Industrial land treatment process
Materials required:

1. Application Report (original and A4 paper)

2. Construction land planning permit (one original and one copy of A4 paper)

3. Business license and enterprise code certificate (check the original and save two copies on A4 paper) (limited to the land used by the unit)

4. Identity certificate of the legal representative (2 originals) (limited to the land used by the unit) (provided by the service hall of this bureau, filled in and stamped by the applicant)

5. ID card of the legal representative (check the original and save two copies of A4 paper) (limited to the unit applying for land use)

6. Agent's ID card (check the original and save two copies on A4 paper) (entrusted only)

7. Power of attorney (two originals) (provided by the service hall of this bureau, filled in and sealed by the applicant) (entrusted only)

8 project approval (original) or the minutes of the government executive meeting after verification (copy of A4 paper)

9. Project feasibility report and approval (original)

10. Credit certificate (original)

1 1. Project Layout (Original)

12. Opinions of environmental protection, forestry and fire department (original)

13. Red line map of land use (two originals issued by the Information Center of this bureau, one original and one copy issued by the Planning Bureau)

14. land registration approval form for cadastral survey (original) (provided to the applicant by the service hall of this bureau, no need to fill in, just sign the name of the agent at the "signature of the land owner" on page 4).

15. Written opinions from other departments to be provided.

Processing flow:

1. The applicant goes to the service hall of our bureau to get the relevant forms and then goes to the information center to draw the red line map of construction land;

2. After preparing the materials, submit the application to the service hall of the Bureau of Land and Resources.

Extended data:

Audit requirements:

(A) the intensity of investment

The minimum investment intensity of industrial land is: 6,543,800 yuan+10,000 square meters.

(2) Credit certificate

1. The credit certificate shall not be lower than the above investment intensity standard.

2. If a bank issues more than two (including two) credit certificates, they must be different account numbers.

3. If multiple banks issue credit certificates, it must be the same day.

(3) Provisions on land use for supporting facilities of industrial projects

1. The land for industrial projects must clearly specify four indicators: investment intensity, floor area ratio, building density, and the proportion of land for administrative office and living service facilities. The investment intensity and floor area ratio of different industries can be different, and the building density cannot be lower than 30%.

2. The supporting land area of administrative office and living service facilities required for industrial projects shall not exceed 7% of the total land area. It is strictly forbidden to build a set of non-productive supporting facilities such as aristocratic main building, expert building, shopping mall, hotel, guest house and training center in disguised form within the scope of industrial projects.

3. Encourage the construction of multi-storey standard factory buildings, strictly control the greening rate of factory areas, and prohibit the construction of "garden-style factories".

References:

Industrial land approval process-Huizhou Huicheng District People's Government Network