1. The designer of the subcontractor does not have the qualification or experience required to sign the design drawings.
2. The subcontractor's designers do not have the necessary insurance to undertake the responsibility of signing the design drawings.
3. The designer of the subcontractor did not have the necessary permission to sign the design drawings.