Current location - Quotes Website - Personality signature - How to write the engineering quality inspection report of the design unit well
How to write the engineering quality inspection report of the design unit well
It is in the form of a table. How to answer? /I will copy the table and see what is displayed in it myself.

GD3006

Housing construction engineering

Quality inspection report of design documents

Project Name: Tax Service Building of Hongmei Branch of Dongguan State Taxation Bureau.

Designer (official seal): Guangdong Fanghua Engineering Design Co., Ltd

Issue date: May 22, 2008

1

Fill in and explain

1. The design unit is responsible for printing and filling in the quality inspection report of design documents and submitting it to the construction unit.

2. Fill in the requirements with true content, concise language and clear handwriting.

3. Where you need to sign, you should print your name first, and then sign it yourself.

4 design document quality inspection report in quadruplicate, one for the design unit, the construction unit, the monitoring station and the filing authority.

2

The name of the project "Tax Service Building of Hongmei Branch of Dongguan State Taxation Bureau" is reasonable.

Service life "is 50 years.

The full name of the design unit is Guangdong Fanghua Engineering Design Co., Ltd.

Zizhino 19 12 10-SJ

"Project scale (building)

Area, floor, etc. "The tax service building of Hongmei Branch of Dongguan State Taxation Bureau has a construction area of 4,700 ㎡ and a frame structure of seven floors.

The approval document number of construction drawing review of Dongguan Daye Construction Technology Consulting Co., Ltd. is DY20055498.

"Each major is mainly

Designer's name

Single (name,

Profession and practice

Qualification number,

Title) "Name, professional qualification certificate, title.

Dong Jianshe191210-003 Class I registered architect.

Ye Zhenguo Structure191210-S008 Class I Structural Engineer

"knot

build

set up

count

about

special

Point ""1, this project is a frame structure, and the seismic grade of the frame is Grade III.

2. The building seismic fortification is classified as Class C, the fortification intensity is 7 degrees, the site category is Class III, and the foundation design level is Class B. ..

3. The structural safety level of this project is Grade II, and the designed service life is 50 years. "

three

Inspection of serial number inspection content

1 Basis for compiling design documents

2 "Does the design document meet the requirements of project planning, bidding and materials?

Equipment procurement, non-standard equipment production and construction requirements "

3 Has the design document indicated the reasonable service life of the project?

4 "Whether the materials, accessories and equipment selected in the design documents have been

Indicate specifications, models, performance and other technical indicators. "

5 "Adopt new technologies and materials without national technical standards.

Whether it has been approved by the relevant departments of the state or province "

6 "Whether the design documents meet the mandatory standards for engineering construction,

Quality requirements agreed in the contract "

7 "Has the design document been submitted to the construction and supervision unit?

Technical disclosure "

8. Whether the signatures and signatures of design documents are complete.

9 "Does the project meet the requirements of design documents and design changes?

Is the content realized in the project? "

Inspection conclusion:

Project leader (print): (signature):

Technical person in charge of the unit (print): (signature):

Design unit (official seal):

Date of Issue: Year Month Day

four