Contractor: (ID card: _ _ _ _ _) (hereinafter referred to as Party B)
Following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the subcontract construction of _ _ _ _ _ _ _ _ _ _.
I. Overview of the Project:
1, project name:
2. Project location:
3, engineering ability:
Second, the way of contracting:
1. This project is contracted by means of non-material contracting.
2. Party A shall timely equip the following machinery and materials according to the construction progress: tower crane, people and goods ladder, gantry, formwork (plywood or wooden board), square timber, jacking timber, gradual tightening and screws.
3. Party B must provide the following materials, machinery and tools: nails, iron wires, steel nails, circular saws and saw blades, hand saws and saw blades, wrenches, hammers, crowbars, weights, strings, spirit level, horizontal hoses, tape measures, red and blue pencils, Mo Dou, safety helmets, safety belts, lighting lamps, power cords and hopper cars.
III. Scope of contract:
1, _ _ _ _ _ _ _ _ Formwork Project: _ _ _ _ _ _ _ Including: walls, columns (including structural columns in masonry), beams (including structural columns in masonry), floors, stairs, elevator shafts, garbage lanes, corridors, balconies, railings and ballasts.
Fourth, the work content:
1. Be familiar with the construction drawings, arrange the job site, collect and return materials and tools, conduct team self-inspection and cooperation inspection, and handle and transport all materials and equipment needed for the whole construction site (including manual transportation, manual transportation or mechanical cooperation transportation, including ultra-long distance transportation and ultra-high transportation, including repeated transshipment) during the whole construction process.
2. Wood formwork manufacturing: complete all the processes of formwork manufacturing, including coating protective agent on new formwork (pine board or plywood), selecting materials, batching, marking, elastic thread, cutting materials, trimming, sewing, nailing wood strips, assembling molds (including making irregular molds and circular molds) and other processes.
3. Installation of wooden formwork: complete all the procedures of formwork installation, including: erection of formwork, erection of support, installation of wall-penetrating screws, sawn timber belts, tie rods, diagonal braces, backing plates, drilling holes, threading iron wires, bolt connection, installation of wooden hoops, nail clips, straightening and leveling, filling gaps in formwork, cleaning up sawdust and sundries of formwork, installation and removal of formwork support and operation support (including superelevation).
4. Dismantling wooden formwork: Dismantling formwork (including superelevation), dismantling recycled supports, portal frames, formwork, square timber, skids, jacking up and down, fastening step by step, iron wires, bolts, skids, wall-penetrating screws, steel pipes, fasteners and other materials. , and transport the recovered materials to the place designated by Party A on the ground for sorting and stacking neatly.
5. After the completion of the whole formwork project, clean up the dry cement and concrete slurry bonded on the formwork, square timber and steel pipe, repair the formwork, pull out the nails on the formwork and square timber, oil the fasteners and fixtures, and transport the materials to the place designated by Party A on the ground and pile them up neatly.
6. Party B shall assist the builder and surveyor in positioning and setting out, and set out elastic lines according to the control axis provided by Party A. ..
7. When tamping concrete, send someone to guard the formwork and reinforce it at any time. If there is expansion concrete or dislocation punch concrete after formwork removal, it shall be chiseled out in time and specially treated according to Party A's requirements. After formwork removal, dry concrete, broken formwork, gap pads and nails shall be thoroughly cleaned, and construction waste shall be packed and transported to the place designated by Party A on the ground.
8. In addition to the above capacity, it also includes other working capacities that are not listed above and should be included in the budget quota and labor quota template project.
9. In case of design change, it shall be settled according to the visa of the construction unit or through negotiation between the two parties.
Verb (abbreviation for verb) Contract price:
1, according to the projected area of each floor, the contract unit price is _ _ _ _ _ _ _ Yuan/㎡.
2. The contract unit price includes lines, roof flower racks, floor-to-ceiling window floating board formwork system and installation costs, and the quantities are no longer calculated.
3. Compared with the current prices of surrounding construction sites, the contract unit price of this contract has a larger profit margin, and the factors of the annual labor price increase are fully considered. The unit price agreed in this contract completely includes the labor, profit, safety, civilized construction and other risk factors that may occur during Party B's construction. During the performance of this contract, neither party will adjust the contract unit price (except for changing the project capacity).
4. Specific expenses not specified in this contract, such as social insurance premium, overtime (including holidays), dinner fee, lost time (including power failure, water cut-off, mechanical failure, shutdown required by government departments, and the influence of climate factors, etc. ), temporary residence permit fees, off-site rent, utilities, transportation fees, etc. , are included in the contract unit price.
5. During the construction, if Party B thinks that the unit price of the contract is low, Party A will not subsidize it, and both parties will terminate the contract. If Party B leaves unconditionally, the quality and safety deposit will not be refunded. Take the workers out for two days, settle their wages, and settle their wages according to 70% of the actual workload.
Six, engineering quantity calculation and engineering cost settlement way:
1. Calculation method of engineering quantity: the projected area is calculated only once for each floor, and the area of the second floor of the bottom plate and cover plate is calculated for the roof pool, but the lines between floors, roof flower racks and window floating plates are not calculated.
2. Settlement method of project cost: project cost = engineering quantity? Comprehensive price.
3. If the formwork installed on the third to fifth floors of the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Seven. Payment terms:
1. The progress payment is paid monthly, only for the main structure of the dismantled formwork. On-site technicians, construction, supervision, and project department shall pay the progress payment after dismantling the main structure of the template, which shall be paid according to 70% of the workload of the project department. After the formwork project is completely completed, 20% will be paid after the acceptance of Party A and the supervisor, and the remaining 10% will be paid in full after the completion acceptance of the project.
2. Party B must provide Party A with a labor remuneration registration form every time it applies for payment. The labor remuneration shall not exceed the progress payment, which shall be paid in advance by Party B, and the labor remuneration shall be paid in advance after being signed by the worker himself and confirmed by the person in charge of Party A. ..
Eight, quality standards and related requirements:
1. quality standard: the quality of this project must reach the qualified level of Unified Standard for Acceptance of Construction Quality of Building Engineering (GB50300-200 1) and Code for Acceptance of Construction Quality of Concrete Structure Engineering (GB50204-2002).
2. Quality acceptance: after each working procedure is completed, self-inspection shall be carried out first, and after inspection by Party A's technicians, it shall be reported to the construction and supervision unit for acceptance. Each acceptance must be passed more than once, and a fine of 200 ~ 500 yuan will be imposed according to the severity.
3. Quality requirements: qualified.
4. If the quality fails to meet the qualified requirements, Party B shall rework it free of charge and rectify it on schedule. If the rectification still fails to meet the qualified requirements, Party A has the right to terminate the contract and the quality and safety deposit will not be refunded. The salary shall be settled according to 70% of the actual workload and compensate Party A for its losses.
Nine, civilized construction requirements:
1, civilized construction, keep the construction site clean and tidy, and clean up the site after work; During the inspection of civilized construction site, Party B must arrange personnel to carry out on-site rectification in time according to Party A's requirements. If the personnel are not arranged for rectification in time, Party A will send other personnel for rectification, and the salary will be deducted from Party B's project payment.
2. During the construction process, no matter what happens, Party B's operators shall not quarrel, fight or block Party A's office with Party A, the owner and relevant cooperation units. If there is any contradiction, it should be solved through normal and reasonable procedures. Party B shall not interfere with the normal work of Party A's personnel for any reason, otherwise, Party A has the right to impose a fine of RMB 6,543,800+100,000 each time.
X. Safety requirements:
1, in strict accordance with the requirements of safety operation procedures, to ensure construction safety and put an end to industrial accidents. In case of accidental casualties caused by Party B during construction, all economic losses and consequences shall be borne by Party B. ..
2. Party B's construction personnel must wear safety helmets when entering the construction site. If they are found to enter the construction site without wearing safety helmets, 50 yuan will be fined every time.
3. Party B's construction personnel must wear work shoes when entering the construction site, and are not allowed to wear work shoes.