Collect all relevant information in the above steps (recording requirements and approval documents or permission documents provided by the four departments of planning, public security and fire protection, environmental protection, and urban construction archives) as well as the project construction contract contract and the project quality signed by the construction unit Three copies of the warranty letter, construction permit and completion acceptance filing form should be submitted to the Construction Bureau window for filing
1. Materials required for completion acceptance filing of construction projects
The construction unit Within 15 days after the completion acceptance and the acceptance of fire protection, elevators, gas and other projects pass, the following information should be provided to the quality supervision station to go through the completion acceptance filing procedures.
1. Project completion acceptance report;
2. "Construction Permit";
3. Construction drawing design document review opinions;
< p>4. Completion acceptance record form;5. Project quality supervision report;
6. Project completion acceptance application form;
7. Project quality assessment Report;
8. Project survey and design quality inspection report;
9. Project construction safety evaluation report;
10. Relevant quality inspection of municipal infrastructure and functional test data;
11. Planning acceptance approval document;
12. Fire protection acceptance document or permission to use document;
13. Environmental protection acceptance document or Permission to use documents;
14. Elevator acceptance certificate and branch acceptance documents issued by the supervision station;
15. Gas project acceptance documents;
16. Project Quality Warranty;
17. Project Completion Settlement Statement;
18. For commercial housing, a "Residential Quality Guarantee" and a "Residential Instruction Manual" must be provided;
19. Other information stipulated by laws and regulations.
2. For the completion settlement review of the construction project, the following information must be provided to the cost station to handle the procedures
1. If the project is settled based on actual settlement, the following information must be provided:
(1) Letter of authorization from the construction unit and construction unit;
(2) Project category approval letter;
(3) Project construction bid winning notice or project construction contracting approval form;
(4) Project construction contract;
(5) Construction organization design plan;
(6) Drawing review record;
< p>(7) Project construction start report;(8) Concealed project acceptance record;
(9) Project construction schedule;
(10) Project sub-item conversion and material (rebar) table;
(11) Project design change information;
(12) Construction site visa information;
( 13) As-built drawings.
2. If the project is settled at a fixed price (or total cost) agreed between Party A and Party B, the following information must be provided:
(1) Letter of authorization from the construction unit and the construction unit;< /p>
(2) Original project contract;
(3) As-built drawing.
3. Filing procedures:
1. The construction unit shall obtain the "Registration Form for Completion Acceptance of Housing Construction Projects and Municipal Infrastructure Projects" from the filing authority.
2. The construction unit shall submit the "Registration Form for Completion Acceptance of Housing Construction Projects and Municipal Infrastructure Projects" in quadruplicate with the official seal of the unit and signed by the project leader of the unit and the above-mentioned materials to the filing authority for filing. .
3. The filing authority shall sign the filing opinions (seal) on the "Registration Form for Completion Acceptance of Housing Construction Projects and Municipal Infrastructure Projects" within 15 working days after collecting and verifying the filing materials, and the construction unit , the construction unit, the supervision station and the filing authority each hold one copy.