If the client has not made any rights and interests that violate the laws of the state, the client shall not break his word for any reason when exercising his power. In the progressive society, more and more people contact and use the power of attorney. How to write a proper power of attorney? The following is the power of attorney template for the project (bullet number 12) I compiled, which is for reference only and I hope it will help you.
1 Project Power of Attorney Shenzhen _ _ _ _ _ Group Co., Ltd.
We hereby entrust your company to undertake the construction of _ _ _ _ _ _ _ sand table model base in Danzhou, Hainan. The specific project entrustment agreement is as follows:
1. Project scope: sand table model base in Danzhou, Hainan.
2. Construction foundation: cooperate with the marketing department to start business smoothly.
3. Duration: (fill in duration and start date)
4. Acceptance standard of project quality: it shall be implemented according to the current national acceptance standard of project quality.
5. Basis for project settlement: All expenses are lump-sum for the project valuation: 82293. 16 yuan (RMB: eight hundred and twenty-two million nine hundred and ninety-three yuan and ten cents); See the quotation sheet for pricing items and unit prices.
6. Warranty: According to the relevant clauses in Article 5 of this contract.
7. Payment: 80% of the actual expenses shall be paid within/0/4 days after the project is completed and accepted, 95% of the settlement expenses shall be paid within/0/4 days after the settlement, and the rest shall be paid in one lump sum within/0/4 days after the warranty period expires. (If there is no warranty, it will be paid in one lump sum within 14 days after settlement. )
8. Breach of contract: if the construction period is delayed due to the reasons of the entrusting unit, the liquidated damages shall be 200 yuan/day, and the total amount of liquidated damages shall not exceed10% of the entrusted project cost; If the construction period is delayed due to the entrusting unit, the construction period shall be postponed accordingly.
9. Others: After the project is completed and accepted, the entrusting unit shall declare the project visa form and related materials within 5 days and submit the project settlement materials within 28 days; Otherwise, it is deemed that the economic rights of the entrusted unit have been abandoned.
Entrusting unit: Danzhou Heng _ _ _ Co., Ltd. Engineering Department Entrusting unit: Shenzhen _ _ _ _ Group Co., Ltd.
Signature representative (seal): (signed by the manager of the engineering department or the competent leader) Signature representative (seal): (signed by the entrusting unit)
Power of attorney 2 Entrusting unit: company (official seal) year month day.
Project name:
Basic information of the project:
This project is a project. The project is located in the north and west of Shilu Road, covering an area of about square meters.
Design basis:
According to the current national design and acceptance standards, the external engineering of the residential area is designed according to the general plan of the residential area and the layout positioning map. All outdoor pipelines and lines in this community are buried. Design content:
A. Outdoor water supply and drainage specialty:
① Construction drawing design of water supply project: determine the entrance, pipe diameter, water meter, valve and water meter well of outdoor water supply pipe network in the community; Valve well. Construction drawing design of rainwater and sewage project: determine the location of rainwater and sewage pipe network according to the general plan and construction positioning map. Diameter, material, elevation and capacity of septic tank (septic tank adopts cast-in-place reinforced concrete septic tank).
② Construction drawing design of fire fighting project: determine external pipe network, fire fighting waters, fire fighting pump house, pipe diameter, pipes, valves, valve wells, outdoor fire hydrants, etc. Set up a DN80 fire water meter. Design of fire control room.
2. Construction drawing design of natural gas engineering:
Determine the location, pipe diameter, material and buried depth of the external network of natural gas engineering.
3. Heating major:
Construction drawing design of heating project: determine the external network path, heat exchange station, valve, valve well, buried depth elevation, material and pipe diameter of water supply and return pipeline of heating project.
4. Electrical major:
① Construction drawing of power supply project: line laying mode, cable specification and model, transformer position, etc.
② Construction drawing design of fire linkage line: line direction, laying method and cable specification. Model, fire fighting equipment.
③ TV construction drawing design: the path, model and specification of TV line system.
④ Telephone and network construction drawing design: telephone and network line system and path.
⑤ Construction drawing design of elevator intercom: elevator intercom, monitoring the number, path and specification of lines.
⑥ Construction drawing design of residential monitoring circuit: residential monitoring circuit, monitoring room and location. Determine the camera position, specifications and models, and specifications and models of lines and cables.
⑦ Design of mobile signal amplification construction drawing: route and inspection well location.
5. Construction drawing design of residential roads: determine residential road practices, road width, elevation, etc.
6. Construction drawing design of integrated pipe network and integrated wiring: the above water supply and drainage pipelines are comprehensively designed in one drawing; All kinds of strong and weak current lines are comprehensively designed in one picture.
date month year
Power of attorney of the client for Project III: _ _ _ _, female, born on _ _ _ _ _, and now living. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Trustee: _ _ _ _ _ _ _, female, born on October 20th, and now lives in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
The relationship between the principal and the trustee is _ _. As the client is abroad, I hereby entrust the trustee with full authority to handle my notarization.
All relevant documents signed by the trustee in handling the above matters shall be recognized by the client, and all legal responsibilities shall be borne by the client voluntarily.
The trustee has no right to entrust.
The entrustment period ends when the entrusted matters are handled.
Principal: _ _ _ _ (signature)
May 3, 20__
Power of Attorney 4 XXXXXXXXXXX Communication Engineering Co., Ltd.:
According to the business development needs of our company, our company has established the XXXXXXXXX project of China Unicom Hunan Broadband and Data Integrated Customer for 20 years. It is required to open all the items in the attachment on June 20__ 18. Please organize the implementation of this project immediately. The main requirements are as follows:
1. Please determine the person in charge of this project as soon as possible, and complete the design disclosure before June, 20__ _ 10, formulate the project implementation plan according to the design plan, and start this project as soon as possible. The project settlement is estimated according to the relevant charging standards of our company.
Second, please carefully organize the on-site implementation work and pay attention to safety in production. During the construction period, your company will be responsible for all the direct and indirect responsibilities (including all kinds of legal responsibilities) for the following safety accidents and damages, and our company will not bear any responsibilities:
1, all kinds of personal safety accidents and power supply accidents during construction;
2. Improper construction causes communication failure and damages other public and private property;
3, caused by design
4. Inappropriate construction, resulting in accidents of engineering quality and material problems;
5. Other related accidents.
III. Project Contact:
department
Name of project manager of construction and maintenance department XXX telephone XXXXXXXXX email
Network Construction Department of XXXX Branch of China United Network Communication Co., Ltd.
20__ _ _ _ _ _ _ _
Item 5 Power of Attorney of Party A:
Party B:
Due to the need of engineering construction, Party A entrusts Party B to demolish the old office building of Jingui Industrial and Commercial Office. In accordance with the Contract Law and other relevant laws and regulations, following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached the following agreement through consultation:
I. Project Location:
Yongxing county Jingui town industry and commerce office hospital
Second, the way of contracting:
Lump sum contract method
III. Project scope:
Demolition of industrial and commercial office building
Iv. contents of the project:
Demolition of old office buildings, demolition, removal and cleaning of all buildings and ancillary facilities.
Verb (abbreviation for verb) Start time:
Completed on year, month and day.
The responsibility of both sides of intransitive verbs
(1) Party A's responsibilities:
1. Party A shall delimit the scope of the construction site to Party B, make technical disclosure to Party B, and provide necessary investigation cooperation and technical guidance, but Party B shall not be exempted from the responsibility for the project quality. Party B must carry out the construction within the scope specified by Party A. ..
2. Party A is responsible for the coordination with local people and villagers.
3, responsible for the supervision and inspection of the demolition of the construction site.
4. Responsible for the acceptance of the demolition site.
5. After the completion of the project meets Party A's requirements, Party A shall handle the settlement for Party B.
(II) Party B's responsibilities:
1. Enter the demolition site on time as required by Party A to ensure the smooth completion of the construction period. Be responsible for the demolition, removal and cleaning of all buildings and ancillary facilities listed in this agreement.
2. Party B shall guarantee continuous construction and ensure completion within the contract period.
3. Party B shall ensure the operation safety during the construction period. Party B shall be responsible for the safety caused by Party B or other reasons, and the expenses arising therefrom shall be borne by Party B. ..
Seven. Measurement and payment
1. project cost: this project adopts the general contract, and the old materials are owned by the constructor. This quotation includes tax, and the total price is RMB (in words:). Various factors such as site conditions are comprehensively considered, including labor, materials and machinery costs in the whole operation process, and construction-related costs such as construction materials (machinery) freight, which are paid for the contract project (process) to meet the quality standards according to technical disclosure. Anything not mentioned in this contract is deemed to have been included in the corresponding content in the table. During the performance of the contract, the contract price will not be adjusted regardless of the price fluctuation or policy change of labor, materials and machinery.
2. After the contract comes into effect, the project is completed and accepted by Party A's technical department, and Party A will settle the contract price in one lump sum.
Eight. supplementary terms
1. For matters not covered in this contract, both parties may sign a supplementary agreement through negotiation, and the supplementary agreement has the same effect as this contract.
2. In case of any dispute during the performance of this contract, Party A and Party B shall settle it through consultation according to the terms of this contract and relevant laws. If negotiation fails, it shall be decided by Yongxing County Labor Arbitration Commission.
3. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy.
4. This contract shall come into effect after the authorized agents of Party A and Party B sign or affix their official seals, and shall be terminated after both parties settle the project payment.
Party A (seal):
Party B (seal):
Signature of representative:
Signature of representative:
date
Item 6 Power of Attorney _ _ _ _ _ _ _ Co., Ltd.:
Your company signed an office handrail contract with our company, and now you are entrusted to pay RMB 10,000.00 Yuan to the following account:
Account name: _ _ _ _ _ _ _
Account: _ _ _ _ _ _ _
Bank of deposit: All economic disputes caused by Taiping Sub-branch of rural commercial bank after payment according to this account have nothing to do with your company, and all legal responsibilities arising therefrom shall be borne by our company.
Hereby entrust!
Project 7 Power of Attorney of the Client (Name):
Trustee's name: _ _ _ _ _ _ _, gender: _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Scope of entrustment: authorized personnel of our company: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The deposit for the building property service center construction personnel's pass is RMB (in figures). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ We entrust Luo Jinjiang to collect the above sum of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Authorized person (signature): _ _ _ _ _ _ _
Date: _ _ _ _ _ _
Client (official seal): _ _ _ _ _ _
Date: _ _ _ _ _ _ _ _ _ _ _ _ _
Project 8 Power of Attorney of the Entrusting Party (Party A):
Trustee (Party B):
Party A entrusts Party B to undertake the external wall painting project of the 6th, 7th and 8th floors of Shuanghu Bank. In order to complete the task with good quality and quantity, Party A and Party B have reached the following agreement through consultation:
1. Before signing this agreement, Party A shall provide Party B with detailed construction requirements and project descriptions.
II. Contents of authorization:
1. Material requirements: putty powder, pool paint and primer are all Qiu's;
2. Construction technology: scrape putty once, polish the pool once, coat primer once, and coat topcoat twice;
3. The cost of all exterior wall coating works is RMB per square meter.
4. Project payment settlement: After the project is completed, Party A will organize acceptance in time. After acceptance, the relevant departments of NQ7 Group will issue the engineering quantity, which will be settled in RMB per square meter after confirmation by three parties (NQ7 Group, Party A and Party B).
5. Safety and civilization: Party B shall be responsible for any safety and civilization accident on the construction site, and the expenses shall be less than RMB.
Three. Responsibilities and obligations of both parties
(I) Responsibilities and obligations of Party A
(1) Party A is responsible for checking the progress of the project and allocating the project funds according to the progress.
(2) Party A is responsible for sending technicians to conduct on-site construction guidance and technical supervision.
(II) Responsibilities and obligations of Party B
(1) Party B is responsible for organizing the construction team to enter the site for construction at the specified time, and ensuring that the construction task is fully completed before the specified completion time.
(2) Party B shall be responsible for the construction according to relevant technical specifications, and obey the on-site guidance and quality supervision of Party A's technicians.
(3) Except for irresistible natural disasters, Party B shall be responsible for the project quality and ensure the smooth acceptance.
(4) Party B must strictly abide by its reputation and ensure that it can be completed on time. If Party B fails to complete the project on time with good quality and quantity, Party A has the right to terminate the contract.
(5) Apply to Party A for acceptance in time after the project is completed.
(6) Party B must apply for work-related injury insurance for construction personnel before construction.
(7) If this Agreement is changed due to the needs of the project, Party A and Party B shall settle it through negotiation.
(8) Party A shall meet Party B's construction requirements, and all expenses arising from Party A's failure to meet Party B's construction requirements shall be borne by Party A. ..
(9) The entrustment period is from the date of signing the agreement to the date of project completion and acceptance, and the client in this power of attorney may not entrust it again.
Four. mode of payment
Party A shall pay the total cost of this project to Party B in RMB. During the construction period, Party A shall pay Party B's daily living expenses, 80% of the labor costs shall be paid when the workers leave the site after completion, and 95% of the total project funds shall be paid before the Spring Festival of 20__ (i.e.1October 65438+ 18), and all the project funds shall be settled within one year after the project acceptance.
Verb (abbreviation of verb) This agreement is made in duplicate, with each party holding one copy; It has legal basis and effect; Party B reserves the right of final interpretation.
Party A (seal): Party B (seal):
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Power of Attorney of Project 9: _ _ _ _ _ _, female, born in _ _, now living in _ _ _ _
Trustee: _ _ _ _ _ _, female, born on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
The relationship between the principal and the trustee is _ _. As the client is abroad, I hereby entrust the trustee with full authority to handle my notarization.
All relevant documents signed by the trustee in handling the above matters shall be recognized by the client, and all legal responsibilities shall be borne by the client voluntarily.
The trustee has no right to entrust.
The entrustment period ends when the entrusted matters are handled.
Principal: _ _ _ _ (signature)
May 3(rd), 2000
10 power of attorney for the project Party A: (the entrusting party):
Party B: (Trustee):
Voluntarily entrust the project construction task to (hereinafter referred to as Party B), and Party B will carry out the power distribution project construction.
Party B shall carry out the construction in strict accordance with the design scheme and relevant national construction standards. If Party A or the power supply department puts forward rectification opinions on the construction that is not in accordance with the design scheme, Party B shall immediately carry out rectification according to the design scheme until it is qualified.
This power of attorney is made in duplicate, one for each party.
It shall come into effect as of the date of signature, and this power of attorney will automatically terminate after the project is completed.
Matters not covered in this contract shall be settled by both parties through consultation.
Party A (signature): Party B (signature):
Date: Date:
Power of Attorney for the Project11_ _ _ _ Project Headquarters:
I hereby entrust _ _ _ _ _ _ _ _ _ (ID number: _ _ _ _ _ _ _) as the entrusted agent of our company to represent our company for _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Authorized Entrusting Unit: _ _ _ _ _ Legal Representative: _ _ _ _ _ _
Authorized Agent: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Power of Attorney for Project 12 I _ _ _ _ _ _ _ (name) am the legal representative of _ _ _ _ _ _ _ _ (name of head office), and I hereby authorize _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (name of branch office) to sign on behalf of our company.
The agent has no right to entrust, and hereby entrusts.
Agent: _ _ _ _ _ _ Gender: _ _ _ _ _ _ Age: _ _ _ _ _ _ _ _
ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Bidder (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal representative (signature or seal): _ _ _ _ _ _ _ _ _ _ _
Date of authorization: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;