Fence construction contract
With the popularization of legal knowledge, there are more and more types of contracts, and signing contracts can effectively restrain breach of contract. There are many points for attention in drafting the contract. Are you sure you can write it? The following is the fence construction contract template (5 selected articles) that I compiled for you. Welcome to reading. I hope you will like it.

Fence fence construction contract 1 Party A: _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Party B: _ _ _ _ _ _ _ (hereinafter referred to as Party B)

Since the installation of protective fence involves aerial work, which is dangerous, in order to prevent the occurrence of safety accidents and ensure personal safety, Party A and Party B sign this agreement on the basis of voluntariness and equality and on the basis of relevant national laws, regulations and relevant regulations through full consultation.

Article 1 General situation of the project

The fence installed by Party A is designated as _ _ _ _ _ _ _ _.

Article 2 Contract Methods and Valuation Basis

Party B shall be responsible for all materials used for the fence and the installation and implementation of the fence. The materials designated by Party A are _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3 Safety requirements

3. 1 During the construction period, Party B shall inspect the safety technical facilities and tools used for working at heights by itself, and voluntarily bear all safety risks during the construction period.

3.2 In the process of construction, if Party B finds defects or hidden dangers, it must solve them in time; When personal safety is endangered, the operation must be stopped quickly.

3.3 Party B shall bear all corresponding responsibilities for the safety accidents in the construction process.

Article 4 Method of payment for project funds

Party A shall pay a deposit of RMB _ _ _ _ _ _ _ _ Yuan to Party B.

Article 5 Party A's responsibilities

5. 1 Check and supervise the project quality according to the actual situation of the project.

5.2 Before Party B enters the work site, Party A shall provide safety education to Party B's personnel.

Article 6 Quality Assurance

6. 1 stainless steel guardrail column spacing shall not be greater than _ _ _ _ cm.

6.2 Complete this project according to the acceptance specifications and technical standards of building envelope engineering. The warranty period is _ _ _ _ _ years, and Party B shall ensure that the safety doors and windows will not fall under the condition that there is no external force or the external force is less than _ _ _ _ _ _, otherwise Party B shall bear all safety responsibilities caused by the falling of the protective fence.

Article 7 Others

7. 1 This contract is made in duplicate, with each party holding one copy.

7.2 This contract shall come into effect after being signed by the legal representatives (responsible persons) of both parties, and shall automatically become invalid after the warranty period expires.

Date of conclusion of the contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Party A: _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _

(Signature) _ _ _ _ _ _ _

(Signature) _ _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Tel: _ _ _ _ _ _

Fence Construction Contract 2 Party A:

Party B:

Since the installation of protective fence involves aerial work, which is dangerous, in order to prevent the occurrence of safety accidents and ensure personal safety, Party A and Party B sign this agreement on the basis of voluntariness and equality and on the basis of relevant national laws, regulations and relevant regulations through full consultation.

Article 1: Project Overview

The fence installed by Party A includes four windows downstairs (including one bedroom, one study, one dining room and one kitchen) and one inner fence door and window upstairs.

Article 2: Contract Method and Valuation Basis

Party B shall be responsible for all materials used for the fence and the installation and implementation of the fence. The material designated by Party A is 0.8 mm thick stainless steel pipe .. The fixed-price installation is calculated according to the 80 yuan per square meter, and the total price is calculated according to the specific implementation area and the corresponding discount method.

Article 3: Safety requirements

3. 1 During the construction period, Party B shall inspect the safety technical facilities and tools used for working at heights by itself, and voluntarily bear all safety risks during the construction period.

3.2 In the process of construction, if Party B finds defects or hidden dangers, it must solve them in time; When personal safety is endangered, the operation must be stopped quickly.

3.3 Party B shall bear all corresponding responsibilities for the safety accidents in the construction process.

Article 4: Payment method of project funds

Party A shall pay 400 yuan RMB deposit to Party B, and the rest of the project funds shall be settled after the fence is installed.

Article 5: Party A's responsibilities

5. 1 Check and supervise the project quality according to the actual situation of the project.

5.2 Before Party B enters the work site, Party A shall provide safety education to Party B's personnel.

Article 6: Quality Assurance

6. 1 stainless steel guardrail column spacing shall not be greater than12cm.

6.2 Complete this project according to the acceptance specifications and technical standards of building envelope engineering. The warranty period is 50 years, and Party B shall ensure that the safety doors and windows will not fall off without external force or the external force is less than 100 kg, otherwise Party B shall bear all safety responsibilities caused by the fall of the fence.

Article 7: Others

7. 1 This contract is made in duplicate, with each party holding one copy.

7.2 This contract shall come into effect after being signed by the legal representatives (responsible persons) of both parties, and shall automatically become invalid after the warranty period expires.

Date of conclusion of the contract: year month day.

Party A: Party B:

(signature) (signature)

Legal representative:

Tel: Tel:

Fence Construction Contract 3 Party A:

Party B:

Party A and Party B, in accordance with the relevant provisions of the Economic Contract of the People's Republic of China and on the principle of equality and mutual benefit, have reached the following agreement on Party B's contracting of Party A's project through friendly negotiation for common compliance.

2. If the drawings and Party A's requirements are changed, the site completion shall be settled separately according to the actual amount.

Three. Scope of work: Party B is responsible for the production and installation of samples provided by Party A to ensure the quality of the project.

Four. Delivery and installation period: the goods will be produced immediately after the contract is signed, with good quality and quantity, and the goods will be installed on the construction site.

Verb (abbreviation of verb) settlement method: After the contract is signed, Party A will pay 70% of the installation progress payment to Party B after 50% of the total project installation amount is confirmed by the person in charge of Party A's project department. After the project is completed, Party A will pay 70% of the remaining project funds to Party B. After the project is accepted by the person in charge of Party A's project department, it will be summarized and calculated, and Party A will pay all the balance in one lump sum.

Liability for breach of contract of intransitive verbs: This contract has legal effect once it is signed, and both parties shall strictly abide by it. Either party shall not terminate or terminate the contract without authorization. In case of breach of contract, all responsibilities shall be borne by the breaching party. (Please inform Party B of production 10 days in advance according to the project schedule)

Seven, due to natural factors (power failure, wind, rain, etc. ) affect the construction progress of Party B, please forgive Party A, and Party B will not be liable for breach of contract.

VIII. Protection of finished products: After the installation, Party B will not be responsible for the pollution and damage of air-conditioning guardrail caused by human factors.

Nine, all the money in this project does not include tax.

X this contract is made in duplicate, one for each party, and shall come into force after being signed and sealed. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (signature): Party B (signature):

Representative: representative:

Tel: Tel:

Fence Construction Contract 4 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Party B: _ _ _ _ _ _ _ _ _ _ _

In order to ensure Party B to achieve safe production and civilized construction in the process of contracting the project entrusted by Party A, and to clarify the respective safety responsibilities of both parties, this agreement is hereby signed, and * * * shall abide by this agreement and earnestly implement it.

I. Party A's responsibility for production safety:

1. In order to implement the policy of "safety first, prevention first", the construction site must exercise unified leadership over the contractor's production work and supervise the contractor to implement the guidelines, policies, regulations and systems for safety in production.

2. The relevant personnel before entering the construction site safety measures for examination and approval, after being signed by both parties, the contractor shall supervise and inspect the implementation.

3. Party A's safety inspectors conduct safety inspections on Party B's construction site, and have the right to impose economic penalties on illegal command and operators, and put forward rectification requirements within a time limit. Those who refuse to make rectification have the right to order them to stop work for rectification.

4. The safety inspector of Party A has the right to guide and supervise Party B, construction management personnel and safety inspectors, and check the internal information of Party B's safety management.

Two. Safety production responsibilities of Party B's unit:

1. We must conscientiously implement the national guidelines, policies, laws and regulations on safety in production. Party B shall be responsible to Party A, obey the unified leadership of Party A, and provide full-time or part-time safety management personnel according to relevant regulations, and establish and improve the safety management system.

2. The on-site commanders and workers of Party B's unit must be familiar with and implement the regulations of Party A's unit on safety production, fire prevention and civilized construction, and take the initiative to get in touch with the safety department of Party A and actively participate in the safety activities organized by Party A. ..

3. Party B must set up eye-catching safety signs, vehicle bypass signs and safety isolation facilities at the construction site. In case of any safety accident, Party B shall be responsible for it, which has nothing to do with Party A. ..

4. Before construction, Party B shall take the initiative to make technical disclosure on safety and fire prevention to Party A, and sign or seal it for confirmation, and earnestly implement the technical disclosure requirements of Party A's unit on safety and fire prevention, and the construction can only be started after the safety technical measures are in place.

Three, the contract task of inductrial injury accident treatment agreement;

1. Any quality and safety accident caused by Party B's illegal command, illegal operation and disobedience to Party A's command shall be borne by Party B and has nothing to do with Party A. ..

2. When Party B works in the production area contracted by Party A's unit, Party B shall take full responsibility for any accident that hurts Party A's employees or Party B's employees and third parties for any reason and under any conditions, which has nothing to do with Party A. Party B shall take full responsibility for casualties in construction operations, which has nothing to do with Party A. If Party B's personnel are injured or killed on the way to work or during construction, Party B shall take full responsibility, which has nothing to do with Party A. ..

3. This agreement is made in triplicate, one for each party and one for the superior. This agreement shall come into force as of the date of signature and seal by both parties, and the validity period shall be from _ _ _ _ _ _ _ _ _ _.

Person in charge of Party A: _ _ _ _ _ _ _

Person in charge of Party B: _ _ _ _ _ _ _

Tel: _ _ _ _ _ _

Tel: _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Fence Construction Contract 5 Party A:

Party B:

Party A and Party B sign this contract on the basis of equality, voluntariness and full consensus in accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and both parties must strictly abide by it.

A, project name, location and installation:

1, project name: XXX handrail project

2. Project location: XXXXXXXX, Zhenjiang City

3, processing specifications, installation requirements: must be strictly in accordance with the design drawings and related specifications.

4. Specifications and price list:

Remarks:

1), the comprehensive unit price of this contract includes raw material procurement, processing and production, transportation, on-site coordination, on-site installation, on-site cooperation and acceptance, work-grabbing measures, inspection and test (which must meet the inspection requirements of relevant quality supervision departments), secondary handling of materials, construction of water and electricity, maintenance and replacement due to quality problems, finished product protection, general contractor cooperation, scaffolding, vertical transportation, profits, taxes and policy documents. At the time of settlement, it is calculated according to the actually completed quantity (linear meter).

2) The comprehensive unit price of this contract shall be guaranteed at one time and shall not be adjusted.

5. Specifications and installation requirements:

Material requirements: the handrail profile adopts XXXXX brand, and the height and thickness of the handrail are not less than 3.0mm, as shown in the figure.

Production requirements:

Profile processing should be carried out in the workshop, which should have good cleaning conditions; Having equipment and machines suitable for profile processing, and meeting the accuracy requirements; The measuring tools used should meet the measurement accuracy and be used within the validity period of measurement certification. The manufacturer shall cooperate with the quality inspectors of the owner, supervision organization and general contractor to carry out regular and irregular inspections.

Before fabrication, all components shall be checked against the construction drawings of buildings and structures and the physical objects on site, and the existing holes shall be carefully measured to adjust the deviation. The consequences caused by the negligence or mistake of the contractor shall be borne by the contractor.

All materials entering the site must have certificates and test reports before they can be processed. Effective protection measures should be taken for finished products/semi-finished products during processing.

Unqualified materials and unapproved materials shall not be used.

The processing quality must conform to the current quality acceptance specifications, and the visual quality is good, and the inspection lot should be qualified.

6. Commencement and completion dates:

Start time:

Completion time:

Second, the tentative price

The tentative total price of this contract is xx million yuan, which is calculated according to the actual engineering quantity at the time of settlement.

Three. Responsibilities and rights of the parties to the contract

(I) Responsibilities and Rights of Party A

1. Party A shall pay production and installation fees to Party B according to the contract.

2. Party A shall supervise and manage Party B. ..

3. Party A is responsible for coordinating the work of Party B with other three parties.

4. Party A has the right to spot check the processing and installation of Party B. ..

5. Party A is responsible for the acceptance of Party B's materials entering the site, and has the right to transport the unqualified products away from the site.

7. Party A shall provide necessary technical support for Party B's installation.

8. Party A has the right to stop, require rectification, rework, shutdown and other problems arising from Party B's processing, installation and site construction management.

9. After Party B completes the installation, Party A is responsible for the acceptance, and has the right to rectify and rework the unqualified installation requirements until they are qualified, and sign and seal the final acceptance report for confirmation.

(II) Responsibilities and Rights of Party B

1. Party B shall be responsible for the finished product protection after wall installation, and shall be responsible for any deformation, pollution or damage.

2. Party B is responsible for the acceptance of accessories and auxiliary materials, and the losses caused to Party A due to Party B's lax acceptance shall be borne by Party B. ..

2. Party B accepts the supervision and management of Party A. ..

3. Party B shall submit the processing and installation schedule to Party A. ..

4. Party B shall accept Party A's spot check on processing and installation.

5. Party B shall accept the consultation of Party A or the supervisor on product technology, processing and installation at any time.

6. The installation team designated by Party B will be responsible for keeping the goods that have passed the entry experience. During this period, the risk of damage or loss of the goods shall be borne by Party B. ..

7. If the installation period is changed (including in advance) or other special circumstances due to the change of Party A's individual projects, Party B shall give possible support.

8. During the construction period, Party B shall strictly abide by the relevant rules and regulations of Party A and the general contractor, and accept the management of Party A and the supervision unit. During the construction process and before the completion of the project is handed over to Party A, Party B shall be responsible for properly protecting the finished project, and all losses caused thereby shall be borne by Party B. ..

9. After the installation is completed, Party B shall protect the finished product together with the general contractor. If Party B fails to cooperate with the finished product protection as agreed in the contract, resulting in damage, Party B shall be responsible.

10. Submit relevant information and summarize it and hand it over to the general contractor to ensure the completeness of completion data and the smooth acceptance of the project.

Four. Related expenses and payment methods

1, payment method

Payment of processing and installation fees: Before Party B requests Party A to make payment, it must obtain the consent of the general contractor, who shall sign the contract payment form for confirmation. Party A shall pay the corresponding amount to Party B after receiving the contract payment form signed and confirmed by the general contractor. ..

2. The payment method is to pay 30% of the provisional total price for all materials entering the site, 40% of the provisional total price for the completion acceptance conditions, 95% of the total price after the completion acceptance settlement, and keep 5% of the quality deposit, and pay after the quality guarantee expires without quality problems.

The warranty period is one year from the date of completion acceptance. If there are any problems during the warranty period, Party B must fulfill the maintenance responsibilities.

3. When Party B receives the project payment from Party A, it shall provide Party A with the full amount of relevant invoices.

Verb (abbreviation of verb) product quality

1. The profiles, fittings and auxiliary materials selected by Party B must meet the national standards and the technical requirements for processing and installation confirmed by both parties.

2. The processing and installation of Party B must meet the national standards. During the performance of the contract, if new national standards or industry standards are issued and implemented.

3. Before installation, Party B shall prepare inspection reports, inspection reports, production licenses, certificates and other related materials (with official seals) and submit one copy to Party A. In addition, Party A has the right to randomly select them for inspection during acceptance, and the corresponding inspection expenses shall be borne by Party B. ..

4. After processing and installation, no burrs, oil stains or other stains are allowed on the surface. Smooth surface, no obvious color difference, unevenness, scratches, scratches, bumps and other defects.

Six, product packaging

1. Party B shall use reasonable packaging to ensure that the products meet the requirements of normal storage and transportation. Party B is responsible for the product appearance damage caused by packaging problems, such as breakage, scratch, scratch, bump, etc.

2. There will be no extra charge for commodity packaging.

Seven. Mode of delivery

1. Party B is responsible for cargo handling, transportation and insurance during transportation.

2。 After the goods are delivered to the place agreed in the contract, both parties shall conduct acceptance inspection.

Eight, product installation and acceptance

1. Party B promises to arrange the installation team in Xiu Xiu to ensure the installation progress and quality.

2. During the installation period, Party B shall bear the necessary auxiliary materials, and Party A shall not pay any extra fees.

3. Before installation, if the profile is deformed, damaged in appearance or inconsistent with specifications, Party B shall replace it in time.

4. During the installation, Party B must abide by the safety management agreement between Party A and the general contractor. If Party B fails to comply or all kinds of accidents or losses caused to Party A or the general contractor due to Party B's improper operation during installation, Party B shall bear them.

5. After the installation is completed, Party B is responsible for cooperating with the general contractor to check and accept the processing quality and installation quality. On-site acceptance includes product appearance, processing standards and installation requirements. Upon acceptance, the general contractor shall sign and seal the acceptance confirmation document and submit it to Party A. ..

6. If the general contractor has any objection after acceptance, it shall issue a written report to Party B, and Party B shall give a reply within 3 days; Due to shortage or quality problems, Party B shall make up or replace them within 3 days.

7. After receiving Party B's final acceptance report, Party A shall cooperate with relevant technicians to conduct re-inspection and confirm it after it is qualified. If the inspection is unqualified, it shall be implemented according to Clause ② and ③ of Party B's liability for breach of contract in Article 10 of the Contract.

8. The general contractor must ensure the normal construction conditions of Party B. In case of power failure or construction obstruction, the construction period can be extended only after confirmation by the three parties. The delay without the confirmation of the three parties belongs to the personal behavior of the responsible unit.

IX. Maintenance

1. During the warranty period, Party B will carry out maintenance for free. If the damage is caused by Party B, Party B shall bear the relevant expenses.

2. In case of damage caused by processing, quality of materials or accessories, Party B shall replace and repair them free of charge.

3. After Party B leaves the site, if there is a problem that needs maintenance, Party B must arrive at the site for maintenance within 24 hours after receiving the notice from Party A or the property management company entrusted by Party A (not caused by Party B's processing, installation or the quality of the materials themselves, and the related maintenance expenses shall be borne by Party A or the parties concerned), otherwise, it shall be deemed that Party B authorizes Party A or the property management company entrusted by Party A to handle it by itself, and the expenses incurred shall be deducted from the quality guarantee fund.

X. termination of the contract

1. If Party A fails to pay the contract price as agreed in the contract without justifiable reasons and fails to pay within two months after being urged by Party B, which seriously affects the project construction, Party B may unilaterally terminate the contract.

2. Party A has the right to terminate the contract with Party B under the following circumstances.

① Party B fraudulently uses other people's qualifications, or subcontracts or subcontracts the project privately.

(2) Party B fails to enter the construction site in time for installation, and refuses to perform its obligations within the specified time limit after being urged by Party A. ..

(3) Within 3 days after Party B receives the rectification notice from Party A, the same problem still exists or reappears in the future.

(4) Party B refuses to carry out the instructions issued by Party A under this contract.

⑤ Party B fails to process and install the materials designated or confirmed by Party A according to the quality requirements agreed in the contract.

6. The processing and installation quality is unqualified, and it refuses to redo or rework.

After the termination of the contract, Party B shall leave the site unconditionally within 3 days. When Party B withdraws from the site, it must ensure that all items on the current construction site are intact and hand over the sorted construction materials and documents to Party A. ..

XI。 responsibility for breach of contract

1. Party A's liability for breach of contract:

(1) Party A delays the payment of project funds to Party B without justifiable reasons, assumes corresponding liabilities for breach of contract, and pays Party B liquidated damages of two ten thousandths of the daily payable amount.

② During the performance of the contract, if Party A fails to inform Party B of the change of reserved holes in time, Party A shall bear all the losses caused to Party B therefrom. ..

2. Party B's liability for breach of contract:

(1) Party A will directly hold Party B responsible for the quality problems during processing and installation. ..

② If the processing and installation quality of Party B is unqualified, Party B shall compensate Party A for all losses.

(3) If Party B fails to properly protect the finished product as agreed in the contract, it shall be responsible for reinstalling it to meet the requirements, and the increased expenses therefrom shall be borne by Party B. At the same time, Party B shall pay Party A a liquidated damages of twice the amount of the damaged part and bear other losses caused to Party A therefrom. ..

(4) If Party B's installation delay causes losses to Party A, Party B shall bear all the losses.

⑤ If Party B fails to complete the installation according to the date agreed in the contract, Party B shall pay Party A a penalty of RMB xxxx for each day of delay.

6. The processing and installation of Party B must meet the national standards. Failure to meet the requirements of national standards is regarded as breach of contract, and Party A has the right to require Party B to rework or redo until it meets the national standards. Party B shall bear all losses caused thereby and pay 5% of the total contract price to Party A as liquidated damages.

⑦ If Party B is found to have left garbage on the construction site, Party A will inform Party B to complete the cleaning work within the specified time, otherwise Party A has the right to ask a third party to dispose of the garbage, and Party B will bear the corresponding expenses.

⑧ If the contract is terminated due to Party B's responsibility, Party B shall pay Party A a penalty of 65,438+00% of the total contract price, and bear all losses caused to Party A therefrom.

Pet-name ruby Due to the reasons of Party A or the general contractor, if Party B can't work normally, Party B shall apply for an extension in writing, otherwise Party A will not bear relevant responsibilities.

Twelve. Dispute resolution method

Disputes arising from the performance of this contract shall be settled through friendly negotiation; If negotiation fails, bring a lawsuit to the people's court where the project is located.

Thirteen. others

1. This contract shall come into effect as of the date of signing, in sextuplicate, four for Party A and two for Party B, with the same legal effect.

2. This contract shall come into effect after being signed and sealed by both parties.

Date of Contract Signing: Address of Contract Signing:

Party A: Party B:

Legal representative:

Authorized Agent: Authorized Agent:

Company address: Company address:

Bank of deposit: Bank of deposit:

Bank account number: Bank account number:

Tel: Tel:

Fax: Fax:

Postal code: