Collection of Summary Essays on Personal Work of Construction Project Management
The advantage of work summary is that you can find your own shortcomings in time and make adjustments. Only in this way can we make targeted improvements in the next work. The following is the Summary of Personal Work of Construction Management Fan Wenxuan compiled by me, for your reference only. Welcome to reading.

Personal Work Summary of Construction Project Management-Fan Wenxuan 1. When I bid farewell to the old year and welcome the new year, I summed up my work in the past year, including progress, gains, achievements and shortcomings. ...

First, the overall working state

(A) the first half of the work-intense and busy green

Due to the company's short establishment time and insufficient staffing, I was also responsible for the on-site management and data collection and collation of the comprehensive building project of xx Heavy Industry Machinery Co., Ltd., the workshop project of xx Equipment Manufacturing Co., Ltd. and the 8# workshop project of xx Co., Ltd. in the first half of the year, because the start time of the three projects was concentrated and the main construction was carried out at the same time, so I was very nervous and busy during the day. Despite this, there have been cases where several construction sites have things to deal with at the same time, and they have been complained because they cannot be present at the same time.

(B) the second half of the work-relatively easy.

In the second half of the year, xx kindergartens in the United States have been completed and accepted. In addition, there are two interns who can help me share part of the work, so the work in the second half of the year is relatively easy.

Second, perform job responsibilities

1. Be fully responsible for the organization, coordination and command of site construction.

After the establishment of each project department, I immediately assisted the project manager to conduct on-site inspection, draw the layout of the construction site, rationally plan the location of construction roads, yards, construction machines and tools and temporary facilities, and cooperate with the company's security department to guide the setting of temporary electricity consumption at the site. Several projects basically reached the construction specifications and safety acceptance standards at one time.

In the process of project implementation, after receiving the instructions from the company and leading departments at all levels, I conveyed and implemented them in time, and gave timely feedback on the implementation. Coordinate with the construction unit, supervision unit, project department and team for many times in the work to avoid differences and contradictions.

Over the past year, the work of each project department has been carried out smoothly, and the construction and production have been carried out in a healthy and orderly manner.

2. Technical guidance work

(1) Before the project starts, carefully study the drawings, summarize the problems found by the supervisor and each team, and solve them one by one in time in the blue prints.the design.

(2) Before each working procedure starts, technical disclosure shall be made to the team leader in time, and the construction of key parts shall be kept on the sidelines, and problems shall be solved in time when found.

(3) If there are problems in drawing design or construction, actively seek solutions and communicate with site supervisors and designers to ensure smooth construction.

3. Quality management

(1) Strictly control the quality of materials entering the site, including checking the quality assurance information, checking the appearance of materials, and sending samples for testing in time to prevent unqualified materials from being used in the project.

(2) Timely disclose the construction specifications and quality requirements to the team leader, and check their implementation, so as to increase the frequency and intensity of inspection and avoid rework and quality hazards.

(3) Strictly implement the "three inspections" system. If any quality hidden trouble is found in any link, the relevant personnel shall be required to rectify immediately, and the next working procedure can only be carried out after the rectification is qualified.

4. Project management

(1) Make a general schedule before construction, make a monthly schedule and a schedule of specific processes (such as concrete pouring time) during construction, check the implementation of the schedule, and make reasonable adjustments when necessary.

(2) Coordinate each team to cooperate with each other, reasonably arrange cross construction, and speed up the construction progress to the maximum extent on the premise of ensuring quality and safety.

(3) Pay attention to the weather at any time, so as to adjust the operation plan and reduce the influence of the weather.

5. Cost control

(1) When calculating the required material quantity, we should try our best to be correct, communicate with experienced construction personnel more, reasonably determine the material loss quantity, and try our best to avoid increasing the procurement cost and storage cost due to inaccurate calculation.

(2) Rational use of reusable materials to avoid unnecessary waste.

(3) Strengthen guidance and management to reduce rework losses.

(4) Accelerate the construction progress reasonably and reduce the cost effectively.

6. Safety management

(1) Conduct regular safety education for team leaders and workers to improve workers' safety awareness.

(2) Hang safety signs and warning signs on the construction site to create a good safety production atmosphere.

(3) Strengthen the frequency and intensity of safety inspection to eliminate potential safety hazards in time.

(4) Punish those who fail to rectify potential safety hazards and obey safety production management, and clear the construction site when necessary.

7. Data collection and collation

(1) Collect all kinds of technical data and safety data in time to ensure that the data is synchronized with the progress.

(2) After the acceptance of each sub-division and sub-division project, the signature and seal formalities shall be handled in time to avoid the backlog of data.

(3) Data collection and arrangement should be properly kept to avoid loss.

(4) After the completion acceptance, timely handle the completion filing and data transfer.

8. Learning and training

In the past year, I have been constantly improving myself through study and training. 20xx passed the training and passed the examination, and obtained the B certificate of full-time safety production assessment. In 20xx, I took the national first-class constructor exam and passed the X subject.

Third, the shortcomings in the work and the direction of efforts

(A) not familiar with the implementation of the new specification

The new code has been implemented since 20xx 10, such as the retention scheme of mortar test blocks, the popularization and use of high-strength steel bars, and the strengthening of seismic design. The company has purchased a complete set of specifications, and needs to strengthen study in the future work to avoid work mistakes caused by not understanding the new specifications.

(B) the feedback of the problem is relatively lagging behind

The work in 20xx has been carried out smoothly on the whole, but there are still some problems. For example, Tuoshan Heavy Industry had a dispute caused by workers asking for wages. Because it failed to gain insight in advance and give feedback to the company leaders, the dispute could not be avoided. Besides. The comprehensive building project of Soter Auto Parts Co., Ltd. was delayed in making five certificates and one picture because of listening to Mr. Wang's one-sided words and not communicating with the leaders in time.

(3) the local direction of efforts in 3)20 xxxx years

1. Strengthen learning, improve and accumulate experience and methods, carry out whole-process and all-round project management, and strive to become high-level and compound middle and senior management talents.

2. Strengthen the study of office software and improve work efficiency.

3. Strengthen theoretical study and combine it with practice, and strive to achieve good results in the 20xx second-level constructor's additional items and the first-level constructor's physical examination.

4. Strengthen communication with colleagues and leaders to carry out the work better.

Fourth, summary.

Looking back on the old year, it is both a tense year and a full year. Looking forward to the new year, in the new year, I will sum up experience, learn lessons, work harder, put myself into my work with a fuller and more down-to-earth work style, and make greater contributions to the company.

Construction project management mode essay selection personal work summary 2 When the footsteps of the New Year came quietly, my work in xx Construction Co., Ltd. for 20xx also came to an end. In the past year, with the careful care and help of the company leaders, department managers and colleagues, I seriously studied and understood the corporate culture spirit of the company, kept in mind the company's purpose and mission, followed the corporate philosophy, obeyed the work arrangement, strengthened my study and exercise, earnestly performed my duties, and successfully completed various tasks assigned by the leaders. Now, I will summarize my thoughts and work this year and my future efforts as follows:

I. Work Report for 20xx

With the pursuit of ideals and love for architecture, I came to XX County XX Construction Co., Ltd. in XX month to work in the comprehensive management department. In this year's work, I am engaged in the bidding of the company's engineering projects, the sending and receiving of documents, the declaration of professional titles, and the filing of the company's internal files. Has participated in the company's xx hospital outpatient building renovation project, xx comprehensive teaching building, xx maintenance and renovation project, xx project, xx low-rent housing project, xx project and other more than 20 large and small engineering projects bidding and binding.

At the same time, receive all kinds of documents issued by superiors in time and report them to the general manager and chairman for approval. The spirit and notice of relevant documents after examination and approval shall be distributed to all project departments in time, and all distributed documents shall be registered. Respond positively to the notice issued by the superior to declare the assistant engineer's documents, and organize the internal personnel of the company to declare actively. The number of assistant engineers declared this time is xx. In order to further improve the company's internal management requirements, the company's internal files are re-standardized. Set up the company's archives room, register and file the company's internal data according to different years and different projects, and record them in the book, so as to make the company's internal management target by going up one flight of stairs.

Second, be positive and take every study and training seriously.

Seriously study and understand the company's corporate culture, carefully study the company's relevant management regulations and documents, and learn the company's relevant meeting spirit and leadership speeches. Through the study, I learned that the company has put forward very concise and incisive requirements for building quality, safe production, enterprise management and team building. Clarify the company's future development ideas and key work and requirements at this stage. Consciously and actively put the ideas and concepts of the corporate culture of the whole company into practical work, and guide us to better complete various tasks.

In order to further establish a correct outlook on life and values, and improve my self-cultivation and consciousness, I actively joined the company's working committee to learn about the line, principles and policies of the party and the country, and submitted an application for joining the party.

I take every training and study organized by the company seriously. The company is people-oriented, concerned about people's development and caring for employees. I feel the same way. The company spends a lot of manpower, material resources and financial resources to organize various trainings frequently to train employees. In this year's time, I have the honor to participate in the study and training of cost engineers, consolidate my theoretical knowledge, learn my business skills at work, and get tested in practical work, which will benefit me immensely.

Three, strengthen the study of various professional knowledge, and strive to improve their professional knowledge level in all aspects.

With the continuous development of society and the continuous progress of the company, what we have learned is far from meeting the requirements of the company. In this regard, I used my business time to learn many professional knowledge such as economic management of project cost, construction laws and regulations, construction contract management norms and so on. To improve my professional knowledge and technical ability and pave the way for the development of the company.

Fourth, know yourself correctly and find out the gaps and shortcomings.

In this year of work, my ideological understanding, consciousness and working ability need to be further improved. My knowledge and understanding of some problems is one-sided and not objective enough, which leads to some negative thoughts in my work and life. In the future, I will strengthen my study, improve my ideological understanding and face my work and life positively and optimistically.

In terms of work, the thinking is not clear enough, and there is a phenomenon that you want to do things well but you can't do them well. I don't have a deep understanding of the knowledge I need and the business I should be engaged in. Some problems are not considered comprehensively, and sometimes the views and practices on things are relatively one-sided, which leads to the phenomenon that work is delayed. The study and understanding of the company's rules and regulations is not comprehensive enough, and the company's rules and regulations can not be better reflected in every detail of their work. It is necessary to further strengthen the re-study, re-understanding and re-understanding of the company's rules and regulations.

In the study, the knowledge learned has not been effectively consolidated. Not using and operating immediately after learning and training, leading to the phenomenon of learning today and forgetting tomorrow. I will learn and consolidate knowledge points according to the memory cycle in the future.

Verb (abbreviation of verb) In the future, we will constantly improve our comprehensive quality and make contributions to the development of the company.

With the rapid development of the company, it can be expected that our work will be more arduous and demanding, and the knowledge we need to master will be broader and deeper. To this end, I will work harder, study hard, strive to improve my ideological and cultural quality and professional skills, and make due contributions to the development of the company.

Summary of personal work of model essay on construction project management Three people were selected. They graduated from the Industrial and Civil Architecture Department of xx Building Engineering in 20xx 10, and joined the xx Electric Power Construction Company of xx Province this month. Now they are working in the civil engineering laboratory of xx project. Since joining the work, I have abided by the rules and regulations of the company and the project department, actively obeyed the work arrangement of the leaders, successfully completed the work tasks, safeguarded the collective honor, demanded ideological progress, and conscientiously implemented the company documents and the spirit of the meeting. Seriously study relevant experimental knowledge and constantly enrich and improve yourself. Now I will briefly summarize the work of this year as follows:

I. Politics and ideology

Wearing a strong sense of ownership, I always pay attention to the development of Power Construction xx Company, thinking about the interests of Power Construction xx Company, project department and laboratory, and firmly believe that Power Construction xx Company will continue to grow and develop, and I am full of enthusiasm and expectation for the future of Power Construction xx Company. Although I haven't joined the China * * * Production Party, I will be strict with myself according to party member's standards, consciously accept the supervision and help of party member and my colleagues, persistently overcome my shortcomings and make up for them, and strive to stand the test in the long years to come and join the great China * * * Production Party as soon as possible.

I start from doing my job and daily work well, from me, from now on, from the little things around me, and persevere. I will do my best and make unremitting efforts in my work. I will constantly improve my job skills, strive to master my job knowledge, be the backbone and expert of my job, and do my job in a down-to-earth manner.

Second, the work attitude

No matter at work or in life, I always believe that there is a harvest from hard work, so I have been working hard, studying hard and working hard. Love your job, be able to treat every job correctly and seriously, be dedicated and love your post, get to work on time, make effective use of working time and stick to your post. The construction period is tight, there are few people and many tasks. Being able to follow the work, ensure that the inspection task is completed on time and the project inspection is carried out smoothly, which shows that our testers have a strong sense of responsibility and carry forward the spirit of continuous work and hard struggle.

Third, job responsibilities

Conscientiously implement the national guidelines and policies on standardization, quality management system, product quality supervision and inspection and research and development; Really implement the relevant standards, testing methods and regulations of engineering products that this position is responsible for supervising and testing, and ensure that every test has laws to follow. Do a good job in entrustment acceptance, project investigation, data and feedback, and keep a tracking ledger for future reference. Due to many test items and different test time, the work should be done well in advance to avoid delaying the construction period and affecting the progress because the technical personnel of the construction unit do not understand the engineering test requirements and technical indicators. Our laboratory staff adhere to the four cardinal principles, carry out the quality policy, implement the quality objectives, abide by the rules and regulations, and serve the construction site wholeheartedly.

Fourth, specific work.

My job is mainly to test and inspect some civil engineering materials (cement, sand, stone, steel, brick, etc.). ) and finished products (steel weldments, concrete blocks, etc. ); Participate in concrete matching test; Supervise and control the mixing of concrete in the mixing station; Control site concrete and backfill soil, etc.

When I first joined the work, the first thing I came into contact with was the backfill inspection. Backfill soil is simple and boring, but most people think it's nothing but adding some soil. But after working for a period of time, it is not so simple: starting from the material requirements of the soil, compact the soil and set its control index; Which parts need to be backfilled and which parts need to be backfilled with sand or 3: 7 lime soil should be controlled by technical indicators; Selection of backfilling machines and tools; Are the conditions available before backfilling? Whether the strength of underground concrete foundation meets the specified requirements, the material selection, compactness requirements, virtual paving thickness and compaction coefficient of soil have been determined, and the backfill compaction can not meet the requirements, which will cause landslides, subsidence and even bring greater harm. Therefore, it is not so easy to do anything in your mind until other materials that you gradually come into contact with are tested, and there is no room for ambiguity.

Contact more project tests in the laboratory one after another, define the working procedures, and form clear working ideas in specific work, so as to carry out the work smoothly and complete the work skillfully and successfully.

1. control of raw materials: each batch of raw materials entering the site must have the manufacturer's quality guarantee and inspection certificate, and each batch of raw materials must be inspected according to the specified quantity. (1) For cement, when bulk cement warehouse is used, it is forbidden to mix cement from different manufacturers, varieties and labels. When using bagged cement, protective measures should be taken to prevent cement from caking due to moisture. When using cement stored for more than three months, contact the laboratory in advance to conduct a second review of the actual label of cement. (2) Sand and gravel shall not contain foreign bodies, coal dust, etc. Especially those that are not mixed with white ash. If the raw materials are found to be inconsistent or abnormal with the samples, they should contact the laboratory in time and handle them. In order not to affect the construction progress, all raw materials entering the factory must be debugged in time. The cement test adopts 3d strength and 28d strength, and the test reports of steel, sand and stone. Will be released within 24 hours after laboratory debugging. All materials to be tested must be certified by the laboratory before they can be used. The principle of inspection before use, otherwise it will be regarded as unqualified products and prohibited from being used in engineering.

2. Backfill control: Before backfill construction, the construction department shall truthfully fill in the backfill entrustment form and carry out the construction according to the requirements of design drawings. There is no requirement, according to national standards. The water content of soil material selected for backfill construction is the best. The paving thickness of each layer of backfill soil shall be compacted by layers according to the specifications, and shall not be rammed by leakage, and shall be accepted step by step. Only after passing the inspection can the next backfill be carried out, otherwise the construction unit will rework it.

3. Concrete engineering. For concrete and mass concrete with special requirements, it should be entrusted in advance, and can be opened for identification after can opening. (2) Every time concrete is mixed in the mixing station, the mixture ratio should be strictly implemented, slump and workability should be controlled, and the mixing and production control records should be made. If the water content changes greatly, the laboratory should be informed in time to make dynamic adjustment. When using fly ash, environmental pollution should be avoided or reduced. The concrete test block is left in the mixing station, and the laboratory will assess the concrete production of the mixing station according to the concrete grade, batch and time produced by the mixing station to control the concrete production level.

4. Welders who enter the construction site for civil work must submit a copy of the welder's technical grade certificate and a list to the laboratory before the project starts. Before the start of the project, the welder should be tested for welding. After the test report is issued, the welder can carry out formal operation.

As soon as I joined the work, I quickly integrated into the work, constantly demanding myself and constantly urging myself to improve. As a young worker, I dare not neglect my work at all. I ask myself to write down the gains and losses in my work and the problems that appear every time, so as to learn lessons. If you encounter problems or difficulties in your work, you will consult with the general manager and leaders, listen to his opinions and suggestions patiently, and improve your work. Because my department only works in a small circle most of the time, I can't just sit back and wait. Frequent and irregular contact with the construction site to understand the engineering procedures and steps, so as to better serve the work in the future.

Verb (abbreviation for verb) Work achievement

I learned a lot at work and exercised myself. Through unremitting efforts, my work level has been further improved, and I was awarded "Personal Second Class" by xxXX Project Department in the first XX-day Campaign Meritorious Competition. In addition, with the mutual cooperation and collaborative efforts of other colleagues in the laboratory, my civil engineering laboratory of XX project was rated as "collective first class".

Looking back on the past year, I was busy and full. What I learned in school textbooks is all theoretical knowledge, and the practical experience accumulated bit by bit at work now is an inexhaustible asset in my life. This year, there were difficulties and gains. Because of my hard work, I have fulfilled my personal responsibilities and strengthened my ability to make greater contributions to the company.

Four or three months will pass. During this period, I participated in the project management process of the project team, experienced continuous learning, understanding, thinking and mastering, got a deep understanding and understanding of real estate projects, and had preliminary practical experience in project site management, which laid the foundation for further work in the future. According to my personal work experience from X to X, I summarize as follows:

First, learn to implement.

In project management, execution is an important link. The untimely and inadequate implementation will directly lead to the delay of the construction period and the intermittent construction work, which will bring huge losses to the project. In order to avoid problems in task execution as much as possible, this requires us to keep a clear head at all times, actively and independently study and understand the project management regulations and related engineering contracts, formulate a sound work plan, strictly implement the project management regulations and construction specifications formulated by the company according to the system, implement the details and solve the problems one by one. Take the management regulations as the criterion and the project contract as the basis in the work, so as to be justified. In the process of carrying out tasks, we also need to pay attention to work skills and accumulate work experience. Grasp the progress information of relevant departments in time and accurately, combine the actual situation of the project site, make overall plans, adjust measures to local conditions, and accurately and meticulously implement specific details, so as to strive for the minimum loss and maximum profit for the enterprise.

Second, new feelings

Subjective initiative. A lot of finishing work and acceptance work of xx people's project are waiting for each of us. In particular, some complicated tasks have no rules to follow, and what is needed is to implement them in a down-to-earth manner. So the importance of subjective initiative is self-evident. When dealing with work and tasks, we should carry out what we understand, what we don't understand, what we can do and what we can't create. More often, what is needed is to face problems positively. When encountering problems, it is not to push the Committee to make things difficult, but to give full play to the subjective initiative and seek solutions to the problems. Nothing can't be solved. Correctly understand the positive work attitude: "act wholeheartedly and immediately". I believe that as long as you put your heart into it, there are always more ways than difficulties, and you will be able to solve the problems in your work perfectly and earn more profits for the enterprise.

Third, efficient cooperation.

As the project has entered the substantive closing stage, a lot of meticulous and tedious work needs to be accurately implemented and arranged, which requires the project team members to cooperate with each other more efficiently and closely to formulate more specific and effective closing work plans and corresponding catch-up plans. The planning of a project cannot be completed by one person or one department alone. In addition to accurately grasping the progress of the project and reasonably arranging the project, it is also necessary to contact and pay attention to the progress of other departments, including civil engineering, plumbing, strong electricity, weak electricity and other aspects, and formulate practical and efficient concrete plans and implement them in depth.

Fourth, update the understanding of the works.

Pay attention to details and keep the right attitude. Any work requires us to carry out it in depth and in detail. We often say that "details determine success or failure" and "mentality determines everything", which is easier said than done. More often, regardless of the size of the work, we need to actively go deep and find ways to solve it. It is normal to encounter problems and difficulties, depending on how we treat them. A positive attitude can make us get twice the result with half the effort, take it seriously, be meticulous, do it yourself, never give up, and we will certainly accomplish the task well!

Five, nip in the bud

In the process of daily work inspection, we should pay attention to observation and thinking, and be good at finding problems in time, putting forward problems, analyzing problems and solving problems. Don't take any subtle problems lightly, but do the work more carefully and in place. At the same time, it is necessary to pay enough attention to the external factors that can threaten (or potentially threaten) the project, strengthen communication with the construction unit, and strengthen supervision and quality supervision. Timely remind the construction unit to strengthen on-site construction management, take corresponding measures, and implement the details in one step. However, from the management of on-site projects, the work we have done is far from enough. We need to concentrate on learning, pay attention to observation, and pay enough attention to any subtle problems to nip in the bud. Put the work into practice, step by step, and strive to do better.

6. When performing the task, everything will be based on the maximization of the company's interests.

In order to catch up with the completion date as soon as possible, we need to actively guide, supervise and help the construction unit to complete the work task. You can't just throw the scheduled task to the construction unit and be the shopkeeper of cutting yourself. This is a very irresponsible performance and must be vigilant. In project management, we should also maintain a certain attitude of mutual understanding and respect for the construction unit. What we want is not "Party A"; Party B "is not good for our project; And cooperation is the foundation of success, "Party A+Party B ≥ success", which is the truth of our pursuit of winning in business. Everything we do is for the same goal, that is, to push the cause of Fu Jia to a higher and further level!

The above points are my personal work feelings summed up in view of some key problems encountered in my work during this period, which run through certain personal thoughts. However, due to my short working hours, lack of experience and insufficient level, there are still many shortcomings. Please correct me!