Current location - Quotes Website - Personality signature - How to write well the contents of the inspection record table of foundation groove
How to write well the contents of the inspection record table of foundation groove
A, fill in the axis range of foundation groove

B, fill in the soil layer and the design requirements of the bearing layer and geological survey report, can also be directly filled in the soil layer, such as 3-2 layers of clay.

C, dirty soil and organic matter whether to deal with?

D, the error of the actual elevation of the tank bottom compared with the design elevation.

You can print and sign by hand.