2. Seriously study and master advanced power technology, and be familiar with the use, structure, principle, performance, operation and maintenance of power and electrical equipment within its jurisdiction.
3, strictly abide by the ministerial circuit technical regulations and safety regulations, to ensure safe power supply, to ensure the normal operation of electrical equipment.
4, often go to the scene, patrol and check the status of electrical equipment and its safety protection, listen to the opinions of the operators, it is forbidden to sleep in class.
5. Fill in the records of electrical equipment overhaul (maintenance items, contents, parts, replacement parts, date, working hours, spare parts and material consumption, etc.). ) and accumulate raw data.
6. According to the debugging requirements, participate in the major and medium repair debugging acceptance of the repaired equipment.
7, master the use of tools, measuring tools, instruments and carefully keep, save the use of spare parts, materials, oil. Do a good job in civilized production and make handover records.
Safe operating procedure
1, power failure operation, must first check whether there is electricity, before work, all installed equipment or repaired equipment, strict inspection before sending, sending.
2, under normal circumstances are not allowed to live work, must live work, to do a good job of reliable safety protection measures, there are two people to cooperate (one operation, one care).
3. High-altitude and high-pressure operation is prohibited in thunderstorm days (high-voltage tie rods are prohibited, etc.). ), and the outdoor work must be cut off in rainy days, and the tools should be kept as dry as possible.
4, aerial work must wear a seat belt, rope and tool bag, it is forbidden to throw things up and down.
5, aerial work must implement the system of stop sending working ticket, no working ticket, no ticket, no power.
6. Adhere to the "four noes" in aerial work: the ladder is not firm, the safety equipment is unreliable, the line is not monitored, and the line identification is unclear.
7, live work, don't cut any current-carrying wire.
8. Be sure to check whether the tools are in good condition and used reasonably before work. Before work, you must first check the safety situation at the site to ensure safe operation.
9. After any electrical equipment is dismantled, there shall be no exposed live conductor. When cleaning the motor coil, oil stains and sharp metals shall not be used to avoid damaging the insulation. The circuit shall not be changed without permission during equipment maintenance, and the installation must be carried out according to the drawings.
10. When general (temporary) electrical equipment is connected to the power supply, it is forbidden to connect it directly or by hanging, and a temporary switch or circuit breaker is needed.
1 1. Wear high-voltage insulating gloves when using high-voltage pull rods.
12. In case of an emergency that seriously threatens the safety of personnel or equipment, you can turn on the relevant switch first and report to the superior afterwards.
13. Before equipment maintenance, it is necessary to cut off the power supply, lock it or hang a "power failure operation" sign.
14. When repairing the transformer, both the high and low voltage sides need to disconnect the line power supply and load line to prevent accidents such as high voltage.
15, 300 amp current transformer, and live working is prohibited in the secondary circuit.
16, electrical safety appliances and equipment should be regularly checked for insulation, and a withstand voltage test should be conducted once a year.