Who is the person in charge of the design unit in the quality inspection report of architectural engineering design documents?
Signature of qualified unit designated by the construction management department. 1. The design unit is responsible for printing and filling in the quality inspection report of design documents and submitting it to the construction unit.

2. Fill in the requirements with true content, concise language and clear handwriting.

3. Where you need to sign, you should print your name first, and then sign it yourself.

4 design document quality inspection report in quadruplicate, one for the design unit, the construction unit, the monitoring station and the filing authority.

People's Republic of China (PRC) Civil Code

Article 799 After the completion of a construction project, the developer shall make timely acceptance in accordance with the construction drawings and specifications, construction acceptance specifications and quality inspection standards issued by the state. After the acceptance, the employer shall pay the price as agreed and take over the construction project.

Only after the construction project is completed and accepted can it be delivered for use; Without acceptance or unqualified acceptance, it shall not be delivered for use.

Article 800 Where the survey and design quality does not meet the requirements or the survey and design documents are not submitted within the time limit, thus delaying the construction period and causing losses to the Employer, the surveyor and designer shall continue to improve the survey and design, reduce or waive the survey and design fees, and compensate for the losses.

Article 801 Where the quality of a construction project is not in conformity with the contract due to the builder's reasons, the developer has the right to require the builder to repair, rework or rebuild it free of charge within a reasonable period of time. If the delivery is overdue after repair, rework or reconstruction, the builder shall bear the liability for breach of contract.

Article 802 Where the construction project causes personal injury or property loss within the reasonable use period due to the contractor's reasons, the contractor shall be liable for compensation.

Article 803 Where the developer fails to provide raw materials, equipment, site, funds and technical data in accordance with the agreed time and requirements, the contractor may postpone the project date, and shall have the right to claim compensation for losses such as work stoppage and slowdown.

Article 804 Where the project is stopped or postponed due to the employer's reasons, the employer shall take measures to make up for or reduce the losses, and compensate the contractor for the losses and actual expenses caused by the stoppage, slowdown, transshipment, relocation of machinery and equipment, and backlog of materials and components.