Current location - Quotes Website - Personality signature - How to fill in the electrical operation ticket?
How to fill in the electrical operation ticket?

Basic requirements for filling in the work ticket:

Every item listed on the work ticket must be filled in carefully, the signatures are in place, and the time is correct. The measures to be filled in on the work ticket must be specific, and the content filled in by the issuer must not be copied. Do not carry out work beyond the tasks listed on the work ticket or work without tickets.

Filling in the work ticket

1. The issuer of the work ticket or the squad leader determines the person in charge based on the work tasks.

2. The issuer of the work ticket or the person in charge of the work fills in the work ticket correctly. The issuer of the work ticket signs after checking it correctly. The work ticket must be in duplicate, uniformly numbered, and clearly written. The work content and working location must be accurate, and safety measures must comply with regulations and on-site requirements.

3. Filling in the work ticket should meet the following requirements:

1) The face of the work ticket should be clearly written. When a clerical error occurs, two parallel lines can be drawn on the typo to indicate that it will be invalidated and continue. fill in. However, various equipment numbers, the number of ground wire groups, and working hours cannot be modified.

2) The signatures of the person in charge of the work (guardian), the issuer of the work ticket, the person in charge of duty, and the work permit holder listed on the work ticket should all be signed by themselves, and signing on behalf of others is strictly prohibited.

3) The planned working time of the work ticket is limited to the maintenance period approved by the dispatcher. If the work is postponed for any reason, the work ticket should be filled in again.

4) Changes in work leaders and work team members should be carried out in accordance with the "Safety Regulations".