How to design the level 7 manor the day after tomorrow? If the player can reach the level 7 manor, it will basically become the peak after tomorrow, but many players don't know how to match the level 7 manor. Next, I would like to introduce the design of the seven-level manor the day after tomorrow.
Introduction to the Design of Grade 7 Manor of The Day After Tomorrow
Author: Duobei Snow Mountain is in danger.
As usual, I drew a floor plan all morning. You are only allowed to laugh, and you are not allowed to spit on my painter!
Building materials: floor 107, wall 30, low wall 14, type 3 inclined wall 1, type b window 28, type c window 1, door 4, type 2 external convex corner 4, column 1, fence 6 and fence 27.
The first floor; The second floor
The wall area of the first floor is 3x6+2x3+ 1x2, and the post area of the doorway is 2x2.
Don't waste such a big house, right? We can open a small restaurant on the first floor. The mistake in the plan is that the low wall on the first floor is not drawn, and the area of the low wall is 2x2. This small platform can be used as a kitchen or cashier.
second floor
The wall area on the second floor is 2x5+3x3+ 1x2, and the balcony area is 3x 1+3x2. The installation method of internal spiral stairs is to install all the surrounding walls first, and then put the stairs. You can't put a door under the spiral staircase. The installation method of the upper door is to install the door on the door frame first, and then move it to the spiral staircase as a whole. Please see my villa skills for specific installation methods. )
Second floor [British English]; Third floor [American]
The wall area of the third floor is 2x4+2x3, and the terrace area is 2x2. The installation method of column fence is to install one side first, adjust it to the opposite direction with the direction adjustment button, and then adjust the direction back after installing the other side. To sum up, the fence with columns needs to be adjusted. If it can't be installed, continue to adjust. If it can't be installed for a long time, then my friend, I advise you to replace the fence with a column. Note: first install the wall and then install the fence with columns! ! )
roof
The pavilion roof is a type 2 convex corner, and your type 2 convex corner will also change color after strengthening.
The low wall here is 3x2. If there is a gap between the low cabinets in the bar, put them in turn from right to left.