Current location - Quotes Website - Personality signature - Commitment letter of civilized construction
Commitment letter of civilized construction
In our daily life and work, we have more and more opportunities to use the letter of commitment. If this letter of commitment is approved by the contract, it can be performed as a part of the contract. I believe many friends are very upset about writing a letter of commitment. The following are seven civilized construction commitments I have compiled for your reference only. Welcome to reading.

Commitment to civilized construction 1 article 1. The following responsible persons shall bear the responsibility for production safety according to their respective responsibilities:

The legal representative of the construction unit, the legal representative of the construction unit and the legal representative of the supervision unit are the first responsible persons for the civilized construction of production safety;

The builder of the construction unit is the person directly responsible for the civilized construction of project safety production;

The project director of the supervision unit undertakes the supervision responsibility of the civilized construction of project safety production.

Second, strictly abide by the "Construction Law", "Safety Production Law", "Regulations on Safety Production Management of Construction Projects", "Regulations on Safety Production License" and other laws and regulations.

Third, improve the safety management system.

Implement various safety management measures, strive for no fatal accidents, serious injuries, poisoning accidents, fire accidents and collapse accidents, and the qualified rate of safe production and civilized construction reaches 100%.

Four, in strict accordance with the following requirements to standardize the civilized construction behavior of production safety:

1. The construction contract stipulates the total cost of safety protection and civilized construction measures, as well as prepaid expenses, payment plan, use requirements, adjustment methods, etc. Timely review and sign the expenses incurred by the safety protection and civilized construction measures implemented by the construction unit.

2. Make clear the management objectives of safe production and civilized construction in the construction and supervision contracts, and explicitly encourage striving for provincial and municipal demonstration sites for safe production and civilized construction of housing projects. Won the provincial and municipal housing project safety production civilized construction demonstration project clear reward, safety production civilized construction unqualified shall be punished.

3. Implement the traffic safety responsibility system in strict accordance with the Document Notice of Zhuhai Public Security Bureau on Joint Meeting System and Traffic Safety Responsibility System (Zhu Gong Fa [20xx] No.300), and the construction unit and the project management department sign the responsibility book of target management to prevent traffic accidents, educate and urge the construction personnel to strictly implement the Road Traffic Safety Law of the People's Republic of China.

4, the implementation of national, provincial and municipal regulations and policies on flood control and wind prevention, organize the formulation and improvement of flood control and wind prevention plans. In case of possible tropical cyclone or heavy rain and flood, the person responsible for flood control and wind prevention should personally go to the front line to check and implement various defensive measures; In flood season construction, vehicles, routes and resettlement sites for personnel transfer must be implemented; In case of an engineering accident, organize personnel to fully rescue, report to the superior in time, and do a good job in the safe transfer of people in distress to avoid casualties and minimize disaster losses.

5. The safety management data of this project adopts the unified table of building safety management data of Guangdong Province.

6. Implement the "safety card" management system, strengthen the safety education and training of front-line construction workers, and establish information records such as personal basic information of front-line workers and safety training.

7. Insure accident insurance according to regulations.

V. Implement safety measures according to the following standards:

1, strictly abide by the Standard for Safety Inspection of Building Construction (JGJ59-20xx) and related specifications.

2. The goal of safe production is clear, the system is perfect, the information is complete, the responsibility for safety lies with people, and the safety measures are implemented.

3. Set up the site safety sign layout general plan, and hang the safety sign according to the general plan.

4, pays special attention to the safety level 3 education and daily safety accident prevention education, special operations personnel do show certificates.

5. Construction electricity is standardized. TN-S system is adopted to achieve "one machine, one brake and one leakage box", and standard electrical boxes are used, and qualified products such as wires, switches and leakage protectors are used.

6. Set up external scaffolding according to the specifications, use the safety net that has passed the inspection, do a good job in the protection of "four mouths and five faces", and clarify the person in charge of protection on each floor.

7, the use of qualified mechanical equipment, material hoist (tic-tac-toe, gantry), construction external elevator, tower crane, pile machine installation and disassembly scheme, acceptance and testing procedures are complete. No windlass with no protective cover, expired and no safety device shall be used, and an independent unloading platform shall be set up as required.

8, improve the fire prevention system, the implementation of fire prevention measures, equipped with enough fire prevention equipment, do not use electric stove, gas stove, etc. In the dormitory, not living or working in the building under construction.

9, according to the provisions of the preparation of special special operation safety organization design or scheme, organize experts to demonstrate.

Six, according to the following standards to implement civilized construction measures:

1, do a good job in civilized construction according to the Safety Inspection Standard for Building Construction (JGJ59-20xx) and the civilized construction inspection scoring standard of the Provincial Housing and Construction Department.

2, the construction site closed management, walls, doors, solid and beautiful, write the name of the enterprise and project on the lintel.

3. The construction site layout is reasonable and standardized, with seven signs and one map, complete signs and neat and beautiful hanging.

4. Main roads, entrances and exits, material yards, dormitories, offices, warehouses, kitchens, toilets, etc. The construction site should be hardened; The construction site is clean, tidy and well drained; Materials should be classified and stacked, neat and orderly, and marked with specifications.

5. The dormitory adopts brick wall and iron roof or other safe and practical metal structure trailer, without asbestos tile and bark.

6, set up a car wash tank at the entrance to the construction site, wash away the vehicles leaving the construction site, to prevent environmental pollution.

7, diet and water meet the hygiene standards, meals are cooked separately, the kitchen is equipped with screen doors and screens, kitchen hygiene license and chef's health certificate.

8, adhere to the civilized construction, do a good job in the community around the construction site, do not cause complaints or disputes of the surrounding residents.

Seven, in violation of the provisions of this letter of commitment, safety civilized construction inspection unqualified or safety hazards, production safety accidents, voluntarily accept the following penalties:

1, accepted the order of the municipal (district) construction engineering safety supervision station to suspend the construction rectification.

2, accept the city (District) construction engineering safety supervision station to the construction, supervision enterprises and related responsible personnel dynamic points and other penalties.

3. Accept the administrative penalties made by the Municipal (District) Housing and Construction Bureau in accordance with the law, such as stopping undertaking tasks, temporarily withholding the safety production license, suspending the qualification of the construction engineer (project manager) and the person in charge of the project, and imposing fines on the responsible party and person.

Eight, this letter of commitment in quintuplicate, the city (District) Housing and Construction Bureau, the city (District) construction engineering safety supervision station, construction, construction and supervision units each keep one copy.

Nine. This letter of commitment shall come into effect as of the date of signature and seal by all parties.

Attachment:

1, payment plan for safety protection and civilized construction measures

2. Safe production conditions before construction.

Construction unit (official seal):

Legal representative (signature):

Date, year and month

Construction unit (official seal):

Legal representative (signature):

Architect (signature):

Date, year and month

Supervision unit (official seal)

Legal representative (signature):

Project leader (signature):

Date, year and month

Commitment of Civilized Construction 2 In order to further strengthen the dust control work on the construction site, implement the civilized construction management responsibility of the project department and improve the civilized construction management level of the contractor, this project makes the following commitments on civilized construction management:

1. This project has established the responsibility system of dust control and site cleaning with Jiangsu Shuanglou Construction Group Co., Ltd. (the main body) as the construction unit and all contractors working together. If the main construction unit is not determined, during the pile foundation construction, the construction unit of Jiangsu Geotechnical Engineering Company (pile foundation) will be the overall responsible unit, and other contractors will cooperate to implement the responsibility system for dust control and site cleaning. After the pile foundation construction and before the earthwork excavation, the construction unit shall promptly determine a major construction unit as the overall responsible unit, re-sign this letter of commitment, take the lead in handover, and report it to our station for the record.

Second, the scope of management of the overall responsibility unit

1. Set up enclosure according to regulations, establish guard system, manage by special personnel, implement closed construction management, and conduct patrol inspection on the integrity and cleanliness of enclosure.

2, according to the provisions, set up vehicle washing device, equipped with washing equipment, arrange special personnel to wash the vehicles entering and leaving the site, to ensure that the vehicles are on the road without mud.

3. Dust suppression measures should be taken in the site within the scope of construction work. During the construction of multiple units on site, the public roads on site should be cleaned and dusted, and measures should be taken to suppress dust by sprinkling water.

4, in accordance with the provisions, do a good job in front of the three bags of cleaning.

5. When the main construction unit or the general contractor is the overall responsible unit, it is responsible for the civilized construction management of the final stage of this project and the supporting project construction.

Three. Liability agreement of relevant units

1, in this project, the construction unit is determined as the organization responsible unit for dust control work on site, and the project leader is the first responsible person. The overall responsible unit is responsible for the implementation of dust prevention work on site, and the project manager is the first responsible person. The supervision unit is the responsible unit for dust prevention work on site, and the project leader is the first responsible person.

2, the overall responsibility unit to ensure the full use of civilized construction measures.

3, supervision units to strengthen the on-site inspection of civilized construction management, found that the problem in a timely manner to the overall responsibility of the unit.

Make rectification and report to the construction unit. If the overall responsibility unit fails to rectify in time, it shall report to the supervision institution or the relevant department.

Fourth, specific work measures

1. The enclosure on the construction site is continuously set around the construction site, and hard materials such as masonry and metal plate are selected without gaps; The enclosure height shall not be less than1.8m; ; The enclosure of stations, squares and construction sites that affect the city appearance and landscape in the urban area shall not be less than 2.5m, and the maximum shall not exceed 3.5m..

2. It is forbidden to pile up loose materials such as soil, sand and gravel, scaffolding steel pipes and templates. On the outside of the retaining structure, it is forbidden to use the retaining structure as a retaining wall.

3. The entrance and exit of the construction site shall be provided with a standard washing table, equipped with high-pressure washing facilities, and a perfect vehicle washing system shall be established. A vehicle cleaning account shall be established, and a designated person shall be responsible for cleaning. All vehicles can only be driven out of the construction site after the wheels and baffles are cleaned.

4. The entrances and exits of the construction site and the main roads should be hardened, and sprinkling or spraying measures should be taken regularly, and the road surface should be cleaned by special personnel. If necessary, you can rent a dust truck to clean the dust around the road and the door of the construction site.

5, it is forbidden to burn all kinds of waste on the construction site.

6, timely removal of construction waste, engineering residue; If the removal cannot be completed in time, a temporary dump shall be set up at the construction site, and dust-proof measures such as enclosure and coverage shall be taken for the temporary dump; Measures such as covering, maintenance or greening should be taken for earthwork piled up in exposed sites and construction sites.

Chief Engineer of Nanjing Suning Construction Supervision Co., Ltd.:

Jiangsu shuanglou construction group Yifeng garden projects department

Project leader:

date month year

Commitment 3 of Civilized Construction (1) When submitting the design documents that need to be completed by the contractor as allowed by the design qualification level and business scope,

Time: On the premise that the construction period will not be affected, the contractor must provide relevant design documents 30 days before the commencement of the project requiring secondary design.

(2) Name and completion time of plans and statements provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report the project progress report (including monthly image progress, project settlement fee and monthly project price list) completed in that month to the supervisor, owner and agent construction unit (as of 20th of that month) and the construction progress plan, quantity plan and capital use plan for next month in quadruplicate.

(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor shall be responsible for all the work and bear all the expenses, and all the consequences arising therefrom shall be borne by the contractor.

(4) Requirements for office and living rooms and facilities provided to the owner: provide 2 on-site office rooms, each of which is 20 square meters, with 4 sets of office tables and chairs, 1 set of filing cabinets; 40 square meters meeting room 1 room, meeting tables and chairs 1 set; There are 2 on-site dormitories, each 20 square meters, each with 4 beds. The above expenses have been included in the total contract price.

(5) Relevant procedures for traffic, sanitation and construction noise management on the construction site that need to be handled by the contractor: The contractor is responsible for handling according to the relevant regulations of Xiamen, and bears corresponding responsibilities, and its expenses are implemented according to the relevant regulations, which have been included in the total contract price and used as lump sum.

(6) Special requirements and expenses for finished product protection of completed projects: Before the project is handed over to the Employer, the contractor shall be responsible for protection. During the contractor's protection, if the completed project is damaged, the contractor shall be responsible for repairing it and bear the corresponding expenses; If the Employer uses the completed project that has not been handed over in advance, causing damage to the project, the Contractor shall do a good job of repair in time, and the relevant expenses shall be borne by the Employer.

(7) Requirements and expenses for the protection of underground pipelines and adjacent buildings and structures (including buildings for cultural relics protection) and ancient and famous trees around the construction site: The contractor shall be responsible for protecting the buildings and structures around this project, and this part of expenses shall be included in the contractor's total tender offer. For the protection of underground pipelines and ancient and famous trees around the construction site, the contractor shall submit a protection plan, which shall be well protected after being approved by the engineers and supervision engineers stationed by the Employer. The protection fee shall be borne by the employer after it is approved by the employer. If the damage is caused by the contractor, the repair cost shall be borne by the contractor.

(8) Cleanliness and hygiene requirements of the construction site: The contractor shall ensure that the cleanliness and hygiene of the construction site conform to the relevant regulations of Xiamen and the requirements of civilized construction, and strictly abide by the management regulations on engineering quality, safety and civilized construction of the comprehensive service building of Automobile City during the construction process, so as to achieve safe and civilized construction; In accordance with the provisions, set up car washing slots and other facilities at the entrances and exits of vehicles in the venues; Before the completion of the project, clean up the site to meet the requirements of municipal environmental sanitation and ensure the cleanliness of the construction site. The expenses incurred shall be borne by the contractor, and the losses and fines caused by the contractor's violation of relevant regulations shall be borne by the contractor.

(9) Other work agreed by both parties that the contractor should do:

A, due to the underground pipeline information provided by the employer to the contractor is only provided by the urban construction archives, the contractor shall verify the authenticity of the information, and the contractor shall be responsible for all problems caused by the contractor's failure to verify clearly.

B the contractor shall effectively protect the leveling points, coordinate points and control points provided by the employer. In case of any damage or loss during construction, the Employer shall contact the original lofting unit for replacement, and the expenses incurred shall be borne by the Contractor.

C, if necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, communication, network and other departments.

D, in a timely manner to the Xiamen municipal construction administrative department for project construction and construction procedures, to ensure the timely start.

E, the contractor must be responsible for coordinating the local relations around, to ensure the smooth completion of the project, all consequences caused by the adjacent relationship shall be borne by the contractor.

F, temporary land, occupied roads and temporary water and electricity needed in the construction shall be handled by the contractor and bear the corresponding expenses. The contractor is responsible for protecting the water meters and meters handed over by the Employer, and paying the water and electricity charges on time as agreed in this contract.

G. The projects contracted by the Employer alone include: municipal, power supply, water supply, gas, greening, cable TV, communication, video intercom, elevator and other professional projects. The contractor is responsible for the general contracting management and cooperation during the construction period, and its general contracting management fee and cooperation fee have been included in the total contract price. During the construction period, the contractor shall not charge the general contracting management fee and cooperation fee from the employer, and the contractor shall be responsible for providing vertical transportation and cooperation with related disciplines (excluding elevator scaffolding). The utilities used by the above subcontractors shall be collected by the contractor from the relevant subcontractors, and the owner shall provide assistance.

Commitment letter for civilized construction Article 4 Construction unit: Wuhan Gas Thermal Power Group Company

Project name: greening project in front of Anshan natural gas gate. In order to implement the responsibility system for safe and civilized construction and ensure the safe operation and civilized construction requirements of field workers, the following commitments are made:

1. Actively participate in the publicity and education of safe and civilized production and construction, and consciously implement the policy of "safety first, prevention first".

2, abide by the responsibility system for production safety, safety and civilized operation procedures, safety and civilized production management system, obey the safety guidance, and earnestly achieve civilized construction.

3, special type of work must hold relevant certificates, abide by job specifications.

4. Colleagues should unite and cooperate, help each other and supervise each other, so as to achieve "three no harm" (no harm to themselves, no harm to others, no harm to others).

5. Abide by discipline and have the right to stop others from directing, operating or refusing illegal command.

6, completes the construction site, living quarters, dormitory hygiene and food hygiene, to prevent diseases and food poisoning.

7. Report potential safety hazards in time and take effective remedial measures decisively.

8, seeking truth from facts, put forward reasonable suggestions conducive to safe and civilized construction.

Wuhan anju xingye construction co., ltd

date month year

Letter of Commitment for Civilized Construction Article 5 In order to further strengthen the management of safe production and civilized construction, the construction unit and the project department should establish and improve the management systems, safety measures, civilized construction measures and construction waste disposal measures for safe production, civilized construction and closed transportation of bulk building materials. The construction project shall ensure the effective investment of various measures and capital expenses, and the construction supervision shall strictly supervise the construction unit and earnestly do the following work:

1. A solid, beautiful, environmentally-friendly or landscape-creative closed enclosure (fence) must be set up at the site of the construction area in accordance with the Standard for Safety Inspection of Building Construction (JGJ59-99), and the height shall not be less than1.8m. A neat and strict dense mesh net or safety net must be set outside the building for closed construction.

2. The gatehouse must be set up at the gate, the enterprise logo should be set up at the entrance and exit, and the car washing platform, car washing equipment and garbage sedimentation tank should be set up, so that there is no leakage and pollution in and out of the net car.

3. The main construction roads and yards must be hardened with concrete, hardened with solid materials or afforested. The reserved land and construction waste must be transported in corresponding containers or pipelines, piled up in a centralized way, and covered or regularly sprinkled with water to control dust. It is forbidden to throw objects in the air.

4, it is forbidden to burn all kinds of waste in the construction site.

5, the site must be reasonable arrangement of drainage facilities, drainage to unobstructed, can not have water phenomenon.

6. The site and its surroundings must be kept clean and tidy, and materials should be stacked in an orderly manner.

7, living quarters and construction areas should have obvious isolation measures, dormitory and site canteen settings must meet the specified requirements, and meet the safety conditions and health standards.

8, in order to ensure the construction on time, not on-site mixing concrete, do not produce noise nuisance, noise equipment should be set in the work area to reduce the volume.

9, the construction site environmental maintenance and hygiene standards must be strictly implemented (JJ146-20xx) standards and the Ministry of Health and the Ministry of Construction "Notice on Further Strengthening the Hygienic Management of the Construction Site Canteen" (Wei Jianfa [20xx] No.94).

10, the construction waste generated by the project construction should be declared and disposed of to the residual soil management center of the municipal urban management bureau five days in advance, and the disposal procedures should be handled, and the transportation contract for consumption and cleaning should be signed, and the implementation can be organized only after approval.

1 1. If it violates the above commitments, it is willing to accept the administrative punishment of the competent department.

Civilized construction commitment 6 Temporary occupation and excavation of urban roads Civilized construction commitment Due to the safe operation and construction of the gas pipeline network, our unit needs to temporarily occupy and excavate Jiangyan Road in Haizhu District and the south of Jiangnan Avenue to implement the gas pipeline project. In order to ensure the civilized construction and smooth traffic of urban road excavation (construction), our unit promises to strictly follow the Road Traffic Safety Law, Regulations on the Administration of Municipal Facilities, Notice on Standardizing the Enclosure Facilities for Civilized Construction of Municipal Projects (Sui [20xx] No.218) and Notice on Strengthening the Civilized Construction Management of Municipal Gardens and Pipeline Construction Projects (Municipal Gardens [20xx]

Bright card structure. Hanging urban road excavation permit or urban road temporary occupation permit at the construction site.

2. Shell structure. According to the relevant regulations of civilized construction management, standard enclosure facilities should be adopted for enclosure work within the construction scope.

3. Construction on time. Strictly follow the approved construction plan and traffic organization plan. Rational allocation of human machines and tools, to avoid the construction peak and busy hours.

4. The construction site shall be provided with obvious traffic guide signs and warning lights at night. For engineering construction that has a great impact on vehicles and pedestrians, in addition to taking traffic diversion measures, special personnel should also be assigned to assist the public security traffic management department in traffic diversion. Repair the roads within the construction scope in time to ensure the traffic safety and smoothness within the construction scope.

Five. Construction materials, machines and tools shall not be placed outside the scope of the construction enclosure, and living facilities unrelated to the construction shall not be built on the temporarily occupied construction site. On the premise of not affecting traffic and pedestrians, temporary facilities such as warehouses and temporary offices should be set up in approved locations, but temporary facilities such as bamboo and wood structures that affect urban landscape should not be set up.

6. The construction of large machinery should be completed before 10: 30 pm as far as possible, and effective measures should be taken to reduce construction noise and dust.

Seven. The residual mud generated during construction shall be cleaned up and transported in time, and the stacking time of residual mud shall not exceed 24 hours, and the key sections shall be cleaned up and transported immediately. Vehicles carrying spare parts and construction waste must pass the qualification examination, hold a transportation permit, and may not be discharged into the road. Avoid affecting the city appearance and traffic safety. Other facilities damaged during the construction period and within the construction scope, the construction unit and the construction unit shall be liable for restoration or compensation.

Eight. The above construction measures, promise to do a good job of self-inspection every day, and consciously accept the supervision and inspection of the municipal management department, the public security traffic management department and the municipal urban management comprehensive law enforcement department. If there is a violation, in addition to timely correction, the law enforcement departments should be punished according to relevant laws and regulations. If traffic personnel, vehicles and other property losses are caused by improper construction measures or inadequate management responsibilities, the construction unit and the construction unit will be liable for compensation according to law.

Construction unit: (seal) Construction unit: (seal)

Person in charge: contact person: person in charge: contact person:

Commitment for Civilized Construction 7 (1) Time for submission of design documents to be completed by contractors with design qualification level and business scope: The contractor must provide relevant design documents 30 days before the start of the project requiring secondary design on the premise that the construction period will not be affected.

(2) Name and completion time of plans and statements provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report the project progress report (including monthly image progress, project settlement fee and monthly project price list) completed in that month to the supervisor, owner and agent construction unit (as of 20th of that month) and the construction progress plan, quantity plan and capital use plan for next month in quadruplicate.

(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor shall be responsible for all the work and bear all the expenses, and all the consequences arising therefrom shall be borne by the contractor.

(4) Requirements for office and living rooms and facilities provided to the owner: provide 2 on-site office rooms, each of which is 20 square meters, with 4 sets of office tables and chairs, 1 set of filing cabinets; 40 square meters meeting room 1 room, meeting tables and chairs 1 set; There are 2 on-site dormitories, each 20 square meters, each with 4 beds. The above expenses have been included in the total contract price.

(5) Relevant procedures of traffic, sanitation and construction noise management on the construction site that need to be handled by the contractor: The contractor is responsible for handling according to the relevant regulations of XX City, and bears corresponding responsibilities, and its expenses are implemented according to the relevant regulations, which have been included in the total contract price and used as lump sum.

(6) Special requirements and expenses for finished product protection of completed projects: Before the project is handed over to the Employer, the contractor shall be responsible for protection. During the contractor's protection, if the completed project is damaged, the contractor shall be responsible for repairing it and bear the corresponding expenses; If the Employer uses the completed project that has not been handed over in advance, causing damage to the project, the Contractor shall do a good job of repair in time, and the relevant expenses shall be borne by the Employer.

(7) Requirements and expenses for the protection of underground pipelines and adjacent buildings and structures (including buildings for cultural relics protection) and ancient and famous trees around the construction site: The contractor shall be responsible for protecting the buildings and structures around this project, and this part of expenses shall be included in the contractor's total tender offer. For the protection of underground pipelines and ancient and famous trees around the construction site, the contractor shall submit a protection plan, which shall be well protected after being approved by the engineers and supervision engineers stationed by the Employer. The protection fee shall be borne by the employer after it is approved by the employer. If the damage is caused by the contractor, the repair cost shall be borne by the contractor.

(8) Cleanliness and hygiene requirements of the construction site: The contractor shall ensure that the cleanliness and hygiene of the construction site conform to the relevant regulations and the requirements of civilized construction in XX city, and strictly abide by the management regulations on engineering quality, safety and civilized construction of the comprehensive service building in Automobile City during the construction, so as to achieve safe and civilized construction; In accordance with the provisions, set up car washing slots and other facilities at the entrances and exits of vehicles in the venues; Before the completion of the project, clean up the site to meet the requirements of municipal environmental sanitation and ensure the cleanliness of the construction site. The expenses incurred shall be borne by the contractor, and the losses and fines caused by the contractor's violation of relevant regulations shall be borne by the contractor.

(9) Other work agreed by both parties that the contractor should do:

A, due to the underground pipeline information provided by the employer to the contractor is only provided by the urban construction archives, the contractor shall verify the authenticity of the information, and the contractor shall be responsible for all problems caused by the contractor's failure to verify clearly.

B the contractor shall effectively protect the leveling points, coordinate points and control points provided by the employer. In case of any damage or loss during construction, the Employer shall contact the original lofting unit to re-lofting, and the expenses incurred shall be borne by the Contractor.

C, if necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, communication, network and other departments.

D, in a timely manner to XX city construction administrative departments to handle the formalities of project construction, to ensure that start on schedule.

E, the contractor must be responsible for coordinating the local relations around, to ensure the smooth completion of the project, all consequences caused by the adjacent relationship shall be borne by the contractor.

First, change work functions, correct service attitude, do a good job in enterprise service and give full play to the role of labor security in line with the principle of "all for the enterprise and all for the enterprise".

Second, change the work style, improve work efficiency, conscientiously implement the responsibility system of first inquiry and one-time notification system, without delay or dispute, and never exceed the time limit for examination and approval, review and handling, so as to ensure that working hours can be handled as needed, and overtime is the default.

Three, strengthen the construction of industry style, the implementation of open government affairs, all fees and standards in strict accordance with the provisions of the collection, and do the fees and standards publicity, and consciously accept the supervision of the masses.

Fourth, strengthen the construction of labor law enforcement team, establish service consciousness, help enterprises solve practical problems, constantly improve the level of administration according to law, consciously safeguard the legitimate rights and interests of enterprises and workers, and provide good development space for enterprises.

Five, labor and social security work should strive to create the best investment environment in the region, provide quality services for attracting investment, and contribute to the construction of a modern new Nankai with outstanding characteristics and strong strength.

6. Publish the contact number and report number (contact number:), accept the supervision of all sectors of society, and severely deal with administrative personnel and law enforcement personnel who violate laws and regulations in labor law enforcement.