Do I have to pass the fire inspection to open a lodging farm?
Yes, because it involves life safety, here are the steps of fire inspection and acceptance, which you can refer to.

Engineering fire control acceptance procedure

1, after the completion of the project, the construction unit shall apply to the public security fire control institutions for fire control acceptance of the project completion, and it can only be put into use after passing the acceptance.

2. After accepting the case, the public security fire control institution shall check whether the information meets the requirements. If it does not meet the requirements, it shall promptly inform the applicant to complete it, and notify the construction unit to make relevant preparations before acceptance 0-2 days before acceptance.

3, according to the provisions of the fire engineering acceptance procedures, by not less than two fire supervisors to the scene for acceptance, to participate in the acceptance of the fire supervisor should be dressing the, wearing a public security fire supervision and inspection certificate, the specific acceptance procedures are as follows:

(1) Introduction of all units involved in the acceptance. The construction unit introduces the general situation of the project and self-inspection, the design unit introduces the design of the fire protection project, the construction unit introduces the construction and commissioning of the project, the supervision unit introduces the project supervision and the testing unit introduces the testing situation.

(2) Organize on-site inspection and acceptance. Acceptance personnel should check and test at the same time, and truthfully fill in the fire acceptance record form.

(3) Summary and acceptance. Each team shall report the acceptance respectively, and make an evaluation according to the Guangdong Provincial Fire Protection Acceptance Evaluation Rules (Trial) formulated by the Corps, and truthfully record the evaluation conclusion in the acceptance record, and put forward preliminary opinions to the construction, construction, design and other participating acceptance units, and timely put forward rectification opinions to the construction unit if it does not meet the requirements of the specification.

4, to participate in the acceptance of the construction, construction and design units to express their opinions or ask questions, fire control institutions acceptance participants should give a reply, can not be answered on the spot should be given instructions.

5, fire engineering acceptance or review, all units to participate in the acceptance of personnel and fire control institutions to participate in the acceptance of personnel to sign the acceptance declaration form.

6. The project acceptance organizer shall fill in the acceptance opinions in time, submit the batch form, organize the acceptance files and send them to the leaders for approval.

7, the construction unit issued a receipt to the window, to retrieve the acceptance opinions;

8. When the acceptance review is unqualified, the construction unit shall organize all relevant units to carry out rectification according to the problems raised in the "Opinions on Fire Control Acceptance of Building Projects", and re-apply to the fire control institution handling the case for re-inspection after rectification. The re-inspection procedure is the same as the application acceptance procedure.

9, the project acceptance is unqualified, the application materials will not be returned. When applying for reinspection, the application materials are the same as the normal application and acceptance materials.

Note: Time limit for supervision and acceptance of engineering fire protection.

Public security fire control institutions shall check the application materials for fire control acceptance upon receiving the application for fire control acceptance from the construction unit. After the information is complete, the fire control acceptance shall be conducted in accordance with the national fire control technical standards within 10, and the Fire Control Acceptance Opinion of Building Engineering (Qualified or Unqualified) shall be issued within 7 days after the fire control acceptance.

The time limit for examination and acceptance is the same as that for normal acceptance.

Main contents and key points of engineering fire control acceptance

Main contents:

1, fire spacing, fire lane, fire water source, etc. The contents related to fire safety in the general layout and layout;

2, the fire risk category and fire resistance rating of the building;

3, building fire and smoke partition and building structure;

4. Safe evacuation and fire elevator;

5, fire water supply and automatic fire extinguishing system;

6, smoke prevention, smoke exhaust and ventilation, air conditioning system;

7, fire power supply and its distribution;

8, fire emergency lighting, emergency broadcast and evacuation signs;

9. Automatic fire alarm system and fire control room;

10, building interior decoration;

1 1, configuration of building fire extinguishers;

12, other contents related to fire safety in national engineering construction standards;

13. Check the valid certificates and supply certificates of fire-fighting products.

Key points of acceptance

1, check whether the completion drawings, materials and the contents of the declaration form for fire control acceptance of construction projects are consistent with the audit opinions of fire control institutions;

2. Check whether the fire protection problems raised in the "Review Opinions on Building Fire Protection Design" have been rectified in the project.

3, check all kinds of fire control facilities, equipment construction and installation quality and performance.

4. Spot check and test the function and linkage of fire control facilities.