Party A:
Party B:
Party A has contracted two old houses with two floors to Party B for demolition, and both parties have reached an agreement as follows:
1. Party A will fully contract the demolition, clearing and foundation excavation of this house to Party B for responsibility. All the demolished old materials shall be owned by Party B, but the one-time discount 2 yuan shall be paid by Party B to Party A.. If Party A needs to get some materials back from it, Party B can give priority to selling the materials to Party A under the same conditions. After the demolition, Party B shall dig the foundation to a depth of 8 cm as required by Party A, and it will be completed after Party A's acceptance.
ii. when demolishing the old house, party b shall not charge any fees from party a, and the demolition period shall begin on February 16th, _ _ _ _ _ _ _ _ _ _ _. In case of rainy days or other irresistible natural factors, the construction period can be delayed as appropriate after consultation between both parties.
iii. after party b demolishes the house and digs the foundation, it must clean up the site without any residue such as brick slag, so as to ensure that the site is unobstructed.
iv. party b must do a good job in safety, and give safety publicity to the operators. Install a safety net or assign special personnel to be on duty during demolition to ensure the safety of passers-by, and at the same time ensure the safety of demolition workers and put an end to any safety accidents. In case of any loss, Party B shall be responsible and has nothing to do with Party A.. If the surrounding houses and other facilities are damaged, Party B shall be responsible for the compensation according to the price.
5. Other matters not covered shall be settled by both parties through negotiation.
this contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties.
party a (official seal): _ _ _ _ _ _
party b (official seal) : _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ And the interests of Party A and Party B will not be lost. Through negotiation, Party A and Party B specify the following terms:
1. Demolition scope: the civil parts and foundations of the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ii. ownership of materials: the steel bars and scrap iron in this project are owned by party b, and the bricks are purchased by party a from party b at a price of _ _ _ _ _ _ _ _ _ _ cents each.
iii. Demolition cost: Party A shall pay Party B _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
iv. safety responsibilities: all safety responsibilities shall be borne by party b.
5. payment method: after the construction site is completed, party a will pay the subsidized labor cost and red brick money in one lump sum on the spot.
6. This contract is made in duplicate, with Party A and Party B holding one copy respectively, and both parties shall abide by it. The contract shall come into effect after being signed by both parties.
signature of party a: _ _ _ _ _ _ _ _ _ _ _ _ _
signature of party b: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ In accordance with the principles of equality, voluntariness, fairness and good faith, the Regulations on Contract of Construction and Installation Projects, construction projects and other relevant laws and regulations have reached the following agreements on the provision of labor services and other matters in the construction of this project through consultation between both parties:
Article 1: General situation of the project
I. Name of the project:
II. Location of the project:
III. Demolition of concrete foundation and rubble foundation of original underground buildings, pool and concrete septic tank, removal of waste materials for transportation and disposal, etc.
Article 2: Scope of contract: all buildings in the area of about 4,5m2 of the original ground brick-concrete residential building in No.2 Courtyard, No.2 Service Office of Dujun District Administration.
article 3: construction period
1. date of mobilization: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. The total construction period is one month. In order to make the demolition project go smoothly, Party A shall pay Party B 3% of the total construction cost after signing the contract, and Party A shall pay Party B the remaining construction cost within 1 days after Party B's demolition is completed. The removed steel bars and usable bricks belong to Party B..
article 4: disputes
in case of any dispute between party a and party b, it shall be settled through consultation with the purpose of friendly cooperation. This contract is made in duplicate, signed and sealed with the same legal effect.
the conclusion date of this contract is _ _ _ _ _ _ _ _ _ _ _ _ _ _
Employer:
Contractor:
________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law of the People's Republic of China, the Regulations on the Contract of Construction and Installation Projects, construction projects and other relevant laws and regulations, following the principles of equality, voluntariness, fairness and good faith, both parties have reached an agreement on the relevant labor services in the construction of this project. The following agreements are reached:
Article 1: General situation of the project
1. Name of the project: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Location of the project: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. The house is demolished to the terrace, and the foundation is demolished to all masonry and cushion layers below .. After the demolition, Party B shall, according to Party A's requirements, restore the demolished site to conditions that will not affect the construction of new buildings.
article 3: construction period
1. mobilization date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
article 4: contract price, payment and settlement of project funds
1. the fees paid by party a to party b shall be calculated as _ _ _ _ _ yuan/car (each car shall be loaded with no less than _ _ _ _ cubic meters).
second, when the project is completed, party a will pay all the project fees.
article 5: safe construction
1. party b shall take strict safety protection measures according to relevant regulations, and bear the responsibility for accidents caused by its own ineffective safety measures and the expenses incurred therefrom.
2. Before entering the site, strictly inspect whether the machinery can enter the construction site, and the operators must insure themselves. Party A will not pay separately. Party B shall abide by the operating procedures, carry out construction on the premise of ensuring safety, and prohibit illegal operation. Party B shall be fully responsible for the safety accidents caused by Party B..
iii. in case of a major accident, party b shall immediately report it to the relevant departments and notify the representative of party a according to relevant regulations. At the same time, according to the relevant requirements of the government.
iv. before the construction of power equipment, high-voltage lines, underground passages, lots and streets near traffic arteries, Party B shall conduct the construction after repeated argumentation and confirmation; At the same time, Party A shall arrange professionals to cooperate.
this contract is made in quadruplicate, each party holds two copies, and the signature and seal have the same legal effect.
employer: _ _ _ _ _ _ _ _ _ _ _ _ _ _
contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Through consultation between both parties, in order to clarify the responsibilities of both parties and ensure the smooth progress of house demolition, the contract is signed as follows:
1. House demolition project:
1. Scope of house demolition project:
2. The construction area of the house to be demolished is about square meters, which shall be settled at the unit price determined in this contract.
ii. contract price:
it is determined that the unit price of the demolished house construction area is 8. (eighty-eight) yuan square meters, totaling 48,. yuan, in words: forty-eight thousand yuan only.
payment method:
Party B shall make advance payment and pay it off within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
III. Contract time limit:
1. The house demolition of this project starts on, and the demolition time limit is completed within _ _ _ _ days after the demolition time is determined. In special circumstances, it shall be negotiated separately when signing the contract.
2. In case of force majeure during the construction period, both parties can extend the construction period through negotiation.
IV. Liability for breach of contract:
1. The house demolition project undertaken by Party B shall not be subcontracted. If it is discovered, Party A has the right to terminate the contract, and Party B shall bear all economic and legal responsibilities for the losses caused thereby.
2. After Party A delivers the key to the demolished house of Party B's single building (structure), Party B shall immediately organize personnel to enter the site for construction. If Party B fails to organize personnel to carry out construction within three days, Party A shall deduct the penalty 1 yuan; If Party B fails to organize personnel to enter the site for construction within seven days, Party A will deduct 3, yuan from Party B's liquidated damages, and arrange another construction team to enter the site for construction, and the required house demolition expenses will be borne by Party B..
v. this contract shall come into effect after being signed and sealed by both parties.
VI. This contract is made in duplicate, with each party holding one copy.
party a:
party b:
________ _ _ _ _ _.