipped with a car wash pool at the gate, vehicles must clean the dirt on the wheels before release. A sedimentation tank is set beside the car washing pool, and the water can be recycled after sedimentation. Use water-saving water gun. A concrete ground pump sedimentation tank is set on site, which is used for sprinkling water to reduce dust after water is settled.
3. Optimize the construction scheme during earthwork construction, reduce the amount of earthwork excavation and reduce the damage to the natural environment. Avoid working in windy weather. Sprinkle water in time during construction to avoid dust.
4, the construction site adopts closed garbage room, construction waste, domestic waste should be classified storage, muck, garbage by qualified manufacturers to deal with in time, and there are people who are responsible for the record, establish the corresponding account, on time.
5. It is forbidden to burn all kinds of wastes at the construction site to prevent air pollution.
6. The oil and chemical solvents stored in the construction site are equipped with special warehouses, and the ground has been treated for leakage prevention. An oil receiving hopper can be placed under the machinery polluted by oil, which can be made of wooden boards and filled with sand to prevent oil from infiltrating into the soil and polluting the environment.
7, canteen, sink, shower sewage pipe set iron grate, and connected to the municipal sewage pipe, ensure smooth drainage. The canteen is equipped with a grease trap, which is cleaned regularly.
8. The boundary noise of the construction site shall be detected and recorded at the construction site, and the noise emission shall not exceed the national standard. For noise machines such as chainsaws and ground pumps, wooden arch sheds and sound insulation sheds are built for sound insulation, and vehicles entering the site are prohibited from whistling to reduce man-made noise pollution. On-site outdoor welding should be hung with shading cloth to prevent light pollution.
9. Workers use electricity and water for heating in winter, and use safe and environmentally friendly energy to prevent air pollution.
Occupational health and safety:
1, the office area, living area and construction area of the construction site are set separately, separated by safety net, and keep a safe distance.
2. Temporary facilities such as offices, dormitories, canteens, toilets, showers, boiling water rooms, night school training rooms for migrant workers, closed garbage bins, and central heating equipment. Should be set in the construction site.
3. Prefabricated mobile homes used in the construction site should be supplied and installed by qualified manufacturers, and the required product certificates should be reported to the Ministry of Security for the record.
4. The construction site shall be set according to the CI requirements of China Construction Corporation, and it shall be fully enclosed and managed, with the baffle height of 2 m. ..
5. Set up a sign 1 1 at the gate of the construction site, with the contents of the corporate logo and corporate philosophy of the head office.
6. Set up a construction drawing board outside the gate, including the name of the project, the construction unit, design unit, construction unit, supervision unit, project manager's name, telephone number, start and completion date, construction permit approval number, etc.
7, the construction site entrances and exits, temporary electricity facilities, scaffolding, access points and other dangerous parts, set up obvious, in line with national standards of safety warning signs.
8. Provide construction personnel with safety helmets, safety belts and personal labor protection articles, such as safety shoes and work clothes that match their jobs.
9. During welding operations, workers are required to issue hot certificates, and operators are required to wear protective masks, goggles, gloves and other personal protective equipment.
10, the dormitory, canteen, bathroom and toilet have ventilation and lighting facilities; Daily necessities counters are set up in the dormitory, and daily necessities are neatly arranged; Indoor partition wall hanging dormitory management system, health responsibility system, health duty table; Daily maintenance is the responsibility of a special person.
1 1. The chef must have a health certificate and check it once a year. The canteen has a valid hygiene license issued by Daxing District Health Supervision Office, and all kinds of utensils are cleaned regularly and every day.
12. Toilets, sanitary facilities, drainage ditches and dark and humid areas should be disinfected regularly. The living quarters are closed.
Containers and garbage should be classified and stored, and flies should be killed regularly and removed in time.
13, the construction site should be set up the infirmary, equipped with medicine box, equipped with commonly used drugs and bandages, tourniquet.
Fourth, summarize and improve.
Through the green construction of xx project, we deeply feel that green is in my heart, and we must make unremitting efforts. Only the unexpected, nothing can't be done. Details determine success or failure. Green construction does not need to invest a lot of money. Pay more attention to details. Many materials can be recycled. In the future green construction, we will continue to work hard, further do a good job in green construction, and work together to contribute to "building a green construction site and ensuring the blue sky of the capital".
20xx years x months
Letter of Commitment for Construction Article 4 In order to ensure the smooth completion of the commercial and residential building project, our unit is willing to make the following commitments:
I. Quality assurance
1. Construction quality: In order to ensure the construction quality, the relevant provisions of construction quality specifications and standards (including mandatory standards) of construction projects shall be seriously implemented, and technical disclosure shall be made to the construction personnel before construction until each worker is familiar with the operation technology. During the construction, it is required to carry out the construction in strict accordance with the operation technology, and check the construction quality in strict accordance with the "three inspection systems" (self-inspection, handover inspection and professional inspection). Every process is not checked or does not meet the quality requirements.
2. Materials: All materials entering the construction site must have certificates and inspection reports, which need to be checked and confirmed by Party A and the supervisor. Unqualified and do not meet the design and specification requirements, shall not be used in engineering.
Second, the time limit for a project guarantee
1, organize reasonable measures:
(1) is uniformly scheduled and managed by the project management department. (2) Timely implement the mobilization, scheduling and management of materials, machinery and labor. Do a good job in process arrangement and prepare the working face in advance.
2, the implementation schedule management:
(1) Arrange weekly plan, issue team and individual quotas and complete engineering quantity indicators, and clarify responsibilities. (2) The team shall conduct self-inspection on the progress and quality every day, and put forward specific measures to complete the plan. Hold a weekly coordination meeting to coordinate the process and construction progress with other subcontractors and solve the factors that delay the construction period in time.
Three. Safety and civilized construction measures The construction team is the person directly responsible for safety and has a safety officer.
In addition to complying with the requirements of safety operation procedures, special attention should be paid to the following points:
(A) the construction of electricity safety
(2) Safety measures
1, implement the policy of "safety first, prevention first", and in the whole construction process, we must seriously abide by the construction safety work norms and safety management system, strive to do a good job in safe production and civilized construction, and put an end to the occurrence of vicious accidents.
2. Implement safety regulations.
3. Establish a construction accident insurance system and purchase construction accident insurance for construction personnel according to law. Sign labor contracts with construction workers according to law, pay workers' wages on time, and never default on the wages of migrant workers.
4. Consciously accept the supervision and inspection of users and their management departments on the quality and safety of construction projects, and promptly correct the problems raised in the inspection.
Four. Public security management measures In the construction site, there are a large number of construction workers and production workers living in the construction site, so public security issues are very important.
To this end, we must conscientiously implement the spirit of the document to carry out the rectification of key areas of public security, and take the following measures in light of the actual situation:
1, hold a public security education meeting once a week, assign personnel to be responsible for public security management, and implement various public security management measures to all construction teams.
2. It is forbidden for all members of the construction team to fight, and it is forbidden for all construction personnel to go beyond the prescribed scope of activities, which will affect the life of on-site management personnel.
3, do not comply with the provisions of the construction site public security management, will be dismissed.
Verb (abbreviation of verb) environmental sanitation
1, the construction site timely sort out the domestic garbage every day, and the living quarters must be kept clean and tidy;
2, site garbage must be cleaned every day to prevent pollution;
3. All garbage must be discarded in the designated place, and it is not allowed to be randomly placed.
4, resolutely implement the construction site clean behavior, to ensure the cleanliness of the construction environment. Commitment unit (signature): Xingtai Xinju aluminum-plastic doors and windows Co., Ltd. Commitment person (signature): Date: 20xx April 1 1 Tel: 15803 197955 Part II: Commitment Letter on Construction Safety In order to ensure that no safety accidents occur during the whole construction period, our unit makes the following commitments to the engineering headquarters.
1. Ensure that the safety precautions during construction are carefully organized to ensure that no safety accidents occur during construction. In the event of a safety accident, all consequences shall be borne by the unit itself.
2, establish and improve the site safety, transportation safety, earthwork safety, electricity safety, all kinds of mechanical safety and other safe operating systems.
3, equipped with full-time security officer, hanging safety construction slogan.
4. Ensure that all working procedures are carried out according to the construction laws, design drawings and requirements of the supervision unit.
5. The engineering construction involving changes must be carried out in declare in advance according to the approved construction drawings, and the construction organization design and safety construction scheme shall be prepared.
6. Always remind construction personnel, construction vehicles and mechanical drivers to pay attention to safe construction.
7. Formulate feasible emergency plans for construction accidents.
8, into the foundation pit wall personnel do wear safety helmet.
9, the construction site before start working, according to the construction general layout and division, subdivisional work layout, arrange the location of the construction shed, materials piled up.
10. The pits, wells, ditches, steep slopes and lines in dangerous areas on the construction site should be marked with "Danger" or "No Access", and red light signals should be set at night.
1 1, the roads on the construction site must be kept clear, there is enough lighting for construction at night, and the erection of electrical lines must meet the requirements of electrical regulations.
12. Materials and equipment on the construction site must be stacked neatly and firmly, and dismantled templates and waste materials should be removed in time.
13, the food hygiene of the construction site must comply with the provisions of relevant laws and regulations.
14, excavation construction must leave a certain slope according to the soil conditions (the slope depends on the soil conditions).
15, the construction site that may affect the safety of pedestrians must set up obvious safety warning signs.
16, mechanical operation, someone must be on-site unified command operation.
17. Before operation, the driver should check the machinery and safety braking device in detail to ensure safety and reliability. All mechanical drivers must hold relevant certificates.
18, the operation and use of all kinds of machinery must be carried out in accordance with the operating procedures of the machinery itself.
19. All bridges and culverts, roads, original sewer pipes and all wires and cables along the construction line shall not be damaged.
Commitment unit:
Commitment:
Date, year and month
Construction Commitment Article 5 Our company is responsible for the project construction undertaken by our company in my name, and hereby promises as follows:
1. We will complete the project bidding, settlement, completion and all the work during the project warranty period, and bear all the expenses incurred during the period.
2. All expenses (including industrial accidents) incurred by us in the construction process shall be borne and repaid by us, and have nothing to do with your company.
We will never owe all expenses such as materials, machinery and equipment in the name of your company. If it happens, we will bear the economic and legal responsibilities (deducted from the deposit), which has nothing to do with your company.
We promise not to default the wages of migrant workers. In case of breach of contract, all legal, civil and economic responsibilities shall be borne by us, which has nothing to do with your company.
5. During the construction period, we were accused and punished by the owner and the administrative department for the quality, safety and civilized construction of the project, and we took full responsibility, which has nothing to do with your company.
6. We promise that there will be no safety accidents, otherwise all economic, civil and legal responsibilities will be borne by us, which has nothing to do with your company.
7. Consciously implement the company's safety instrument management measures. See attached table.
8. Voluntary implementation of the company's industrial injury insurance.
9. Voluntary performance of all terms and contents of the project cooperation agreement.
Commitment: attachment: 65438+ 0 copies of ID card.
Badian construction and installation co., ltd
Safety management agreement of electric power construction project
(SAQBl-4 Power Transmission and Transformation Project-Line and Substation Installation Services)
Project name:
Signing place:
Signing time: year month day
Safety Agreement for Labor Subcontracting of Electric Power Construction Project
SAQBl-4 Power Transmission and Transformation Project-Line (or Installation) Engineering Services
Contract awarding unit: hereinafter referred to as Party A's contractor: hereinafter referred to as Party B. In order to implement the safety production policy of "safety first, prevention first and comprehensive treatment", clarify the safety responsibilities of both contractors, improve the management level of safe and civilized construction on the construction site, and ensure the safety and health of the construction personnel, both parties signed the engineering labor subcontracting contract through consultation in accordance with relevant national laws and regulations and relevant regulations of State Grid Corporation of China on safe and civilized construction, combined with the characteristics of this project.
I. Contracted projects
1. Project name:
2. Project address:
3. Scope of contract:
4. Form of contract: labor subcontracting
5. Project contract number:
6. Construction period: from year to year (in case of any change, the actual power transmission time of the project shall be taken as the deadline of the project contract).
Second, the content of the agreement
1. Safe and civilized construction goal
(1) No minor injuries or personal accidents will occur.
(2) No mechanical, equipment or fire accidents, no traffic accidents and environmental impact events with equal or above responsibilities.
(3) No power grid and equipment accidents caused by engineering construction and manual operation.
(4) Meet the requirements of site safety and civilized construction proposed by Party A. ..
2. The main laws, regulations, rules, norms and standard systems for the implementation of this project include but are not limited to:
(1) Law of People's Republic of China (PRC) on Work Safety.
(2) Regulations of the State Council on Safety Management of Construction Projects.
(3) Regulations of the State Council on Reporting, Investigation and Handling of Production Safety Accidents.
(4) National Development and Reform Commission's Work Rules for Electric Power Construction Safety (DL5009.2, DL5009.3).
(5) Relevant safety regulations of national ministries and commissions.
(6) Regulations of State Grid Corporation on Safety, Health and Environment Management of Electric Power Construction.
(7) Regulations on Power Safety of State Grid Corporation.
(8) Rules and regulations of State Grid Corporation on safe and civilized construction.
(9) Local safety and environmental laws and regulations to which the construction project belongs.
(10) Rules and regulations of the owner's project department and general contractor on safe and civilized construction.
3. Rights and obligations of Party A and Party B in respect of safe and civilized construction.
(1) Seriously implement the national, local and State Grid Corporation's guidelines, policies, laws, regulations, rules and standards related to production safety, implement the management systems and regulations of the owner's project department and Party A (general contractor or professional contractor) related to production safety, and earnestly fulfill the management responsibilities of safe and civilized construction and environmental protection related to this agreement.
(2) For subcontracted projects, according to the principle of "labor subcontracting contract and safety agreement shall be signed before construction starts", both parties shall not start construction in advance for any reason before signing the subcontracting contract and safety agreement.
Construction Commitment 6 In order to strengthen on-site construction operation management and effectively prevent and eliminate all kinds of unsafe factors, I (the unit) hereby promise:
First, set up construction safety (warning) signs at the entrances and exits of the construction site, and equip them with corresponding on-site operation safety officers.
Second, the enclosure operation is carried out on the construction site, and the materials are neatly stacked during the construction process, which does not affect the appearance of the city and the environmental sanitation order.
Three, strictly according to the relevant provisions of the volume control, not loud disturbing people, will produce noise, vibration and other processes to make proper arrangements, does not affect the normal production, life and business order of residents.
Four, consciously accept the safety supervision of the city management department, neighborhood committees and all sectors of society in the construction process.
Five, after the expiration of the construction period, dismantle the temporary facilities within the specified time, timely clean up the land occupied by public facilities, ensure the street clean and tidy, and restore the original state and use function according to the standard. If the greening or other municipal facilities are damaged during the construction, I (the unit) shall be responsible for the repair. If the maintenance facilities fail to meet the standard during the warranty period, the maintenance cost shall be deducted from the deposit paid by me (unit).
6. It is forbidden for non-construction personnel to climb, crowd or watch the construction site. In case of any safety accident during construction, I (the unit) shall take full responsibility.
Commitment (signature or seal): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction commitment 70,000 subjects * * * * management office:
I am an employee of Vanke * * * * _ _ _ _ _ _ _, and now I need to carry out on-site maintenance on _ _ _ _ _ _ _ _ _ _ _ _ _ _. You need to use the key and handle, and the use time is:
In order to ensure that the owner's indoor facilities and environment are intact during the maintenance process, I make the following commitments to you on behalf of our company:
1. The maintenance of our employees in your jurisdiction will strictly abide by the national regulations and relevant management regulations of your company.
Second, in the process of maintenance, never intentionally damage the various facilities of the owner's house.
Three, such as in the process of maintenance operations need to change all kinds of equipment, facilities, devices, decoration, buildings or other destructive maintenance, must inform the management office in advance, and obtain the permission of the relevant departments before construction.
Four, after the maintenance work, immediately clean up the maintenance site, shall not leave any items and garbage indoors.
Five, after the completion of housing maintenance, must inform the key administrator for acceptance, after verification, the key administrator can lock the door of the house.
The above commitments are firmly made by our employees. If there is any shortage, it will be strictly implemented in accordance with the penalty clause of borrowing the house maintenance key.
Commitment:
Person in charge of real estate related departments:
ID number:
Contact telephone number:
Contact telephone number:
date month year
date month year