Content from users: Yunjiu graphic
Workflow of production workshop in garment factory
Chapter 1: Production flow chart of garment factory.
Production flow chart of garment factory
Workflow of production workshop in garment factory
(1) The cutting work is to collect fabrics from the fabric warehouse and accessories from the accessories warehouse according to the production notice and production plan issued by the production department. China University Network Model Work Summary: Work Flow of Production Workshop in Garment Factory. Cut fabrics, linings, linings and other raw materials into pieces needed for clothing.
(2) Make typesetting drawings according to the production notice and hand them over to the computer typesetting master in the board room for typesetting. After the board room supervisor reviews, he outputs the drawings on the plotter, and summarizes the work flow of the production workshop of the garment factory ().
(3) According to the length of the layout and the number of layers required by the process, the cutting master stacks the fabrics layer by layer on the cutting bed. The paving length and number of layers should be correct, the cloth edges should be aligned, the cloth surface should be flat, and the cloth should be pulled as tension-free as possible. Pay attention to the elimination of defective fabrics and the requirements for plaid strips. The paving thickness shall not exceed the maximum cutting height of the cutting equipment.
(4) The cutting master cuts the fabric into pieces, and completes the operation according to the pattern lines of the plotting diagram. Select cutting equipment and cutter shape according to process requirements and fabric characteristics. Pay attention to the cutting accuracy of clothes and fix the fabric when cutting. The positioning mark on the cutting piece shall be
(5) The strapping workers are responsible for numbering the stacks of cutting pieces. Due to the large number of cut pieces, in order to avoid confusion and mistakes in clothing collocation, the cut pieces are classified, bundled and packaged.
(6) The cutting workshop should also register daily handover records and film changing records with the sewing workshop.
(7) The flat seam workshop arranges production tasks according to the production plan and production notice, and the assembly line layout should fully consider the load balance and flow efficiency. The adjustment of assembly line should be included in the performance appraisal of production factory director and vehicle management. Six, each workshop in strict accordance with the production plan, according to the workshop equipment and personnel, carefully organize production. (sample clothes)
Chinese character configuration adopts Chinese character station arrangement. Incorporating the object of inquiry into Chinese characters c