Current location - Quotes Website - Personality signature - Who issues the construction start order?
Who issues the construction start order?

After the chief supervisory engineer signs the review opinions and submits them to the construction unit for approval, the chief supervisory engineer issues a construction start order. The following conditions are met:

Design disclosure and drawing review have been completed

The construction organization design has been signed by the chief supervising engineer

On-site quality and safety production management of the construction unit The system has been established, the management and construction personnel are in place, the construction machinery is ready for use, and the main engineering materials have been implemented

The access roads, water, electricity, communications, etc. have met the requirements for starting construction

The Superintendent shall issue a commencement order 7 days before the commencement date. The commencement date shall be calculated from the commencement date specified in the commencement order.

The director organizes professional supervision engineers to review the construction start-up application form and related materials submitted by the construction unit. When the review meets the requirements, he will sign the review opinions and submit them to the construction unit for approval, and then the chief supervision engineer will sign the project Commencement order.

Summary of similarities

1. Construction organization design: review by special supervisor, signed by the chief supervisory engineer

2. Construction plan: review by the director organized by professional supervision engineers

3. Review and confirmation of the qualifications of subcontracting units: professional supervision engineers review materials, and chief supervision engineers review

4. Check construction control measurement results: professional supervision engineers inspect and review

5. Inspection of the construction laboratory: the director organizes professional supervision engineers to review

6. Quality control of engineering materials, components, and equipment: special supervision

7. Start of construction Order: Signed by the Chief Supervisory Engineer

The 2022 Supervision Engineer Course is newly upgraded. The online school summarizes many years of successful tutoring experience, starting from the actual needs of students, combining the rules, key points, and difficulties of the Supervision Engineer Examination, and integrating advanced teaching concepts. , three major classes are opened for different students: value-for-money quality classes, efficient experimental classes, and exclusive worry-free classes.

1. Development order issuance system

(1) The supervision agency shall, within the time limit stipulated in the construction contract and with the consent of the contractor, issue a site entry notice to the contractor, requiring the contractor to Timely dispatch of personnel, construction equipment, and materials to the site for construction preparations as agreed. The start date of the contract period should be specified in the site entry notice.

(2) The supervision agency shall assist the contractor in handing over to the contractor the construction land, roads, measurement reference points, water supply, power supply, communication facilities and other necessary conditions for the start of construction that shall be provided by the contractor as stipulated in the construction contract.

(3) Really review whether the qualifications of the contractor are consistent with the scale and professional nature of the project undertaken; review whether its quality management system, technical management system and quality assurance system (including employment certificates of relevant personnel) are complete Improve and review construction organization design.

(4) After the contractor completes preparations for starting construction, he shall submit an application for starting construction to the supervision agency. After checking that the construction preparations of the contractor and the contractor meet the conditions for starting work, the supervision agency will issue a start order and stamp it with the seal of the project supervision department.

(5) If the project fails to start as scheduled in the construction contract due to the contractor's reasons, the supervision agency should notify the contractor to submit a rush measure report within the agreed time and explain the reasons for the delay in starting work. The contractor shall be responsible for the resulting increased costs and losses caused by construction delay. Due to the employer's reasons, the project failed to start on time as agreed in the construction contract. After receiving the contractor's request to extend the construction period, the supervision agency should immediately negotiate remedies with the employer and the contractor. The resulting increased costs and losses caused by project delays shall be borne by the contractor.

2. What is the "Construction Start Order"

The start order is a written document issued by the director to start construction on the start date.

3. Definition

The start date is very important. Mainly because it is the starting point for calculating duration. At the same time, the contractor also needs to have a clear start date in order to obtain the required commitments (such as ordering, renting machinery, providing labor, etc.) from subcontractors, suppliers and other relevant parties in advance, and to obtain advance payment from the owner. payment. For the owner, when the supervision engineer issues a start notice, he must hand over the required site and access to the contractor in accordance with the construction sequence requirements stipulated in the contract. Any delay will cause the project to be delayed and the owner to pay an additional fee.