In daily life and work, more and more occasions need to use agreements, and signing agreements can solve disputes in real life. There are many precautions in the agreement. Are you sure you can write? The following are five security agreements and contracts I collected for you. Welcome to share.

Safety Agreement Contract 1 Party A: Jitong Double Track Project Department of China Railway Fifth Engineering Group Corporation 2 1.

Party B: China Railway 2 1 Team 1 of Jitong Double Track Project Department, No.5 Bureau Group.

According to the management requirements of Jitong Company, combined with the specific situation of our project department in the construction of existing business lines, in order to seriously implement the safety production policy and ensure the office facilities, power, communication, signal optical cable, driving and personal safety of business lines, the following safety management requirements are formulated for Party B to abide by in the construction process:

1. All Party B's personnel involved in the construction of the existing line must be in good health, free from deafness, color blindness, hypertension, heart disease, epilepsy and diseases that hinder the construction work, and shall not employ/kloc-children under 0/8 years old or elderly workers over 50 years old.

2. Personnel engaged in the construction of existing lines must be familiar with the laws, regulations and rules related to traffic safety, and earnestly abide by them.

3. In the construction of existing lines, construction safety protection must be set according to regulations, and the protection personnel must hold relevant certificates after passing the training and examination. Without good construction protection, no construction work can be carried out. Protective spare parts, protective distance, protective signals and other contents must be organized and implemented in accordance with the provisions of the Ministry of Railways on railway technology management, and shall not be changed without authorization.

4. Before starting work, submit the application form and safety evaluation form for dismantling the fence opening and overhead clearance to the Safety, Quality and Environmental Protection Department, and start work only after being examined and approved by the Road Protection Office of Jitong Company. The opening of the fence must be closed after work every day to prevent pedestrians and livestock from going on the road; Immediately after the completion of construction, all existing facilities will be restored.

5. Before entering the construction site, large mechanical equipment for construction must undergo maintenance and be registered in the property department (equipment name, equipment status, copy of operator's certificate and ID card, etc.). ). After entering the construction site, it must be placed outside the existing building clearance, and each equipment must be protected by special personnel during operation. When the protection personnel are insufficient, it is not allowed to enable the equipment.

6. Before the train passes, the personnel working on the existing line must be evacuated to a safe place outside the traffic clearance, and all mechanical equipment and materials should also be evacuated outside the traffic clearance.

7. Construction personnel are not allowed to rest and walk between railings, pillows, roads and two lines, and are not allowed to rob the road. When resting, they must go to a safe place outside the clearance.

8. Scaffolding and other facilities set up in railway construction should be checked frequently, and they should not intrude into the clearance to prevent accidents.

9. The storage point for stacking inflammable and explosive articles should be more than 25m away from the existing buildings.

10. Around temporary houses and facilities, near cliffs, scarps, deep pits, railways and high-voltage electrified areas, there should be protective fences, shelters and warning signs, and warning lights should be set at night in dangerous places (which should not affect traffic).

1 1. When it is necessary to dismantle the original retaining wall, retaining wall, end wall and other buildings, first investigate whether there are pipelines, cables and other facilities under the structure, and report to the Railway Bureau for approval according to the prescribed procedures before starting work.

12. It is forbidden to dig a hole for earth, or dig on the reverse slope (the reverse slope with a convex top and a concave bottom).

13. No digging is allowed when the train passes by. All large-scale construction machinery must strictly implement the parking concession regulations.

14. When mechanical excavation is adopted, the bucket shall not collide with all buildings on the railway and shall not invade the clearance of the existing line.

15. When the excavation face is cleaned manually, the earth-moving machinery should be withdrawn from the excavation face, and it is forbidden to carry out human-machine mixed excavation.

16. The existing railway facilities shall not be damaged at will. The railway purse seine removed during construction and the damaged existing signs must be restored at any time as required.

17. Before large-scale machinery operation, the operator shall make a detailed inspection of the machinery according to the requirements of safety technical disclosure and safety precautions; Concentrate on your work, don't leave your post without permission, and strictly implement Jitong's regulations on parking and giving way to customers.

18. When working beside the existing line, full-time security officers should be set up to be responsible for the arrival notice and warning, and no operation is allowed when the train passes.

19. Online roadside storage machinery (tools) must meet the requirements of railway building clearance.

20. When working on the existing wire cutting roof and slope, a partition wall with a thickness of > 2m should be set aside near the existing line to prevent the construction machinery from slipping.

2 1. Drivers must be familiar with the performance, maintenance and operation methods of the vehicles they drive. Check and maintain the vehicle regularly and keep it in good condition. It is forbidden to engage in construction and transportation operations on existing lines for vehicles with diseases such as ignition device, steering gear and poor brakes.

22. When driving on the construction service road near the existing line, the speed shall be ≯ 10Km/h, and when turning downhill, shift to a low gear to keep the clearance distance.

23. Don't park on the ramp. If it is necessary to park on the ramp, anti-skid measures should be taken to prevent accidents caused by vehicle skidding.

24. Dumpers must be leveled before driving to prevent aerial cable from slipping or hanging.

25. When the train passes, the existing transport vehicles and their construction equipment must stop working and remain in a static state.

26. When transporting general light materials and machinery across the track, it is necessary to concentrate on a fixed place and assign road builders with strong sense of responsibility who have passed the training and examination as construction guarantee. When the terrain of the cross-line operation site is complex and the observation conditions are not good, a full-time protector should be added.

27. Heavy building materials (such as > > 100kg of sand and gravel, etc.). ) station liaison officer should be sent to contact by telephone or walkie-talkie. Using the interval between trains, the stop signal can be used to protect the railway crossing construction at the construction site. If the communication is interrupted, stop the track crossing operation.

28. When heavy construction machines and tools (machinery) need to be transported by many people, they must go through the registration formalities in station attendant and use trains to cross the track at intervals. Resident liaison officers should be set up during the operation to contact the construction site by telephone or walkie-talkie.

29. Remove the retaining wall and retaining wall on the existing line, and make the drainage ditch unblocked. When it rains, in addition to strengthening the support, the exposed surface must be covered with rainproof and waterproof measures to ensure the stability of the slope.

30. When the existing ditches and culverts are demolished, water improvement must be carried out first. The cross sections of the water improvement channels and water collection pipes shall not be less than the displacement of the original channels, and floating objects and mud deposits shall be cleaned frequently to ensure smooth water flow.

3 1. In rainy days, someone must patrol around the clock to prevent the channel from being blocked and the water surface rising to soak the line and cause accidents.

32. Underground pipelines or hidden facilities are not clear or no protective measures are allowed to start; When digging a cable trench to a depth of 400 mm, we should pay attention to digging carefully to prevent the existing cable from being damaged. The person in charge of construction safety and the cooperation personnel of the equipment management unit keep an eye on the site, and the workers dig carefully with a shovel. Once dug up, it should be checked immediately and signed for approval. After signing for approval, it should be protected according to the protection measures discussed in advance. Those who have no time to protect should be guarded day and night, and there should be a written handover record when handing over.

33. Excavators and pickaxes are not allowed to be used within 2m on both sides of underground optical cable. When mechanical operations are carried out near underground cables, full-time protection personnel should be assigned to conduct on-site command to ensure the safety of underground cables. All kinds of construction machinery are not allowed to longitudinally crush the upper ground of the cable.

34. For aerial work such as docks, safety nets must be set up, and operators must wear safety belts to ensure personal safety.

35. Before leaving the construction site or leaving work, the operator of digging pile must effectively cover the unfilled orifice to prevent pedestrians and livestock from falling into the hole.

36. Seriously abide by the above regulations and the relevant management requirements of the project department, and put an end to accidents of general level D and above, personal injury and above, traffic accidents, fire accidents and all quality accidents.

If Party B violates the above management requirements or other safety and quality management regulations, the project department will give economic punishment according to the management regulations, and compensate Party A for all economic losses and accept economic punishment according to the management regulations such as safety management measures and quality management measures of Jitong double-track project department of China Railway 2 1 Bureau Group Five Company.

Party A: Party B:

Representative: representative:

20xx Year Month Day 20xx Year Month Day

Article 2 of the safety agreement contract 1. In order to ensure the safety of the renovation project area during the renovation, the renovation safety agreement is hereby concluded as follows:

Party A:

1. Supervise the decoration project according to the relevant approved design scheme.

2. Coordinate Party B's construction mobilization.

3. Party A has the right to supervise Party B's fire safety during the construction period, and if Party B is found to have unsafe factors, Party A has the right to order Party B to rectify. ..

Party B:

1. Party B shall organize the required construction personnel by itself and conduct safety education and safety management for the construction personnel. Formulate relevant safety plans and rules and regulations and supervise their implementation.

2. When working at heights, Party B shall take safety protection measures in strict accordance with relevant regulations. Construction can only be carried out under the condition of ensuring safety.

3. Party B shall be responsible for any safety accident during the construction, and Party A shall not bear any responsibility.

4. This Agreement is made in duplicate, with each party holding one copy.

5. This agreement has legal effect once it is signed, and both parties will abide by it together until the end of construction acceptance.

Second, the decoration quality

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. In the process of construction, if Party A has special construction quality requirements, both parties shall confirm through consultation.

3, batch of interior walls, smallpox, ensure parallel. It should not be uneven, and the angle of yin and yang should be straight.

After three batches of ash, grind it into oil and roll it for at least three times to ensure the oil is bright.

Three. terms of payment

1, 20% advance payment for the first batch of ash after the project progress is approved.

2. Pay 30% after three times of ash acceptance.

3. Pay off the balance after receiving oil for three times.

Signature of Party A: Signature of Party B:

Tel: Tel:

Year, month, sun, moon, sun.

Security Agreement Contract Part III Computer Information Network International Networking Unit Name: _ _ _ _ _ _

This international networking unit is willing to obey the management of the Public Information Network Security Supervision Section of the Municipal Public Security Bureau, and agrees and will abide by this agreement:

Article 1 This unit consciously accepts the safety supervision, inspection and guidance of the public security organs through the computer information network connected with the international network, truthfully provides the public security organs with information, materials and data files related to safety prevention, and assists the public security organs to investigate and deal with illegal and criminal acts.

The information, materials and data files required for safety protection management mainly include: (1) user registration, use and change (including user account number, IP, email address, etc.). ); (2) Distribution, use and change of 2)IP address; (3) the setting and change of the webpage column and the person in charge of the column: (4) the setting of the network service function; (5) Other information related to safety protection.

Article 2 This unit and its users shall not use the Internet to endanger national security, divulge state secrets, infringe upon the interests of the state, society and the collective and the legitimate rights and interests of citizens, and shall not engage in illegal and criminal activities.

Article 3 This unit and its users shall not produce, copy, consult and disseminate harmful information through the Internet.

Article 4 This unit and its users shall not engage in activities that endanger the security of computer information networks.

Article 5 This entity and its users shall perform the security protection duties stipulated in the Administrative Measures for the Security Protection of International Networking of Computer Information Networks.

Article 6 When discovering illegal and criminal acts in computer information networks, the unit shall keep relevant original records and report to the local public security organ within 24 hours.

Seventh access units, legal persons and other organizations using computer information networks for international networking shall, within 30 days from the date of formal networking, go through the filing formalities with the public information network safety supervision department of the Municipal Public Security Bureau according to law.

If this unit does not comply with this agreement and violates relevant laws and regulations, it will be punished by the public security organ according to law.

Safety responsibility of supervision unit:

_ _ _ _ _ Municipal Public Security Bureau Public Information Network Security Supervision Section

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Computer information network international networking unit: _ _ _ _ _ _

Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The fourth contract of safety agreement Party A: x924 Highway Overhaul Project Department: (hereinafter referred to as Party A) Party B: Which township _ _ _ _ _ _ _ village: (hereinafter referred to as Party B)

In order to speed up the construction progress and ensure the supply of materials on the construction site, the following agreement is reached through consultation between both parties:

(1) The _ _ _ _ _ _ _ _ _ is responsible for setting up the sand and gravel transport fleet for the site construction of the third and fourth blocks of this project, with about 8 vehicles in good condition, and the vehicle loading capacity should be above 10 cubic meter.

⑵ All vehicles and drivers must have complete certificates and be familiar with the operation. In the process of transportation, it is necessary to ensure driving safety and abide by traffic rules. In case of all traffic accidents, Party B shall be responsible, and Party A shall not be responsible.

(3) Scope of transportation

Unit price: The average unit price from Chen Silin gravel yard to Gaojian Village Pass and Gouchang Village is 188 yuan per cubic meter (18), and the volume is calculated according to different vehicle surfaces. Party B must increase or decrease vehicles according to Party A's needs.

(4) Settlement and payment: the account shall be settled before 3 1 every month and paid before 3/the following month. Party A has oil on site, and Party B is willing to refuel here. When Party A refuels, the oil price shall be settled at the market price and deducted from Party B's monthly transportation payment.

5] Party B must obey the command and arrangement of Party A's on-site management personnel during transportation, and shall not practise fraud during transportation, otherwise, once found, Party A will not settle accounts.

[6] Both parties to the above agreement must strictly abide by it. If economic losses are caused by breach of contract, the breaching party shall be liable for compensation. This agreement is made in duplicate, one for each party.

Once the agreement comes into effect from the date of signing, the transportation of this section ends and the money is settled, which is naturally invalid.

Representative of Party A: Representative of Party B:

Year, month, sun, moon, sun.

Security Agreement Contract Article 5 In view of the fact that XXXX and Microsoft (China) jointly set up the "Microsoft High-end Talents Training Program" _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I. Responsibilities and rights of schools:

1. Strictly verify the qualifications of training and employing units, which must be approved by the national industrial and commercial departments, have legal training and employing qualifications, and have standardized management to ensure the legitimate rights and interests of trainees during the training period.

2. Do a good job in students' ideological and moral education, so that students can establish a good outlook on employment and life; Seriously organize students to study abroad, pay attention to matters and discipline.

3. Assist the training unit in the management of students during the training period, do a good job in communication and coordination with the training unit, track the work, thoughts and life of students, actively safeguard the rights and interests of students, and report relevant information to the parents of students when necessary. Students who encounter difficult problems (such as technical problems, ideological problems, salary problems, etc.) can contact the school in time. During the training period, the school should actively assist in handling it.

4. After the trainees' training, they will be appraised by the entrusted training unit, and those who pass the training will be recommended and arranged by the training unit. The training unit and the school jointly discuss the curriculum replacement plan, identify the relevant credits of the students, and ensure the smooth graduation of the students. Those who fail must go back to school and study again until their grades are qualified, otherwise the school will not apply for a diploma in the end.

5. The school will not accept those who interrupt the training and leave the training unit without authorization during the training period, and the school will not bear any responsibility for all the adverse consequences arising therefrom.

Second, students' responsibilities and rights:

1. The main body of safety responsibility for off-campus training is the students themselves. Students must abide by national laws and regulations, and don't do anything that violates them. In case of illegal events, the trainees themselves shall take full responsibility for the actions and consequences during the training period.

2. During the internship in the unit, students should consciously restrain themselves and strictly abide by the rules and regulations and safety systems of the training unit. Unite and help each other, obey the work arrangement of the training unit, accept the assessment of the training unit, and respect the leaders and employees of the training unit. Do not do anything that harms the image of the training unit and the school.

3. Do not do personal things during working hours, abide by the work and rest system of the training unit, and do not leave the internship unit without approval. Leave for less than 1 week shall be approved by the internship unit, and leave for more than 1 week shall be approved by the school and the employer.

It is forbidden to swim in rivers, lakes and ponds. It is forbidden to ride uninsured privately operated vehicles, and it is forbidden to drink, make trouble, smoke, fight and participate in pyramid schemes; It is strictly forbidden to enter and leave unhealthy Internet cafes, dance halls, nightclubs, bars, game halls and other places; It is forbidden to make friends indiscriminately, without self-respect, self-esteem, and pay no attention to your image, which will damage the honor of the school and the unit. Those who are disheveled, dressed strangely or don't respect the leading cadres of the internship unit, contradict others, make trouble without reason, interfere with the normal work order, have disputes with others or violate relevant regulations, which have a bad influence on the internship unit and the school, will be severely dealt with by the school until they are expelled from school and stop issuing graduation certificates.

5. Students who participate in the internship organized by the school should report to the responsible teacher regularly during the training period, and report any special problems at any time without delay. The internship unit shall not change halfway, and those who leave without reason shall be treated as unqualified internship and shall not graduate.

6. Students should firmly establish safety awareness during training, put an end to unsafe accidents, and ensure the safe and smooth completion of off-campus study.

Three. This agreement is made in duplicate, one for each party.

Once this agreement is signed, both parties must strictly abide by it, and neither party may unilaterally modify it. If there are any matters not covered in this agreement that need to be revised, it must be agreed by both parties through consultation, otherwise it will be invalid.