"Fire Protection Law of the People's Republic of China"
Application conditions: Meet the requirements of national fire protection technical specifications
Material details: 1. Construction project review :
1. "Building Fire Protection Design Fire Protection Review Report" and "Construction Internal Decoration Design Review Report" (projects with automatic fire protection facilities should also fill in the "Automatic Fire Protection Facilities Review Report";
p>
2. A project approval document from the planning department and a survey line map from the planning and construction department;
3. National and provincial key engineering projects and other construction projects with automatic fire protection facilities should have fire protection equipment Special article on design;
4. Industrial buildings should have production process flow, raw materials and semi-finished products used, physical and chemical properties, quantities, transportation and storage methods of finished products;
5. A set of civil engineering, water, electricity, HVAC, fire protection system drawings and structural construction drawings of steel structure buildings;
6. The design of building fire protection facilities must be undertaken by a legally qualified unit, and the drawings must have a design certificate. No., the name of the design unit, the signatures of the designer and reviewer, and a special design seal.
2. Completion acceptance:
1. The construction unit shall submit the requirements to the public security fire department. Fire protection acceptance report, and fill in the "Construction Project Fire Protection Acceptance Application Form";
2. Building fire protection facility inspection report;
3. Copy of the fire protection construction license of the fire protection engineering construction enterprise
4. Fire safety quality acceptance report of the construction unit organization design, construction, supervision unit;
5. Approval documents of the public security fire protection agency, including: construction drawing design fire protection Review opinions, decoration project design fire protection review opinions, other design fire protection review opinions;
6. Fire protection design special article and fire protection design change technical contact sheet;
7. Fire protection Copies of product production license certificates, quality inspection reports and certificates of conformity for building fire protection materials, components and fire protection products, as well as confirmation reports from the production units of major fire protection products and equipment on the quantity, model and construction and installation quality of their products and equipment; p>
8. Automatic fire protection facilities installation and commissioning records, underground and concealed project acceptance records, fire protection facility system debugging reports, fire protection facility linkage test reports issued by the construction unit, automatic fire protection facility operation and maintenance management manual,
9. A set of as-built drawings, including: as-built drawings of construction, water, electricity, HVAC and other systems;
10. List of personnel on duty in the fire control room and training records;
< p>11. Steel structure fireproof spraying construction and inspection records.Processing process: 1. Acceptance at the fire protection window of the district government approval center;
2. Review and on-site inspection by the handling personnel;
3. Receipt