Current location - Quotes Website - Personality signature - Scaffolding contract
Scaffolding contract
Scaffolding refers to all kinds of supports erected on the construction site for workers to operate and solve vertical and horizontal transportation. The following is the scaffolding contract template I brought you. Welcome to reading.

Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In order to make the project construction go smoothly, ensure the project quality, safety and construction period, and improve the economic interests of enterprises and employees. In accordance with the provisions of relevant laws, in line with the principles of equality, mutual benefit and voluntariness, combined with the actual situation of this project, through friendly negotiation between both parties, Party A contracted the scaffolding sub-project of this project to Party B in the form of cleaning, and in order to clarify the responsibilities and obligations of both parties, the following agreement is hereby concluded:

Article 1 Name and location of the project:

1, project name: XX project.

2. Project location: XX

Article 2 Content and scope of the project:

1, XX scaffold component project construction.

2. Work content: According to the structure of this project, prepare the erection and demolition plan, draw the construction plan, classification report and material plan, and do a good job in the safety protection of enclosure (mixer, entrance and exit, protective shed), stair climbing (ramp) and foundation pit around the house; Scaffolding outside the main body, hole, temporary roof erection, stair erection and demolition, protective shed and limb protection, and isolation net demolition; Scaffolding, safety net enclosure hanging, rotating, dismantling, fittings embedded; Oiling fasteners; Left hand cleaning work, on-site transportation. When the materials used in this type of work come into play, two people shall be assigned to unload the new steel pipe, and the old steel pipe shall be unloaded by itself; Stacked connectors and temporary removal and temporary fixation in the process of exterior wall decoration; Embedding, fixing, welding and cutting of the pull-tab; After demolition, all the materials of this project will be cleaned up and piled up in the place designated by Party A ... Untie the parts, dismantle the safety net and put them into storage, and set up temporary sheds and sheds on site. Including steel bars, carpentry, tool rooms and other operating sheds, not including the erection and dismantling of material hoists, but including the laying of access doors and access plates, not including the painting of new steel pipes, and this work has no point operation.

Article 3 Form of contract: Contract settlement.

Article 4 Contract Fees and Settlement Standards

65438+

(1) salary and bonus.

(2) Various subsidies, such as supper and health care.

(3) Labor insurance benefits, labor insurance supplies, heatstroke prevention drinks, and anti-freezing and heating.

(4) Unproductive employment: including social compulsory employment, meetings, study, training, visiting relatives, etc.

Such as labor and travel expenses, downtime due to climate impact, special downtime, etc.

(5) Recruitment, entry and exit of operation team members, transfer between construction sites and other expenses.

(6) Horizontal transportation of components at the site, loading and unloading of materials within the scope of this type of work.

2. Party B promises that the quality and safety construction period of scaffold project is RMB 3,000 only (submitted before this contract comes into effect). The deposit will be refunded after the end of the subject, without interest.

3. Party B will not pay the living expenses in advance after entering the site. Party A will pay the living expenses according to the amount of work completed each month and approved by the quality, safety and construction management personnel of the project department. The attendance rate of each person per month is not less than 25 days, but the personnel who pay the living expenses must have the certificate of safety officer, have received tertiary education, and have workers with valid badges made by the project department. Otherwise, they will not get paid. Pay 60% of the total price after the main body is capped. When the quality of the project department is reached and the scaffolding is dismantled, all the project funds will be settled within 45 days. The insufficient part shall be paid in advance by Party B. If the salary of each employee or card employee is not paid in time, the interests and reputation of the company will be damaged by complaining to the relevant departments, and a fine of RMB will be imposed each time.

4. If Party B withdraws from the construction midway due to abnormal reasons, the settlement between Party A and Party B shall be calculated according to 50% of the actual completed engineering quantity. According to the actual reasons, decide to refund or confiscate the deposit.

5. The safety helmet, work clothes, raincoat and safety belt required by Party B at the site shall be collected by Party A, and all personnel shall be provided, and the expenses shall be borne by Party B. ..

6. In case of major inspection by the department at the next higher level, this team is responsible for all the work that should be handled urgently within the scope of this type of work. If the responsibility scope with the brother team is not clear, the project department will decide who will clean it up.

Article 5 the construction period standard

Party B must organize enough construction technical force to complete the project ahead of time or on time in strict accordance with Party A's overall sub-project schedule, so as to closely coordinate the work types. If Party B delays the construction period or stops work for no reason, the impact and construction period will be borne by Party B, and Party A will impose a fine of 200 yuan/day on Party B, which will be deducted from the deposit. If the deposit is not enough, it will be deducted from the salary of the month.

Article 6 Quality standards

1, scaffolding, protection and other scaffolding projects must be erected according to the current safety technical specifications for building construction fasteners or steel pipe scaffolding. The construction quality must meet the current "Building Construction Safety Inspection Standard" and the excellent standard of standardized acceptance of the municipal safety supervision station. If the installation does not meet the requirements, it must be reworked and rebuilt, and the expenses arising therefrom shall be borne by Party B. ..

In the case that safety in production, civilized construction, quality and other reasons affect the provincial standardization selection of this project.

The liquidated damages shall be calculated as 10% of the total contract price of Party B, and the on-site construction quality, safety, civilized construction and environmental protection shall be rewarded and punished according to the public security management clauses and systems of the project department.

Article 7 responsibilities of both parties

(I) Party A's responsibilities

1. Fully perform the contract to ensure the normal construction of Party B. ..

2. Take safety construction measures according to the construction plan to ensure the safety production of Party B's laborers and the accommodation of 10 people.

3. Be responsible for the secondary safety education for Party B on site. ..

4, responsible for technical disclosure, acceptance, site construction and deployment; Material procurement.

5. Coordinate the internal and external construction environment and provide various logistics services for Party B's operation.

(II) Party B's responsibilities

1. Strictly implement the rules and regulations of the project department, organize qualified laborers to enter the site for construction according to Party A's construction schedule, and accept the supervision, inspection and guidance of relevant personnel and all walks of life with an open mind (special jobs require certificates). Responsible for maintaining and managing all construction machines and labor protection facilities of this type of work to ensure normal production. Complete the production tasks of Party A's production department on time. When the project department needs Party B's cooperation, it must obey it completely. No additional conditions are allowed.

Party B is responsible for the erection of scaffolding and the inspection and acceptance of safety protection materials. Unqualified materials shall not be used in this project. The fastener loss rate is 1%. Party B shall be responsible for the excess, and Party A will reward the excess according to the market price. The steel pipe has no loss. The loss does not include the damage caused by fastener quality problems and nut slippage.

2, the work between teams and groups must be friendly, cooperate with each other, don't shuffle.

3. Party B's construction personnel are not allowed to visit relatives at the construction site, and no accommodation is arranged at the construction site. In case of special circumstances, it must be approved by the project department, and the safety education of family members should be done well, and children should be closely monitored by their families. It is forbidden to cook in the dormitory and pull the wires without permission. After investigation, the apparatus will be confiscated and fined 100 yuan each time. Any accident shall be borne by Party B. ..

4. If there is any conflict during the construction, report to the person in charge of the site in time to find a solution. It is forbidden to gather people to fight. 500 yuan will be fined every time there is a fight at the construction site, with or without reasons. If it is found that the responsible person participates in or instigates the contractor, the responsible person will be fined one thousand yuan each time. It is forbidden to find a fine of 100 yuan in the construction site or dormitory, and the fine will be deducted from the quality guarantee fund. If the public security organ violates the law, the project department will not bear any responsibility.

5. When laborers enter the site for construction, they must carry out three-level safety education and strictly implement safety rules and regulations. In the event of a safety accident, if it is the responsibility of Party B, the quality and safety deposit will be deducted, and Party B will be responsible for the actual loss of the accident, and at the same time, the responsibility will be investigated according to the severity of the responsibility and heavy punishment measures will be taken. In case of other accidents, Party B shall be responsible for the medical expenses within 1 1,000 yuan, while Party A shall bear 70% and Party B shall bear 30% of the expenses beyond 1 1,000 yuan.

6. Actively cooperate with the quality and safety department of the project department, do a good job of communication, sign safety responsibility letters at all levels in time, and implement the responsibility system for production safety at all levels.

7, safety accidents should immediately organize rescue, and protect the scene, immediately report, it is forbidden to hide the accident.

8. Party B's contractor is the first person responsible for the safety production of this type of work, taking the lead in obeying the law and discipline, strictly prohibiting illegal command, accurately locating safety, quality, progress and benefits, and ensuring that all construction personnel move in all directions.

9. Actively cooperate with the safety knowledge learning, publicity and amateur classes organized by the project department, and implement it to every employee, so as to truly achieve a safety atmosphere of safety first, prevention first and people-oriented.

10. Party B must ensure that the team leader and full-time technical quality and safety inspectors are in place. If it is not in place, the project department has the right to punish 100 yuan/day.

Article 8 Supply of materials and equipment

1 Scaffolding materials shall be purchased by Party A, and Party B shall submit a dosage plan in writing 15 days before use.

2. The machines and tools used for erection and protection shall be provided by Party B. ..

3. Party B shall not waste materials or cut steel pipes at will. Party B shall bear all losses caused by man-made waste of materials.

Article 9 Others

1. Party B must fully and effectively organize on-site construction personnel to meet the progress needs of this project and put an end to subcontracting. In case of subcontracting, Party A has the right to terminate the contract and confiscate the deposit.

2. Party B shall obey the management and command of Party A, implement various rules and regulations of the Project Department and abide by national policies and decrees. When Party B fails to meet the requirements of this agreement due to management confusion, quality and safety, and the construction period fails to meet the requirements of Party A, Party A has the right to unilaterally terminate the agreement and arrange another team for construction. When the agreement is terminated, the settlement shall be terminated according to the amount of advance payment by installments, and the balance and deposit shall be used to make up for the losses of Party A..

3. This agreement shall come into effect after being signed by both parties, and shall be terminated after the completion of this project. This agreement is made in triplicate, two for Party A and one for Party B. Matters not covered shall be implemented according to the relevant regulations of the Project Department, and the above agreements shall be jointly implemented by both parties.

Party A: (Seal) Party B: (Seal)

Representative (signature): Representative (signature):

Date: Year Month Date: