Current location - Quotes Website - Excellent quotations - What are the precautions for water and electricity in home improvement? Does it matter?
What are the precautions for water and electricity in home improvement? Does it matter?
Every household can't live without water and electricity, especially when decorating, the transformation of water and electricity is very important. Hydropower transformation is a hidden project, and it is also an error-prone project. If we don't pay attention to the decoration, it will easily bring us a lot of trouble in our later life. Therefore, whether you choose a decoration company or a hydropower company to carry out hydropower transformation, you need to strictly control yourself. So what are the precautions in the process of hydropower transformation? Let's study together. First of all, do a good job in hydropower positioning. According to reports, before the hydropower transformation, it is best for owners to determine the types and categories of household appliances they need, the types and locations of various switches and sockets, and the location of waterway interfaces, and reserve space according to their actual needs and the types of various household equipment to do a good job in hydropower positioning. Cabinets are generally customized by professional cabinet companies, so cabinet companies need to provide specific design drawings, and arrange the direction of kitchen circuits and waterways and the specific positions of switches and interfaces in strict accordance with the design drawings. Let the decoration company issue a specific hydropower transformation plan and a detailed cost list. In the hydropower transformation, the decoration company is required to strictly follow the hydropower transformation diagram to avoid unnecessary waste. Wires are connected to cable TV lines, broadband lines, telephone lines and other information equipment. Strong and weak wires should not only be connected, but also keep a distance of at least 30 cm to avoid current interference. Finally, control the quality. Hydropower transformation is a concealed project. Once the water and electricity acceptance is over and the walls are painted and bricked, the engineering problems will be inconvenient to repair. Therefore, in the hydropower transformation, we should not only pay attention to the construction quality, but also carefully select materials. Regarding the materials needed for hydropower transformation, Manager Wang of the Decoration Engineering Department suggested adopting some well-known national standard products, at least with a quality assurance in the selection of materials. When doing the above operations, it mainly involves slotting, which is generally the work of masons. But if there is a cutting machine, the plumber can do it very conveniently. Slot alignment involves bricklayers. Therefore, from the operational process, it is the cross operation of three types of work. If you are decorating yourself rather than decorating a company, you should pay attention to coordinating their cross-work and mutual cooperation. Wires should be conventional products, and conduits and cassettes must be flame retardant. Because it is a concealed project, we can't be careless. On the waterway, water pipes should also be regular and reliable products. Either way, it must be reliable. The pressure test shall be carried out in strict accordance with the standards. For weak current video cable, double shielded cable with thick core must be used. Telephone lines and network cables should not be sloppy. Before construction, the upstairs should be waterproof to ensure that there is no water seepage downstairs before construction. After the waterway reconstruction, the suppression experiment should be done well. The fireman reminded me to use the suppression machine to hit 6 to 8 atmospheres for 30 minutes without leakage. It is best to have a property on the scene to suppress the test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link. To sum up, through the above introduction, I hope you have a general understanding of hydropower transformation after reading it. Also, after we finally lay the kitchen and bathroom floor tiles, we should check the water to see if the floor drain is unobstructed (the drainage speed after removing the upper cover of the floor drain shall prevail, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing. All right, that's it. If you think the answer is ok, give it a compliment.