With the popularization of legal knowledge, the binding force of contracts on us cannot be ignored. Contracts are a very important factor in the development of enterprises. So how to write a detailed contract? In order to make the writing process easier and more convenient for you, let’s refer to how it is written! Let’s share with you about the maintenance agreement, welcome to read!
Maintenance Agreement 1
Party A: ____________________ Party B: ______ _______
Party B accepts Party A’s entrustment. In order to ensure the normal use of Party A’s electric single-girder crane equipment, Party B will In order to protect the legitimate rights and interests of Party A and Party B, in accordance with the "Contract Law of the People's Republic of China", Party A and Party B signed this agreement through friendly negotiation. Before signing the agreement for the first time, the equipment should be in normal operation before signing the agreement.
Article 1 Obligations of Party B
1. Party B shall give priority to arrange on-site maintenance according to Party A’s agreement on equipment failure notification. Party B will arrive at the scene within 8 hours.
2. Party B does not charge door-to-door fees and labor time fees for door-to-door maintenance.
3. There is no limit on the number of Party B’s home repairs.
4. Party B only charges spare parts fees for repairs, and ensures that the spare parts fees are the same as or lower than the manufacturer's unified price.
5. The replacement parts provided by Party B to Party A must be original parts. If there are special circumstances, Party B must replace parts with similar application functions and technical specifications to the original parts after consultation and approval with Party A.
6. If the parts replaced by Party B for Party A are damaged within the three-month warranty period, Party B shall replace and repair them for Party A free of charge.
7. Party B shall formulate an equipment maintenance plan based on the conditions of Party A’s contracted equipment and report it to Party A. In the absence of Party A's notice of repair, Party B shall carry out on-site maintenance of Party A's contracted equipment according to the maintenance plan. Under normal circumstances, on-site maintenance services are provided every four months.
Article 2 Obligations of Party A
1. Party A shall notify Party B in a timely manner after the agreed equipment fails.
2. Party A cannot use non-original spare parts and consumables that have not been approved by Party B, otherwise Party B will not be held responsible for equipment failure.
3. Without Party B’s approval, Party A shall not invite third-party units to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
4. Party A shall not dismantle the contract equipment without permission, otherwise Party A shall bear all losses caused.
5. When the agreed equipment contract breaks down and parts need to be replaced, Party A shall bear the cost of the parts.
6. When the agreed equipment is transferred or transferred, Party A shall notify Party B in a timely manner.
Article 3 Settlement Amount and Method
1. Party A shall calculate the maintenance fee *** based on ___ year__ as the unit time, the number of equipment and the number of units as __ One-time maintenance fee of RMB 10,020______ shall be paid to Party B within one week after the agreement is signed and becomes effective.
2. Since the quantity and model of repair parts are uncertain, Party A shall pay the maintenance fee to Party B based on the actual amount of repair parts incurred per unit time. Payment is due within 1 week after each completion.
Party A (seal): _______ ________ Party B (seal)
Legal representative (signature): ________Legal representative (signature): _______
_________year_______month_______day_______year_______month_______day
Maintenance Agreement 2
Party A (full name):
Party B (full name):
Party A and Party B shall, in accordance with the "Construction Law of the People's Republic of China", "Construction Project Quality Management Regulations" and "Housing Construction Project Quality Warranty Measures" , contracting the maintenance of commercial and residential buildings and horizontal resettlement houses in Yining Xincun, Ningxiang Economic Development Zone to Party B and reaching the following points:
1. Maintenance project content and requirements
1 . After Party B receives the maintenance contact form from Party A or the community property company, if conditions permit, it will organize personnel or equipment to carry out maintenance within 1 day. After the repair is completed, Party A and the property company will be invited to jointly check and accept, and form a Acceptance documents are used for settlement.
2. For repairs for customers who have already moved in, the customer is required to sign for confirmation after the repairs are completed.
3. If Party B does not send someone to repair within the agreed period, Party A can entrust others to repair.
4. In the event of an emergency repair accident, Party B shall immediately arrive at the accident site for emergency repairs after receiving notification of the accident.
2. Scope and Content of Project Quality Warranty
Party B will carry out warranty on the repaired project in accordance with relevant regulations. During the quality warranty period, Party B shall comply with the management provisions of relevant laws, regulations and rules and The two parties agreed to undertake the quality warranty responsibility for the repaired projects, and implemented them in accordance with the "Quality Warranty Measures for Housing Construction Projects" of the Ministry of Construction and agreed that the quality warranty period for the repaired projects (at the same location) is as follows:
1. Roof waterproofing project , the leakage prevention period for bathrooms, houses and exterior walls with waterproofing requirements is 5 years;
3. The decoration project is 2 years;
4. Electrical pipelines, water supply and drainage pipes , the equipment installation project lasts for 2 years;
5. The heating and cooling system has two heating periods and cooling periods;
6. Water supply and drainage facilities in residential communities, The warranty period for roads and other supporting projects is 2 years;
7. The warranty period for other projects is as follows:
The quality warranty period is calculated from the date of project acceptance.
3. Rights and obligations of Party A and Party B
(1) Rights and obligations of Party A
1. Cooperation by Party A’s engineer*** During construction, Party B shall exercise its powers as stipulated in the contract and issue instructions and visas to Party B to ensure the smooth progress of the project.
2. Determine the construction scope on site and verify the project quantities.
3. Organize relevant units to conduct acceptance inspection and assess quality standards.
4. Pay the project price according to the time limit stipulated in the contract.
5. Responsible for the relationship coordination between various departments.
(2) Rights and obligations of Party B
1. Provide relevant construction plans.
2. Carry out construction management according to building regulations, and construct in strict accordance with the established plan and construction operation specifications to ensure project quality.
3. Pay close attention to production safety and strictly prevent accidents. Party B will be responsible for the losses and impacts caused by safety accidents or liability accidents.
4. The environment must be kept neat and clean after daily completion.
4. Maintenance pricing and payment
Maintenance is priced separately for each location. The cost is determined by Party A in conjunction with the property owner based on market conditions, and is settled monthly after summary. , 5% will be reserved as a quality deposit, which will be paid after passing the re-examination one month after acceptance.
5. Maintenance costs
Maintenance costs shall be borne by the party responsible for the quality defect.
6. Liability for breach of contract
Party A and Party B must strictly perform all the terms of the contract and shall not breach the contract. Otherwise, the other party has the right to pursue its liability for breach of contract and impose a penalty of 10% of the total project price. % as liquidated damages.
The following situations are breach of contract:
1. Failure to construct according to the prescribed plan and quality standards, resulting in poor quality.
2. Failure to complete the project tasks within the specified time limit.
3. On-site management was chaotic and was criticized and punished by relevant functional departments.
7. This contract is made in triplicate, with two copies for Party A and one for Party B. It will take effect when signed or sealed by both parties. The project will terminate automatically after it is fully completed and accepted and the project payment accounts are settled.
Contractor (official seal): Contractor (signature):
Legal representative (signature): ID number:
Authorized agent (signature) :
__year__month__day
Maintenance Agreement 3
Party A (customer): Party B (customer):
Correspondence address (postal code): Correspondence address (postal code):
Contact person: E-mail: Contact person: Telephone: Fax: Telephone: Fax:
__ Equipment The center is a large-scale formal service provider integrating wholesale and retail of office equipment, repair and maintenance, and supply of consumables. In order to make your work progress more smoothly and conveniently, we provide you with effective logistical support. Our commitment: serve you wholeheartedly and bring you the best, fastest and most satisfactory service. The latest maintenance agreement template. The latest maintenance agreement template.
1. Determination before both parties sign the contract
Before signing the contract, both parties must jointly confirm the status of the equipment to be repaired/maintained and register it. Party B needs to check the integrity of the main components of the warranty equipment and the integrity of the accessories, register the machine model, overall condition and other relevant information, and establish customer files.
2. Party A’s rights and obligations
1. Party A shall promptly notify Party B after the office equipment included in this agreement fails, and truthfully inform Party B of the failure. , to assist Party B’s maintenance personnel to make correct judgments.
2. When Party A decides to repair the faulty machine, the cost of replacing parts shall be borne by Party A
The quotation provided by Party B is for Party A’s reference and confirmation. The price of the parts in the quotation shall not be high. The price of parts provided by the manufacturer of the equipment at an authorized repair center in this city.
3. Party B will not be responsible for damage to machines and accessories caused by Party A’s unauthorized repairs or purchase and use of non-original consumables and accessories from outside parties. Party A will not be responsible for parts that have been worn and should be replaced if Party A insists on Party B is not responsible for the damage to the machine and accessories caused by use. Latest Maintenance Agreement Template Contract Template.
4. Party A shall not replace or hire a third party to replace or dismantle machine parts without the consent of Party B. Party B shall have the right to unconditionally and unilaterally terminate the contract upon discovery.
5. For items within the original manufacturer’s warranty period (including extended services purchased from the original manufacturer), Party A may perform maintenance according to the provisions in the original warranty card.
6. If Party A needs Party B to provide other technical support (such as equipment installation, use and simple maintenance, basic knowledge training, assistance in long-distance relocation of equipment in this city, installation and debugging, etc.), Party B needs to be notified 2 days in advance.
3. Rights and Obligations of Party B 1. During the execution of the contract, Party B shall be responsible for providing free repair and maintenance of machines used under normal conditions.
2. During the execution of the contract, Party B guarantees that in the event of machine failure, the service will be in place (no limit on the number of times) within 1 hour after receiving Party A’s maintenance notification, except for national statutory holidays.
3. When Party B receives Party A’s maintenance notice and confirms that the machine needs to be replaced, it will take back the faulty machine for repair without affecting Party A’s normal work. In special circumstances, Party B will be Party A’s Provide backup machine.
4. Party B is obliged to explain each maintenance situation to Party A and provide a list of replacement parts. The price of the parts shall not be higher than that provided by the manufacturer of the equipment at an authorized maintenance center in this city. Part price.
5. During the execution of the contract, after Party B replaces new parts for Party A's machine, if the new parts have problems again, it is a quality problem with the parts themselves. Party B shall be responsible for free repair and replacement; if it is caused by improper use by Party A (not Party A is responsible for any damage to accessories caused by quality issues of the accessories).
6. After the maintenance (part replacement) work is completed, Party B's maintenance personnel shall provide a written report to Party A, and both parties shall sign to confirm that the fault has been repaired. Latest maintenance agreement template Latest maintenance agreement template.
7. During the execution of the contract, Party B, in addition to performing the manufacturer's standard warranty services, can provide Party A with the newly purchased office equipment (copiers, printers, fax machines, all-in-one machines, etc.) Technical support and required extended services (such as equipment installation, use and simple maintenance, basic knowledge training, assistance with long-distance relocation of equipment in this city, installation and commissioning, etc.).
4. Payment and payment methods
Annual maintenance payment categories:
Category A: Party B conducts comprehensive maintenance of Party A’s office equipment every month , the annual service fee is yuan, capitalized: RMB yuan.
Category B: When Party A’s office equipment breaks down or needs maintenance, () Party B provides door-to-door service with no limit on the number of times. The annual service fee is RMB, capitalized: RMB.
Payment method: One-time payment within one week from the date of signing the contract, cash check
5. Dispute Resolution
The contract is signed by Party A and Party B It will take effect after being stamped and binding on both parties. If one party fails to perform the contract, the other party can directly file a lawsuit with the local court.
6. Termination and breach of contract
1. This contract will be terminated on its own after expiration. If Party A needs Party B to continue its services, it should renew the contract within one month after the expiration of the contract.
2. Latest maintenance agreement template contract template for breach of contract. Party A notifies Party B to go for maintenance. If Party B fails to perform maintenance as scheduled more than three times without reason, Party A has the right to terminate the contract and require Party B to return the remaining contract payment. (Refund of contract payment = 〈Contract fee/12〉Ⅹmonths not served).
7. This contract shall take effect from the date of signing and sealing by all parties
This contract is made in two copies, with Party A and Party B each holding one copy, which shall be equally valid. Other undisclosed matters shall be resolved through negotiation between the two parties in a reasonable and fair manner.
8. Supplementary Provisions:
9. Supplementary Table:
Machine model
Number of copies
Maintenance Agreement 4
Party A: Contact number of Liu Jiangnan, the person in charge of the school (hereinafter referred to as Party A):
Party B: Liu Yongbing (hereinafter referred to as Party B) contact number:
< p> 1. Party A agrees to entrust Party B with the maintenance of the 22 large bungalows (including all teacher and student dormitories and kitchens) of Huahebian Primary School in addition to the teaching building.2. Party B is responsible for all the stringer, wooden, brick and tile materials and construction required for all repairs.
3. Maintenance time is from May 2 to June 30, 20__.
4. Maintenance requirements: rotten wooden stringers must be replaced, house leaks must be re-inspected, ditch tiles and debris must be cleaned, all hidden dangers of the wooden stringers in the house must be eliminated, and wall tiles with serious nitrification must be replaced. The roof does not leak.
5. The maintenance fee is 600 yuan per room, totaling 13,200 yuan, to be paid in three installments. The first payment was 4,400 yuan. That is the initial acceptance period of completing the maintenance work. The second payment is 4,400 yuan at the end of the semester. Visual inspection meets quality requirements. The third payment of 4,400 yuan will be made after one school year and passed the rainy season inspection in the following year. It will be paid off before the end of July 20__. Quality acceptance is carried out in three stages. If it is found that a certain place does not meet the quality requirements, Party A requires resumption of work. If work cannot be resumed, Party A has the right to deduct corresponding expenses from the maintenance fee.
6. If Party A regrets and chooses another person to repair the work after signing the contract, it will be a breach of contract by Party A. Party A pays 1,000 yuan to Party B. After the contract is signed, if Party B regrets that it does not perform maintenance on schedule or does not undertake maintenance (due to the large amount of contracted other projects), which affects Party A's normal work and life, it will be a breach of contract by Party B, and Party B will pay liquidated damages of 1,000 yuan to Party A.
7. Party B is responsible for construction safety.
8. Other matters not covered shall be resolved through friendly negotiation between the two parties. (Voluntary Stock Withdrawal Agreement)
9. This contract will come into effect after negotiation and signature by both parties A and B. The contract is made in triplicate. Each party will hold one copy and submit one copy to the central school for record.
Party A’s signature:
Owner B’s signature:
April 25, 20__
Maintenance Agreement 5
Party A: __________________
Party B: __________________
Based on the principle of mutual benefit, Party A and Party B have signed the following office equipment maintenance/repair agreement through friendly negotiation.
1. The total amount of service fees in this agreement is: (uppercase) RMB___________ yuan, (lowercase) RMB___________.
1. The service object’s office equipment model is _________. (Copier/printer/fax machine/scanner products)
2. Before Party A and Party B sign the contract, Party B shall conduct a free comprehensive inspection of the office equipment included in the service objects of this agreement to confirm that the equipment operation status and provide detailed detection reports. It must be signed and confirmed by both parties. If a fault is found and parts need to be replaced, the cost of the parts will be borne by Party A. Party B is responsible for providing a quotation for Party A’s reference, but the price of the parts in the quotation shall not be higher than the price of the parts authorized by the manufacturer of the equipment in this city. Repair (service) center parts prices.
2. Regular maintenance of office equipment
1. Location: Party B’s on-site maintenance location is the location where the office equipment is used as included in the agreement.
2. Period: Fax machines and copiers are maintained once a month, and printers and scanners are maintained quarterly. Latest maintenance agreement template Latest maintenance agreement template.
3. Maintenance report: Each time Party B provides maintenance services to Party A, Party B must fill in a maintenance call report on site to truthfully reflect the operation of the office equipment, and it must be signed and confirmed by both parties.
4. Hidden faults: If Party B discovers hidden faults when providing office equipment maintenance for Party A and needs to repair or replace parts, Party B needs to negotiate with Party A, and Party A decides whether to repair or replace them. part.
3. Temporary emergency maintenance of office equipment
1. Location: Party B’s on-site maintenance location is the location where the office equipment is used as included in the agreement.
2. Time:
(1) 9:00 to 17:30 every Monday to Friday (excluding holidays and holidays) is the standard time for Party B to implement this Agreement. Within 4 working hours after Party A calls for maintenance, technicians will be sent to the door to perform free maintenance on the annual warranty machine signed by this agreement (if parts need to be replaced, the parts fee will be charged separately), regardless of the number of times.
(2) If Party A requires Party B to perform maintenance work outside of standard working hours, Party A must notify Party B in advance during working hours from Monday to Friday. Otherwise, Party B has the right to reject Party A's request. .
3. When the office equipment covered by this agreement fails, Party B must be notified promptly, and the failure shall be truthfully informed to Party B to assist Party B's maintenance personnel to make correct judgments.
4. After Party A notifies the fault, Party B shall come to provide maintenance within the standard time. If there are special circumstances, Party B shall promptly notify Party A.
5. When Party A’s office equipment fails seriously and Party B cannot repair it within two days, Party B shall provide Party A with a free backup machine during the maintenance period
6. Party A has not obtained any Agree that maintenance should not be performed by yourself or by a third party (equipment supplier or direct agent) without the written consent of Party B. Latest maintenance agreement template contract template.
7. Replacement of parts:
(1) The replacement of parts may affect the function and performance of the office equipment, and Party B must negotiate and agree with Party A before proceeding.
(2) The replacement parts provided by Party B to Party A must be original parts of the same brand as the equipment. If there are special circumstances, Party B must negotiate and agree with Party A to replace them with the same functions and technologies as the original parts. Components with similar indicators.
(3) The cost of replacing parts shall be borne by Party A. Party B is obliged to provide a quotation for the parts for Party A’s reference and confirmation. The price of the parts in the quotation shall not be higher than the price of the parts authorized by the manufacturer of the equipment in this city. Prices for parts provided by repair (service) centers. Party A may purchase components from a third party (equipment supplier or direct agent) confirmed in writing by Party B.
(4) Party A shall not replace or hire a third party to replace or dismantle parts without Party B’s written consent without Party B’s consent.
8. If the parts that Party B replaces for Party A are not damaged artificially during the warranty period, Party B must replace and repair them for Party A free of charge. If it is caused by improper use or human damage by Party A, Party A will be responsible for the cost of parts. (Parts warranty period is: two months from the time of replacement of this part. Note: Consumables such as needles, coils, ink cartridges, nozzles, iron powder, toner, exposure lamps, toner cartridges, ribbons, and computer software are not covered by this warranty. . )
9. Written report: After the repair (part replacement) work is completed, Party B's maintenance personnel shall provide a written report to Party A, and both parties shall sign to confirm that the fault has been repaired.
10. For the employment of a third party, both parties must obtain the written approval of the other party and use an authorized third party (product supplier or direct agent) to perform Party B’s relevant obligations in this agreement. Otherwise, The unnotified party has the right to unilaterally stop the execution of this agreement.
11. No warranty scope
(1) Damage caused by force majeure factors such as natural disasters and man-made disasters. Latest maintenance agreement template. Latest maintenance agreement template.
(2) Damage caused by repair without Party B’s consent or hiring a third party.
12. This agreement does not involve related software or network support services.
13. If the parts repaired by Party B have the same fault as before during the specified warranty period and it is not man-made damage, Party B shall repair the fault free of charge. If it is caused by improper use or man-made damage by Party A, , the maintenance costs shall be borne by Party A. (For details of the component warranty period and warranty content, please refer to Section 8 of Point 3 of this Agreement)
4. Confidentiality
1. Both parties agree that the information they learned during the execution of this contract will be The relevant content and data or information are confirmed to be confidential.
2. Both parties are responsible for ensuring that their employees and employed third parties strictly abide by confidentiality obligations.
3. Party A is solely responsible for its proprietary and confidential information.
5. Effectiveness and term of the agreement
This agreement will take effect after it is signed and sealed by Party A and Party B. The term of the agreement is from _________year_______month_______to_ _________year_______month_______day.
6. Payment method
1. Party A shall pay Party B the full amount of the agreement within ten days from the date of signing this agreement.
2. The cost of daily maintenance of equipment shall be paid to Party B in one lump sum within ten days after the maintenance is completed.
7. Termination of the Agreement and Penalties
1. If the following circumstances occur, Party A and Party B have the right to unilaterally terminate this Agreement immediately
Product Friends Interactive
(1) Without special reasons, one of Party A and Party B fails to perform its obligations under this contract. Latest maintenance agreement template contract template.
(2) Replacement of office equipment parts without Party A’s consent.
(3) When replacing parts, if non-original brand/or counterfeit parts are replaced without the consent of Party A, Party B will refund the cost of parts paid by Party A and replace the original brand parts free of charge. If the equipment is damaged, Party B shall compensate according to the market price.
(4) When reselling or transferring office equipment due to Party A’s reasons, the office equipment will be moved out of the building without Party B’s consent and continue to require services.
(5) Default in payment to Party B without Party B’s consent.
2. Party A’s breach of contract leads to the termination of this agreement, and Party B will not refund the balance of the agreement.
8. This agreement is made in two copies, with Party A and Party B each holding one copy. Unspecified matters shall be resolved through negotiation between the two parties.
Party A (seal): _________ Party B (seal): _________
Representative (signature): ________ Representative (signature): _________
Address: _______________ Address: _______________
Telephone: _______________ Telephone: _______________
Fax: _______________ Fax: _______________
Contact person: ______________ Contact person: _______________
_________year____month____day_______year____month____day
Practical template of maintenance agreement 5 Related articles:
★ 5 practical equipment maintenance service contract templates
★ Practical template about warranty agreement
★ About automobile maintenance agreement template
★ House Maintenance Contract Agreement
★ 5 practical after-sales service contract templates
★ 5 practical equipment maintenance contract templates
★ Simple house maintenance agreement template< /p>
★ 5 Equipment Maintenance Service Contract Templates
★ The latest version of Equipment Maintenance Contract Template