Will venues 2, 3, 4 and 5 of the convention and exhibition center be transformed into? Shelter hospital? , with a total construction area of about 2 1 1,000 square meters and beds 1 1,500. Each venue is a medical area, each medical area is divided into several nursing units, and rescue units are added in Hall 3 and Hall 5. In the design, clean area, potential pollution area and pollution area are strictly divided; Establish special channels for medical treatment, patient and sewage treatment and transportation. Museum sewage is discharged into the municipal pipe network after centralized treatment, disinfection and precipitation, and the waste gas is discharged at high altitude after passing through the high-efficiency filtration system. Has the isolation point between the shelter hospital and the shelter been realized? All receivables and all treatment? And improve the admission rate. It is more convenient to further achieve the goals of scientific policy, classified treatment, effective control of infection sources and cutting off transmission routes.
According to the group's rapid response, party member played a vanguard and exemplary role, sending 200 volunteers and investing 3,000 workers to start work at the same time. The epidemic situation is the order, and Changchun Construction Investment Personnel completed the task of building isolation points in only four days. Time is more urgent and arduous. It is necessary to complete the partition construction of two receiving hospitals and two beds as soon as possible, speed up the sprint to control the source of infection, treat the infected people to the maximum extent, and win the epidemic struggle as soon as possible. Strive to transform the 15000 square meter main hall and training hall into temporary admission places with hundreds of beds in the shortest time. ? Our tasks include building internal isolation, sewage treatment facilities, building internal facilities and equipment, personnel and materials access, health and epidemic prevention, safety protection and so on.
The isolation shelter is planned to be built in two blocks in turn. Upon completion, it can provide 1200 beds. At present, 700 beds have been built in this plot, and 300 laborers cooperate with more than 60 excavators, forklifts, transport planes and other equipment. The isolation shed is expected to be completed on 10. 24-hour construction of the project ensures that the construction task can be completed quickly and smoothly.
School inspirational slogan (1)
(1), abandon the fluky psychology, and you must choose one of them; The works with thick integral seconds