Current location - Quotes Website - Personality signature - What information does Hefei building fire protection drawings need to be submitted to the fire brigade for review?
What information does Hefei building fire protection drawings need to be submitted to the fire brigade for review?
3. The construction unit shall provide the following materials when applying for fire protection design audit (the time limit for examination and approval is 20 working days). ※

(a) new construction, renovation, expansion, change of use (if declared by an illegal person, the original and photocopy of the ID card and the power of attorney shall be provided)

1, Application Form for Fire Protection Design Review of Construction Projects (only the Record Form for Fire Protection Design of Construction Projects needs to be filled in and stamped with the official seal);

Legal identification documents such as the business license of the construction unit (copy stamped with the official seal of the unit);

Red line diagram of construction project planning and design of new and expansion projects (copy);

Qualification certificate of design unit (copy stamped with the seal of the unit);

5. A set of fire protection design documents (including general plan, architectural drawings, water, electricity and heating drawings, etc.). );

6, a full set of drawings CD.

Note: General plan, building plan, elevation and profile should be prepared when site selection or scheme design is reviewed.

(two) the interior decoration of the building (the original and photocopy of the ID card and the power of attorney are required for the application of the unincorporated group)

1, Application Form for Fire Protection Design Review of Construction Projects (only the Record Form for Fire Protection Design of Construction Projects needs to be filled in and stamped with the official seal);

2, the building "building fire acceptance opinions" (copy);

, interior decoration design drawings, power, lighting and other electrical circuit layout drawings, fire engineering drawings, but also should submit fire design drawings (including automatic sprinkler system drawings, automatic fire alarm system drawings, smoke control drawings, etc. The drawings must have the design certificate number, the name of the design unit, the signatures of the designers and auditors, and be stamped with the special seal for design. )

4. CD-ROM of architectural drawings;

Description of decoration materials;

Certificate of use of the place (copy).

7, the construction unit's business license and other legal identity documents or industrial and commercial pre-approval notice (copy);

, design unit qualification certificate (copy).