B, fill in the soil layer and the design requirements of the bearing layer and geological survey report, can also be directly filled in the soil layer, such as 3-2 layers of clay.
C, dirty soil and organic matter whether to deal with?
D, the error of the actual elevation of the tank bottom compared with the design elevation.
You can print and sign by hand.