In 2003, 1 and 746,000 yuan were used to complete the construction and configuration of septic tanks, boiler rooms and other supporting facilities, so that the teaching building was successfully put into use in the autumn of 2003. The potential safety hazard of dilapidated classrooms was fundamentally eliminated, and the history of 24 schools without heating was ended. 2. Taking advantage of the opportunity of expressway construction, more than 40,000 cubic meters of soil was taken from the playground 3 meters above the school level, which completely leveled the playground, saving 1.5 million yuan for the school, and expanding the playground area from the original 9,000 ㎡ to 1.5 million ㎡; A 300-meter-long runway, 20 self-made table tennis tables and 2 hardened basketball courts were built. 3. Comprehensively clean up old diseased fruit trees. In 2003, teachers and students will plant 3500 square meters of lawn by themselves to beautify the campus. 4. Use the summer vacation to mobilize some teachers and students to demolish 79 dangerous houses with a total area of 4,266 ㎡, and sort out more than 30,000 pieces of waste bricks for reuse; Level the land of 3,500m2, and mobilize all teachers and students to plant a bunch of red flowers, Petunia, Celosia cristata, Dianthus, Dahlia, Rose, September Chrysanthemum, Buddleja and other flowers in the following year.
In 2004, 1, the self-raised fund was10.5 million yuan, and it took five months to build a 2 160 ㎡ student dormitory, which was put into use in the autumn of that year, adding 100 beds, 200 beds and 40 cabinets, which fundamentally solved the accommodation of more than 700 students. Demolition of old civil buildings in the 1950s eliminated potential safety hazards. 2. In spring, teachers and students planted nearly 6,000 poplars, acacia trees and cedar trees, with a survival rate of 96%, basically forming a campus greening network. 3. Complete the hardening task of two basketball courts.
2005. 1, divided "party member Responsibility Field" and so on, and packaged the green space, flower beds and saplings of the whole school. Go to individual teachers or classes, strengthen management and build a "green school". 2. Make full use of the advantages of teaching staff's calligraphy and painting, design exquisite calligraphy and painting slogans in the eye-catching place of the school building, create an educational environment with strong humanistic atmosphere, let the walls speak, and make the school look brand-new. 3. Harden 455㎡ and build 2 badminton courts; Hardening 494㎡, building two volleyball courts, enriching the content of physical education class and the extracurricular cultural life of teachers and students. 4. Teachers and students are obliged to demolish 12 dangerous houses to eliminate potential safety hazards. Brick road 1500m2.
In 2006, the ruins 1.4 million square meters were cleared and leveled, and poplar 1 100 plants, 20 cedars and 80 yellow roses were planted, further greening and beautifying the campus environment. 2. Further improve the varieties of flowers in the garden and prolong the flowering period. 3. Every office and financial office are equipped with computers, and new multimedia classrooms are installed, with broadband access, which speeds up office automation and facilitates teachers to obtain information online. Many teachers began to make courseware, take classes with multimedia, and make a transition to the new curriculum standard. Every office is equipped with a three-dimensional drinking fountain, which improves teachers' drinking water.
2007 is a historic breakthrough in school construction, with a large amount of construction and transformation. 1, with an investment of 50,000 yuan, the aging circuit that has been used for more than 20 years is reformed, and the original criss-crossing and cobweb-like circuit is completely updated by adopting technical lines, thus eliminating the hidden danger of electric leakage. This year's electricity saving effect is very obvious, saving nearly 45% of the funds every month. 2. Strive for national long-term mechanism funds, and invest 6,543.8+0.85 million yuan to build a 2,600 ㎡ comprehensive experimental building. 3. Strive for 800,000 yuan for the construction of senior middle schools in the city, and raise 420,000 yuan by itself, with a total investment of 6,543,800 yuan+0.22 million yuan. We set up a project to build a school canteen, and the drinking water renovation project is 654.38+0.320 ㎡, which has been put into use. 4. We managed to build a 430m2 staff dormitory and raised 330,000 yuan by ourselves. 5. Outdoor water heating pipeline extension 192m, with an investment of 50,000 yuan. 6. Paint investment 1600㎡ is built on the third floor of 1985. 78 thousand yuan to buy a car.
2008 1, 80 new teachers' desks ×380 yuan = 30,000 yuan. 2. Add 40 sets of single beds ×360 yuan =1.4000 yuan. 3. Equipped with four laboratories of chemistry, biochemistry and physics, about 260,000 yuan, and decorated the school showroom about 1.4 million yuan. 4. The investment in starting the cooker is about 50,000 yuan; 5. 50 new microcomputers with an investment of 6.5438+0.8 million yuan. 6. The hardened main road 150m, with an area of 750m2, completed the hardening work in front of the laboratory building, canteen and dormitory building, with an area of 800m2. 7. Install 16 blackboard in the experimental building, 20,000 yuan, 20 book frames and instrument frames, 36,000 yuan. 8. The 50th anniversary celebration was successfully held.
In 2009 1, 455m2 staff dormitory building,190m2 bicycle shed and 60m2 cooking cellar were newly built, with an investment of about 700,000 yuan. 2. Add 40 beds and 70 bed boards, 20,000 yuan. 3. Repairing the school gate to National Highway 109 350㎡, straightening, widening, bridging and greening, with an investment of more than 500,000 yuan. Victory has realized the dream of twenty-four China people for half a century. 4. This year, a number of sports equipment, such as sandbags, dumbbells, barbells, shot puts, solid balls and mats, were purchased for the special physical education class, and all kinds of drugs and equipment were added to the laboratory by 6,543,800 yuan. 5. The 3 1.20㎡ new girls' dormitory project with an investment of 4.42 million yuan will be launched soon, and we have completed the preliminary work of site relocation and leveling. Now it has reached the tender stage, and all formalities will be completed at the end of the month.