Responsibilities of building materials engineer:
1. Abide by the company's regulations on material management, conscientiously implement relevant regulations such as safety production and fire prevention measures, understand and master the technical performance of various materials, obey the leadership's work arrangement and do a good job in material procurement;
2. Strictly meet the requirements of material management, and prepare the procurement plan according to the construction organization design and material budget management system to ensure the normal progress of the project;
3. Be familiar with the design drawings, understand all kinds of building materials, and be responsible for the quality, specifications and models of the purchased materials to meet the design requirements;
4. Fully collect and understand the market price of materials, give priority to suppliers with high cost performance based on the principle of high quality and low price, and sign material contracts according to the company's process to minimize the procurement cost;
5. It is forbidden to use unqualified materials in the project. If unqualified materials are purchased, they should be handled through consultation in time to solve the problem;
6. Abide by and improve the material management system, analyze and classify all kinds of original vouchers, accounting vouchers and other materials, and arrange and keep them;
7. For dangerous, flammable and explosive materials, a special place should be set up for storage, and the materials should be well managed and recorded;
8. Do a good job of recording and sorting out the internal and external settlement, ensure that all records are well documented and damaged, and that the records are true, well documented and consistent with the accounts;
9. Grasp the progress of the project, understand the changes of the project, make a good feeding plan in time, and ensure that the materials meet the progress requirements;
10. Prepare corresponding annual, quarterly and monthly material supply plans according to the planned objectives of the project;
1 1. Command personnel to do a good job of warehouse duty, and implement various fire prevention and anti-theft facilities to prevent accidents;
12. Make monthly material report and daily fund report regularly. If the material supply price exceeds the budget, report it to the relevant personnel in time and go through the application procedures;
13. Supervise and implement the use progress of materials, prohibit the occurrence of material damage or waste, and propose punishment measures if relevant personnel are found to be in violation of regulations;
14. Comply with company regulations, purchase and distribute labor protection articles in time to ensure safe operation;
15. Responsible for issuing the requisition of construction materials and tools, which shall be signed and confirmed by the requisition personnel;
16. Abide by professional ethics, put the interests of the company first, adhere to personal principles, and do not accept all kinds of kickbacks and gifts;
17. Cooperate with relevant departments to complete other tasks assigned by superiors when necessary.