1. If the building design meets the requirements for installing solar water heaters, the top floor owner has no right to prevent other owners from installing them. If the design of the house itself does not meet the requirements, no one can risk destroying the floor structure and installing it without authorization.
2. If the public part of the building belongs to all the owners, the owners have the right to install water heaters on the roof, but they should obtain the consent of the top residents. If the top floor residents don't agree, the two sides can sign an agreement to solve it. If it is clear in the agreement that if the roof leaks due to the installation of water heaters, the residents who install water heaters can bear part of the maintenance costs.
The inspection methods to participate in safe production and civilized construction on the construction site mainly include daily inspection, special inspection and joint inspection. The specific explanation is as follows:
1, routine inspection refers to the daily inspection organized by the project manager or the regular spot check organized by the construction enterprise. The supervision engineer shall participate in such self-inspection activities, and review and sign the activity records to urge the rectification;
2, according to the civilized construction management documents issued by the Municipal Construction Committee to carry out special inspections, such as mud and muck digging, health and epidemic prevention, etc. Management information, publicity and education inspection, as well as special inspection or inspection of key projects and parts carried out according to the relevant documents of superiors;
3. Joint inspection refers to the inspection conducted by the supervision team in three stages of the construction process (namely, the foundation, the main structure and the first three stages of the project completion) according to the Standard for Safety Inspection of Building Construction. The scoring results shall be signed by the project manager or the person-in-charge of the construction enterprise and the person-in-charge of the supervision company as the main basis for evaluating the construction safety level after the completion of the project.
The inspection frequency is as follows:
1, routine inspection and safety inspection shall be carried out at least once every quarter for enterprises and once every month for the project department. Civilized construction inspection enterprises shall conduct spot checks at least once every quarter and the project department shall conduct spot checks at least once a week;
2, special inspection, flexible grasp according to the engineering practice;
3, joint inspection, each stage not less than once.
Article 286 of the Civil Code of People's Republic of China (PRC) * * * Owners shall abide by laws, regulations and management regulations, and relevant behaviors shall meet the requirements of saving resources and protecting the ecological environment. For property service enterprises or other managers to implement emergency measures and other management measures implemented by the government according to law, the owners shall cooperate with them according to law.
The owners' assembly or the owners' committee has the right to ask the perpetrator to stop the infringement, remove the obstruction, eliminate the danger, restore to the original state and compensate for the loss of any act that damages the legitimate rights and interests of others, such as dumping garbage at will, discharging pollutants or noise, raising animals illegally, building illegally, occupying passages, refusing to pay property fees.
If the owners or other actors refuse to perform relevant obligations, the parties concerned may report or complain to the relevant administrative departments, which shall deal with them according to law.