What is the correct method of steel binding?
1, steel bars shall be bound in strict accordance with the requirements of the drawings. Pay attention to the accurate spacing and location of steel bars and firm binding points. The intersection points of two rows of steel bars near the periphery of plate and wall steel mesh should be fastened completely, and the intersection points in the middle part can be fastened alternately, but the stressed steel bars should not be displaced; Two-way reinforced intersection should all be fastened.

2. In order to ensure the correct position of floor steel bar, φ 14 steel bar brackets are set between two layers of steel bar, and the spacing is not more than 1000m (4 pieces /m2 are required) to ensure the correct position of steel bar.

Extended data;

The bottom cushion block of beam reinforcement should be placed on the beam bottom plate before beam reinforcement binding, and the edge reinforcement cushion block should be padded with lead wire with mortar cushion block according to the specified protective layer thickness after beam reinforcement binding. Cap 100, slab wall 15, beam and column 25, floor reinforcement 50, ground below gluten 25, and ground inside external wall 35 15.

Stirrup joints should be staggered and tied together with two vertical steel bars, with the stirrup joints of cantilever beam below, and other practices are the same as those of columns. The external angles of beam main reinforcement and stirrup should be all bound, and the rest can be bound at plum blossom point.