Temperature requirements: It is suggested that the indoor temperature should be detected every time painting. During paint construction, the wall temperature shall not be lower than 5℃ and the ambient temperature shall not be lower than 8℃. If the ambient temperature is lower than 8℃ for several days, construction is not recommended. Before construction, doors and windows should be closed. If it is not closed properly, doors and windows or windward parts will crack and delaminate due to poor temperature and humidity.
When painting the wall materials with natural zeolite coating, the construction should be carried out in strict accordance with the construction ratio and fully stirred evenly. It is forbidden to apply it once, and it is forbidden to add too much water, so as not to cause the paint film to crack or fall off powder. Sufficient drying time should be kept between two coats of paint to avoid sagging and cracking. The repainting time generally requires more than 4 hours in winter and more than 2 hours in summer, and the rainy and humid weather is appropriately extended.