Current location - Quotes Website - Personality signature - House inspection and measurement process and precautions
House inspection and measurement process and precautions

The measuring room is a very important part of the decoration. The number of rooms is good and will help with future renovations. The measuring room is more than just measuring data. The traditional measuring room only takes 10 minutes, but it takes at least 60 minutes to reach the professional standard room. Designers go to the on-site measurement room to understand the structural and environmental characteristics of the house inside and outside, which is a solid foundation for high-quality home decoration. The editor of Tubatu introduces the process and precautions of the acceptance room below.

Quantity of inspection rooms and precautions

1. The number of rooms determines the quotation

To put it simply, the measurement room is where the customer brings the designer to the new house for on-site measurement. The length and width of each room in the house. The height and position of doors, windows, air conditioners and heaters are measured one by one, and the volume of the room first directly affects the quotation of decoration. At the same time, the measurement process is also a process of on-site communication between the customer and the designer. Although it takes less time, seemingly simple mechanical work can influence and determine your next decoration.

Second, the volume of the room determines the design

The design is not a simple mechanical repetition. The internal and external environment of each owner's house is different. Different geographical environments and spatial conditions determine different design. When the designer is in the measurement room, he must carefully observe the location and direction of the house, as well as the surrounding environmental conditions, whether there is too much noise, the air quality, and whether the lighting is good. Since these conditions directly affect the later design, if the house is close to the street and the noise is too high, the designer can suggest the owner to install insulating glass to make the sound insulation effect better; if the original lighting is not good, the design needs to be used to make up for it.

Three, six steps of volume

Different designers have different methods of measuring rooms. In fact, as long as the owner's room type is accurately measured, the purpose of measuring the room can be achieved. Here, the measurement steps are briefly summarized and provided for your reference. I hope it helps you turn decorating into a simple matter.

1. Check in all rooms and understand the basic room structure. Pay attention to special things.

2. Draw a rough plane on paper (not to mention dimensions, this plane is only for recording specific dimensions, but rather to reflect the front, back, left, and right connections between rooms).

3. Measure a room from the entrance door and record each measurement to its corresponding location in the plan.

Measurement method

(1) Use a tape measure to measure the length and height of the room (the length should be measured close to the ground, and the height should be measured close to the corner);

(2) Lead to another room to measure and record specific dimensions (understand the spatial structural relationship between the two rooms);

(3) Observe the doors, windows, switches, sockets, pipes, etc. on the four walls, only Need to be on paper;

(4) Measure the length, width and height of the door itself, then measure the left and right spacing between the door and the wall, and measure the spacing between the door and the suspended ceiling;

(5) Measure the length, width, and height of the window itself, then measure the left and right spacing between the window and the wall, and measure the spacing between the window and the suspended ceiling;

(6) Record the switch according to the measurement method of doors and windows, Size of sockets and pipes; pay special attention to kitchens and bathrooms. )

(7) Pay attention to the size and fixed position of the beams on the ceiling of each room.

4. Measure all rooms in the house according to the above method. If it is multi-story, in order to avoid missing measurements, the measurement sequence should be measured after measuring one floor, and the order of the rooms should be from left to right;

5. There are different colored pen marks with special points;

6. After all measurements are completed, perform another acceptance check to ensure accurate and detailed measurements.

Four. Pay attention to the volume room

1. Know the total meter capacity in amperes. Calculate whether your approximate dosage is sufficient. If you require higher power, you will need to apply to the power bureau for changes.

2. Find out how many cubic meters of gas and natural gas are used.

Likewise, if there are any changes, you need to apply to the gas company in advance.

3. Find out which walls are load-bearing based on the design of the home (note this is not the house type map you get when you buy a home, but the exact architectural room types the property offers).

4. Once you enter the house, know the location of the water inlet pipes and the number of pipes.

5. Know where the drains are and where the toilet pits are.

5. Things to note when checking and accepting a house

First of all, whether the floor of the building is flat

If you want to check whether the floor of the building is flat, you only need to use a long ruler (or a special ruler versus a level one). Smooth, while observing whether there are scratches and cracks, whether there are bursting points on the wall (exploding points: when applying unslaked lime, quicklime does not mix well, it will form bursting points on the wall, and iron points will be used Defeat the explosion point. "When you find large areas of looseness, falling off and other quality problems.

Second, whether there are cracks in the wall

To check whether the wall is flat, you also need to check the wall. Whether there are cracks in the body (four common cracks: strength cracks, settlement cracks, temperature cracks, deformation cracks), whether there are external leaks in the steel mesh and steel bars. If you find problems with the walls above during the acceptance process, you can check with the developer. Final signature with help.

III. Whether the indoor stairs are defective

This step mainly depends on the flatness of the stairs and whether there are any defects.

IV. , whether the doors and windows are installed and the track is smooth

When inspecting the doors and windows, the most important thing is to inspect whether the tracks of the doors and windows are smooth. In particular, we must pay attention to whether the casement windows can be closed, otherwise, there will be wind. Entering the house, especially in the cold north, you will be miserable in winter. If you find these problems when accepting the house, you will notify the developer directly, and they will look for developers to deal with it if you have already signed it. For these problems, their efficiency is the speed of a turtle.

Five, whether the door has bumps and paint

It is necessary to carefully check whether the door has bumps and paint. Strictly speaking, the door has no bumps and paint. The inside, outside and top must be painted. The gap between the doors should not be too large, there should be no special sound when the door opens and closes, the door frame must be glued tightly, and the side gap of the door lock should not be too large. The main purpose of testing the lock is to see whether the key is easy to use and whether the door lock is securely installed. The other important point is that the door has better sound insulation and higher sealing.

Sixth, acceptance process

p>

1: Bring the key acceptance room

Before handing over to the owner, the developer usually assigns the engineering department, customer service department and property company to form an internal acceptance team for the upcoming owner-occupied house. Conduct a pre-inspection and correct any problems found in a timely manner. After the pre-inspection, the developer will hand over the keys to the property company, which will arrange for the owner to inspect the house.

The owner will generally receive a "notice of entry" for the property 5-7 days in advance. It is best to sign the contract as the contract generally stipulates that if the owner fails to go to the acceptance room within the agreed time limit, it will be deemed to have been handed over. Upon delivery, some developers will also charge a hosting fee of 10,000 to 10% from the date of contract. If the owner is away on a business trip or has special circumstances, it is best to notify the developer in writing and explain the reason. /p>

3: Confirm identity.

The owner should bring the relevant information to the sales department, confirm the identity according to the requirements of the registration notice, and contact the acceptance and handover. Information generally includes: notice of occupancy, purchase and sales contract or pre-sale contract, original and copy of ID card, photos of family members (property submitted by the client). If the customer is entrusted to inspect and accept the house, the customer must also issue a "power of attorney" to the owner while holding a valid identity document.

4: Handover of the house for acceptance.

The property management company will assign relevant personnel to accompany the owner to inspect and accept the house on site. If the acceptance is passed, the owner must sign and approve the "Building Acceptance Handover Form" to obtain the house keys and "Home Use Instructions", "Residence Quality Assurance" and "Resident". Manuals and other materials must be paid for as specified. If the acceptance fails, the owner should clearly record the defects in the "Building Acceptance Handover Form", but it may not be possible to move in at the moment. The time for redelivery should be negotiated by both parties, but should generally not exceed 30 days.

Number of inspection rooms and precautions

The above is the relevant content and precautions for the cleaning process. As the most important step before moving in, a home inspection room must be taken lightly. If you want to know more about the capacity space process, please pay more attention to Tubatu, Tubatu will provide you with more complete, detailed and updated information.