First, the bright card construction. Hanging urban road excavation permit and urban road temporary occupation permit at the construction site.
Second, enclosure construction. According to Sui Jianzhi's document [20xx] 1335, in rail transit engineering, the height of the fence is ≥ 2.5m, the height of the corner is ≥ 50cm, and the distance between the wall columns is ≤ 3m. Tiles are attached to the ends of the footings and columns, and brick walls with a thickness of 18cm are built with glazed tiles. The color of the brick walls is red in the subway, and the walls are plastered with mortar. Install circular energy-saving lamps at the top of column caps every 6 meters: for municipal engineering, water engineering and demolition engineering whose construction period is less than half a year and more than 15 days, the enclosure height is ≥2.5 meters, the spacing between steel columns is ≤3.3 meters, and the top of fence column is shaped. Install circular energy-saving lamps at the top of every other column, and reinforce the blank holders at the four sides of each unit: municipal projects with a construction period less than 15 days.
Neatly arranged, adjacent units are buckled, and the enclosure of adjacent motor vehicle lanes is provided with night reflective warning signs according to relevant traffic management regulations; Near the motorway project, set up finished cast iron or steel crash barriers, and set up reflective warning signs according to traffic regulations at night;
Third, construction on time. Strictly follow the approved construction plan, and rationally allocate human machines and tools to avoid construction during peak and busy hours.
Four, the construction site set up obvious traffic guide signs, set up warning lights at night. For projects that have a great impact on vehicles and pedestrians, in addition to taking traffic diversion measures, special personnel should also be assigned to assist the public security traffic management department in traffic diversion. Repair the roads within the construction scope in time to ensure the traffic safety and smoothness within the construction scope.
Five, construction materials, machines and tools to visit shall not exceed the scope of enclosure, temporary occupation of the construction site shall not be placed has nothing to do with the construction of living facilities. If temporary facilities such as warehouses and temporary offices need to be set up in large-scale construction sites, they should be set up at approved locations without affecting traffic and pedestrians, but temporary facilities such as bamboo and wood structures that affect urban landscape are not allowed.
Six, large machinery construction work as far as possible in the evening 10: 30 before, and take effective measures to reduce construction noise and dust.
Seven, construction mud removal in time, mud piled up no more than 24 hours, the key sections should be removed immediately. Vehicles carrying bulk materials and construction waste must pass the qualification examination and hold a permit, and shall not be discharged into the road, so as not to affect the city appearance and traffic safety. Other facilities damaged during the construction period and within the construction scope, the construction unit and the construction unit shall be liable for restoration or compensation.
Eight, the above construction measures, promise to do self-inspection every day, and consciously accept the supervision and inspection of the municipal management department, the public security traffic management department, and the comprehensive law enforcement department of urban management. If it is.
Violation, in addition to rapid correction, and accept the punishment of law enforcement departments in accordance with relevant laws and regulations. If traffic personnel, vehicles and other property losses are caused by improper protective measures for construction operations or inadequate management responsibilities, the construction unit and the construction unit shall be liable for compensation according to law.
Nine, this excavation project affects six kinds of public pipelines, and solicit opinions from relevant pipeline units. For details, please refer to Table of Opinions on Urban Road Occupation and Excavation Pipeline Protection. If the construction unit finds that the excavation project of this bid involves the attributes of public pipelines, and the opinions are not true, resulting in safety accidents or loss of personnel and property, the construction owner unit shall bear all the responsibilities.
Owner: seal
Construction unit: seal
Person in charge: person in charge:
Temporary Project Construction Application Form and Letter of Commitment Model 2 Sichuan Baguangyu Expressway Development Co., Ltd.:
Our department is responsible for the construction of contract section (K ~ K) of Bazhong-Nanchong-Guang 'an (Sichuan-Chongqing boundary) (Bananguang for short). root
According to the needs of the project, the number of acres of land in counties, towns (townships) and villages will be temporarily occupied for a period of year/month (i.e. from year, month and day to year, month and day).
Our department promises to your company that the required temporary land will be improved according to the regulations of the county land and resources bureau, and relevant trees and other appendages will be compensated in place; During the period of temporary land use, our department is responsible for the water and soil protection and safety protection of temporary land use; After the completion of the project, our department is responsible for the reclamation of temporary land. If the reclamation is not implemented or fails to meet the reclamation standards, your company will deduct the corresponding reclamation fee from any funds.
I hereby promise.
Ba' nan-guang expressway projects department
20xx year x month x day
Model Letter of Commitment for Temporary Works Construction 3 Jiangning District Public Security Fire Brigade:
Our company's safety objectives for the first phase of Hohai University Freshmen's Living Group Project are: the frequency of minor injuries: 0.02%; Put an end to major liability casualties; No traffic accidents and fire accidents; Safety facilities and safety publicity meet the standards set by Nanjing Municipal Government, and make the following commitments:
A, commitment during the construction period, in strict accordance with the requirements of the supervision company and the construction unit, in accordance with the content of the "building construction safety inspection standards" and "construction permit", clear safety responsibility, do a good job in construction organization design and construction safety technical disclosure, obey the daily management and inspection of the supervision, construction unit and relevant municipal departments.
Second, promise to carry out safety education for the construction personnel of this unit, have a sound safety management system and training and education records, and ensure that the construction personnel do not violate the site management regulations and national laws and regulations. Cooperate with the daily management and inspection of the supervisor, the construction unit and the relevant municipal departments.
3. When handling the construction permit, submit the copy of the certificate of special operation personnel and the ID card of the construction personnel of the unit to the relevant departments for the record, and handle the "temporary construction permit" as required. And accept the daily management and inspection of the supervision, the construction unit and the relevant departments of the city, and the documents for entering and leaving the construction site are complete.
Four, to ensure that the scene does not happen fire safety accidents, set up a person in charge of on-site safety, explain to the relevant departments of the city the guarantee of construction fire safety work and the implementation of the construction plan, and ensure the safety of construction personnel, companies, construction units and third-party personnel and property.
Five, supervision, construction units and relevant departments of the city inspectors found that there are major unsafe reasons.
Have the right to ask us to stop work and rectify at any time, and shall not continue to illegally and forcibly operate.
Six, promise not to affect the surrounding personnel, health and environmental safety during the construction period, be responsible for all the adverse effects caused by the construction personnel of this unit, and take safety precautions such as electricity safety and fire safety.
The above is my unit's safety commitment to this project. If we fail to meet Party A's requirements and our commitment standards in the construction process, we are directly responsible for the safety problems in the construction process, and we are willing to accept the punishment. If the circumstances are serious, they are willing to accept the punishment of laws and regulations.
Hereby promise!
Legal representative of the construction unit (seal):
date month year
Model of Temporary Works Construction Application and Letter of Commitment IV Commercial Building Decoration and Temporary Construction Approval Construction Letter of Commitment In order to ensure the integrity and safety of the overall urban landscape in Dushanzi area, safeguard the legitimate interests of merchants and citizens, and maintain the cleanliness and beauty of public places and facilities, during the decoration construction period, the commitments are as follows:
First, don't change the building structure, design purpose and layout without authorization. If you need to change the direction of water pipes and wires, you should apply for approval in advance. The load-bearing walls, beams, columns, floors and balconies inside and outside the building have not been removed or illegally built.
Two, shall not occupy and damage the stairs, passages, roofs, platforms, roads, motor vehicles, non-motor vehicles and other public places, places and facilities. No public facilities such as power supply, water supply and drainage, gas supply, communication and fire fighting shall be damaged, dismantled or modified without authorization.
Third, don't build and paste pictures. Do not carry out projects that damage public facilities, and ensure the aesthetic unity of property appearance and public decoration. There is nothing posted or erected on the front of the building except the plaque at the door.
Four, do not use toxic and polluting decoration materials. Decoration garbage shall not be scattered, misplaced, and removed from the site in time, and the environment shall not be affected during transportation. Scattered garbage should be cleaned up in time. Building materials, equipment and construction personnel shall enter the site at designated entrances and exits. Construction personnel should register for admission every day and don't stay at the construction site.
5. During the construction period, it will not affect the rest of nearby residents and the normal office of the enterprise. The construction with high noise will be arranged on weekends and after work (9:30) and before work (19:30).
Six, construction waste, yellow sand, cement and other bulk materials must be transported in bags, without the permission of the competent department of construction, construction waste and materials shall not be piled up on public land. Damaged public facilities should be compensated according to the price.
Seven, the construction of pipeline blockage, water leakage, power failure, falling and fire, etc. , resulting in the loss of public facilities, equipment and the interests of others, to give timely repair and compensation.
Eight, the decoration site must be reasonably closed to reduce dust and noise. Fireworks are strictly prohibited in the construction site, and an application should be made to the property management office when welding is used in the construction.
Nine, if there is any influence on the interests of nearby residents and enterprises in the process of decoration, the opinions of nearby residents and enterprises should be solicited in advance, and the opinions should be reported to the competent construction department; If there are complaints from nearby residents and enterprises about renovation, they should immediately stop work for rectification.
Ten, keep the house number intact, do not alter, cover, shift, destroy the house number, so that the house number is consistent with the house number. When rebuilding or decorating the facade, properly keep the house number plate, and put the plate back in its original position after the decoration is completed. Keep the house number properly to prevent it from being damaged or lost. If there is any damage or loss, report it to the District Geographical Names Office (3688 180) in time, and go through the supplementary procedures (at your own expense).
Eleven, in case of urban planning and construction needs, to ensure that the demolition or repair in accordance with the requirements of the administrative department of construction.
12. If the required information cannot be provided completely due to the reasons of the applicant, the subsequent related problems shall be borne by the applicant and solved by coordination.
Thirteen, the declared information and materials are true and accurate, and the examination and approval procedures are handled in strict accordance with the procedures and implemented in accordance with the approved plan. Be willing to bear the corresponding legal responsibilities and losses if you violate the promise or false promise.
Our unit (individual) confirms and guarantees to abide by the above terms. If there is any violation, the administrative law enforcement department has the right to deal with it and make corrections and compulsory rectification within a time limit. Including stopping water supply and power supply, and even prohibiting admission. Construction can be started only after the shutdown and rectification are completed.
Commitment:
Commitment Start: Year, Month and Day
Temporary Works Construction and Letter of Commitment Mode 5 Sha Tin Planning and Construction Office:
Our unit promises:
1. When this building conflicts with the urban planning and construction, it is guaranteed to dismantle all buildings free of charge, unconditionally and within a limited time according to the requirements of the planning and construction department, and return the land to the land ownership unit for use.
2 offices, dormitories, kitchens, toilets, bathrooms and other temporary facilities. Temporary houses with concrete hard bottom, brick walls, light steel roof trusses and profiled steel plates, or mobile houses in the form of prefabricated houses and containers should be set up at the construction site. The external scaffold for construction shall be erected with double-row steel pipes, and the maximum vertical distance of the vertical pole shall not exceed 2m. Otherwise, consciously accept the rectification of your office shutdown.
3. Flame-retardant dense mesh safety net shall be adopted to ensure smoothness, tightness, no leakage and looseness, and TN-S system shall be adopted for electricity consumption to achieve three-level distribution and two-level protection. Otherwise, consciously accept the rectification of your office shutdown.
4. This unit also promises to complete the relevant procedures of construction land planning permit, construction project planning permit and construction project planning permit within one year from the date (subject to the application for construction by Dongguan Planning Bureau and Dongguan Construction Bureau). If the above procedures are not handled within this time limit, the punishment will be strictly in accordance with the Regulations on Punishment of Illegal Construction in Dongguan issued by Dongfu [1998] No.38.
Signature (seal) of the project manager of the construction unit: year month day.
Signature (seal) of the legal person of the construction unit: year month day.
Signature (Seal) of the Secretary (or Director) of the Village Committee: Year, Month, and Day.