Formal cleanup contract template
Nowadays, many citizens’ awareness of rights protection is constantly increasing. We use contracts in more and more places. Signing a contract can clarify the rights and obligations of both parties. . So what should you pay attention to when drafting a contract? Below is a formal cleanup contract template that I have compiled for everyone for your reference. I hope it can help friends in need.
Formal clearing contract 1
General contractor: (hereinafter referred to as Party A)
Clearing party: (hereinafter referred to as Party B) Both parties A and B act in a friendly manner With a cooperative attitude, in accordance with the "Contract Law" and other relevant laws, the following contract was signed on the basis of equality and justice.
1. Project Overview
1. Project Name:
2. Project Location:
3. Project Content:
4. Project:
2. Project quantity and price
1. Project quantity: m2;
2. Unit price: Yuan/m2 ;
3. Labor cost: Yuan.
3. Payment method
1. After the personnel enter the site, Party A pays Party B 10,000 yuan;
2. After the installation is completed, Party A pays Party B's 10,000 yuan;
4. After passing the acceptance inspection, Party A will pay 95% of the total contract price to Party B;
5. Keep 5% of the quality deposit, and there will be no quality after one year Question, Party A pays the balance to Party B in one lump sum.
IV. Design
1. Party A must provide Party B with a set of drawings and construction plans, and be responsible for the submission;
2. If Party A does not The drawings must clearly explain the requirements to Party B. Party B must draw a sketch for Party A's approval before construction.
V. Materials
1. Party B is responsible for providing Party A with a list of materials to be purchased, and Party A should purchase materials in a timely manner for use by the construction team. ;
2. Without the consent of Party A, Party B shall not purchase materials on its own;
3. Party B shall inspect and accept the quality of the building materials purchased by Party A, and report any quality problems to Party A in a timely manner Propose and have the right to refuse to use;
4. Party B should help Party A receive the goods and check the accuracy of the quantity and accessories;
5. Party B should keep the materials well, No idlers are allowed to enter the construction site;
6. Party B shall not lose materials without Party A’s permission. If any loss is found, the labor cost will be deducted from the material price.
VI. Construction Period
1. The start date is year month day, and the completion date is year month day. The construction period is tentatively scheduled to be sunny days.
2. If the construction period is delayed due to Party A’s factors, Party A may deduct Party B’s related labor costs.
VII. Responsibilities of Party B
1. Party B shall strictly follow the drawings and contracts provided or reviewed by Party A to complete the construction of steel structure engineering tasks;
2. Party B shall bring its own tools required for construction and ensure the safety and good usability of the tools. Party B shall bear the maintenance of the tools by itself;
3. Party B shall complete the construction within the time limit specified in the contract, and will deduct 500 from the project payment for each day of delay. Yuan;
4. In case of force majeure factors such as strong wind, heavy rain, power outage, etc., the construction period shall be postponed;
5. Party B’s staff should pay attention to safe construction during the construction period. Party B shall bear full responsibility for all personal casualties;
6. Without the consent of Party A, Party B shall not suspend or terminate work under any circumstances;
7. The construction unit is responsible for prompt Clean up the construction waste to the specified location. After the construction of the project is completed, the construction personnel are responsible for clearing the construction waste on the site before leaving the site immediately;
8. The construction unit must ensure the construction quality. If construction quality problems occur, the construction The unit should make corrections promptly.
8. Maintenance
1. For quality problems caused by Party B’s construction, Party B shall repair them free of charge within two years;
2. For ordinary maintenance, Party B shall Party A shall promptly repair it within three days after notifying Party B. In special circumstances (water leakage problem), Party B must arrive and repair it within 24 hours;
3. If Party B fails to complete the repair in time according to the contract, Party A can The labor costs incurred by arranging other construction teams to perform maintenance work will be deducted from the warranty money in real terms.
9. Contract Disputes
1. If there is a dispute, Party A and Party B shall negotiate first. If negotiation fails, they may file a lawsuit with the court where the dispute is located.
2. This contract is made in two copies, with Party A and Party B each holding one copy.
Party A: xxx Co., Ltd. Party B:
Address: xxx Address:
Representative: Representative:
Mobile phone number: Mobile phone number :
Regular clearing work contract 2 on x, month x, 20xx
Party A:
Party B:
According to the "People's Republic of China **The Contract Law of the People's Republic of China", the "Construction Law" and relevant administrative laws and regulations, following the principles of fairness, voluntary equality and mutual benefit, and giving full play to their respective advantages, we now provide Ningxia Sun Magnesium Industry with a new machine repair workshop finished product warehouse, machine repair workshop, Regarding the contracting of the clean-up work of sporadic engineering pools and pump room projects, this agreement has been signed by both parties through consultation and unification of opinions. It serves as the basis for both parties to be consistent and trustworthy during the cooperation process. Specifically, The unified matters are as follows:
1. Contract name
Template production, installation and support for Ningxia Sun Magnesium's new machine repair shop finished product warehouse, machine repair shop, sporadic engineering pool, water pump room and other projects Assembly and disassembly work.
2. Contract scope:
All formwork projects within the scope of construction drawings. Production and installation of cast-in-place and prefabricated formwork throughout the entire construction process from foundation cushion to main body capping, production and installation of various mechanical foundation formwork, reservation of embedded parts, erection and disassembly of formwork, raw material handling, vertical transportation, collection and cleaning , nail removal, oiling, sorting and stacking at designated locations, and all other work related to carpentry.
3. Contracting unit price:
It has been agreed by both parties that the contracting price for the carpentry shift clearing work is 50 yuan per square meter of the expanded area of ??the components according to the construction drawings of this project; (this fee includes safety guarantees The fee is 2 yuan/m2 per square meter of the unfolded area of ??the components designed in the construction drawings, the progress measure fee is 2 yuan/m2 per square meter of the unfolded area of ??the components designed in the construction drawings, and the civilized construction fee is 2 yuan/m2 per square meter of the unfolded area of ??the components designed in the construction drawings. , if Party B violates the above three provisions, Party A has the right to deduct the expenses for the violation, and Party B obeys unconditionally)
IV. Settlement method:
According to the agreement between the two parties, To calculate and design concrete components according to the construction drawings, the expanded area of ??the installation template required to be produced is multiplied by the unit price stipulated in the contract.
5. Construction Period:
Party B shall strictly follow the project construction plan prepared by Party A’s project department, and shall actively cooperate with and obey the guidance and guidance of project department managers, owners, and supervisory leaders. Supervise and coordinate various relationships in terms of safety, quality, and progress of various types of work. The allocation of labor to the site should be organized in a timely manner according to the progress plan and special circumstances, management measures and management efforts should be strengthened, and the overall project and monthly and weekly completion plans formulated by the project department must be unconditionally implemented. If there is any violation of the provisions of this article of the contract, Party A will It is necessary to deduct the cost of progress measures specified in Article 3 of this contract, and Party B will comply unconditionally.
6. Quality requirements:
During the construction period, Party B should be familiar with the construction drawings and review the changes carefully, report them correctly according to actual needs, plan the use of materials, and strictly follow the template The project acceptance specifications require construction, and no cutting corners or additions of materials are allowed. Technical explanations and technical review links must be made in technical operations to prevent quality problems caused by axis deviation, displacement, deflection, insufficient cross-section, deformation and weak support. Exploded molds, etc.
7. Machinery and tools to be provided by both parties:
1. All tools related to woodworking types shall be purchased and distributed by Party A.
2. Party B assumes the obligation to keep it. If there is any loss, Party B needs to compensate according to the price.
8. Civilized construction:
During the construction period, Party B at the construction site shall actively cooperate with the guidance and supervision of the project department in accordance with the specific requirements of the project management department. According to the requirements of the construction workers of the project department, they should be classified according to varieties and specifications, and should be stacked neatly in order. They should not be randomly piled or randomly sawed or used randomly. The materials should be drawn and positioned for use, and miscellaneous materials should be used in a timely and reasonable manner. The used materials must be nailed and oiled, and then classified and stacked or used. Arrange personnel in a timely manner to collect and sort out scattered materials and put them into use. If any unplanned use of raw materials is discovered, a fine of 200 yuan will be imposed for each randomly sawed board and 50 yuan per wooden block.
9. Safety and Public Security Management Requirements:
During the construction period, Party B shall conscientiously implement the policy of safety first and prevention first, strictly prohibit illegal operations and command, and strictly comply with national regulations. Safety production regulations require operations, timely organization and training of safety production education and management for employees, timely reporting of safety hazards to the project department for rectification, active cooperation with the project department and signing of safety production responsibility letters with workers in each work shift, which must be observed The project department has formulated the following systems for construction site safety management: ① Gambling and fighting are strictly prohibited in the construction site area. Once found, all parties will be fined 500 yuan per time, and serious cases will be sent to the judicial department for processing. ② It is strictly prohibited to use electrical equipment that heats up quickly and consumes a lot of power for private purposes. Once discovered, items will be confiscated and a fine of 500 yuan per time will be imposed. ③It is strictly prohibited for employees to bring their family members and children into the construction site. ④ No one is allowed to work under the influence of alcohol, and no one is allowed to work shirtless, wearing slippers or not wearing a safety helmet. If found, a fine of RMB 100 per time will be imposed. ⑤ It is strictly prohibited to pull or connect wires without permission on site and in the dormitory. ⑥ Every employee in the team who arrives at the construction site must register with the project department, submit their ID card, family planning certificate, and receive three-level safety education. Pay the fees for examining and applying for temporary residence permit and other documents (the fees for applying for the certificate and other documents shall be borne by Party B).
10. Responsibilities and breach of contract of both parties:
Party A’s responsibilities:
(1) Party A makes comprehensive arrangements for Party B’s work, and provides guidance and supervision , prepare the overall progress, monthly, and weekly progress plans, provide progress and technical explanations to Party B, and provide timely materials required based on actual reports.
(2) Party A shall provide comprehensive management guidance, supervision and instructions for Party B’s safety, quality, progress and civilized construction dynamics during the construction period.
(3) Pay living expenses and wages in a timely manner as agreed.
Party B’s responsibilities shall be based on the requirements of the project department and comprehensively and effectively handle safety, quality, progress, civilized construction and other matters. The specific stipulations are as follows:
(1) Safety: During the construction period, if Party B shall bear all responsibilities for all safety accidents, large or small, that occur due to Party B's illegal operation or other reasons (Party A has included safety fees in the contract price).
(2) Progress: If Party B fails to implement the project department’s schedule during the construction period, a penalty of 1,000 yuan/day will be imposed for each day of delay (Party A has included the progress measure fee in the contract price)
p>
(3) Civilized construction: Party B must cooperate with the civilized construction work in accordance with the requirements during the construction period. If it is not implemented as required, the civilized construction fee of 2 yuan/m2 shall be deducted and Party A will send employees to handle it. (Party A has included civilized construction fees in the contract price)
(4) The machinery and tools received by Party B must be returned to the warehouse according to the actual data on the delivery order. If they are missing or damaged, Party B shall compensate according to the original price and deduct the default amount of the above items at the time of settlement.
(5) During the contract performance period, neither party shall bargain or unreasonably adjust the contract unit price after negotiation and agreement between the two parties.
(6) Party B shall not withdraw from the contract for any reason or stop work midway to cause trouble during the construction period. If a similar situation occurs, Party A has the right to terminate the contract and instruct Party B’s personnel to leave the site unconditionally. In terms of settlement issues, Party B will be deemed to have no performance.
11. Payment method:
(1) As agreed by both parties: after the main structure is completed, 70% of the completed work quantity will be paid.
(2) The project quantity is fully completed, and 80% of the total project quantity is paid within one month after the main structure has passed the acceptance inspection and the renovation work is completed.
(4) The project quantity shall be fully completed and the payment shall be made within one and a half months after the initial inspection conditions for completion are met.
(5) Before each payment for the above-mentioned projects, the construction personnel of the project department must verify the project quantities and sign for approval before release.
Regarding the content of the above agreement, we hope that both parties will respect the facts, be sincere and trustworthy, cooperate friendly, and develop together.
12. Special Agreement:
1. Party B shall not delay wages to migrant workers for any reason during the validity period of the contract, causing migrant workers to petition.
2. Party B shall not interfere with the normal work of Party A’s project department for any reason during the validity period of the contract.
3. The project funds within the scope of the contract are at the disposal of Party B and are responsible for its own profits and losses. Party A does not assume any financial responsibility.
4. If Party B violates the three terms of the appeal, Party A has the right to terminate the contract and impose a penalty of RMB 20xx0 on Party B, which will be directly deducted from the project payment without Party B’s approval.
13. Unfinished matters will be resolved through negotiation between the two parties at that time.
14. This agreement is in four copies
Party A and Party B (official seal): _________ Party B (official seal): _________
Legal representative (signature) : _____________ Legal representative (signature): _________
_________year____month____day_________year____month____each party shall hold one copy and the company shall hold one copy. Formal Clearance Work Contract 3
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
Now for the interior decoration project, to clear In the form of contract work, the construction is contracted to Party B. In order to clarify the responsibilities of both parties, the following terms have been agreed upon by both parties through mutual agreement. It is expected that both parties A and Party B will abide by and perform the work, and it will be the basis for settlement after the completion of the project. The agreement is as follows: p>
1. Obligations of both parties
1. Party A shall arrange the progress of the project and provide construction materials and safety facilities.
2. Party A guarantees the timely supply of materials. Except for specially processed materials according to the required processing cycle, other conventional materials must be guaranteed to be delivered within the time agreed upon by both parties.
3. After reviewing the drawings, Party B will proceed with production and assembly according to the drawings (if there is any discrepancy, the documents issued by the company shall prevail or the engineering department shall decide). According to Party A's instructions, Party B is responsible for increasing or decreasing labor personnel according to the actual construction progress and the actual situation on site. To achieve safe production, if safety regulations are violated, resulting in casualties, Party B will be responsible for all expenses except for the main responsibility.
4. Party B shall handle personal safety insurance procedures at its own expense.
5. Party B shall be equipped with designated safety officers and construction workers on site, and shall sign the contract.
6. Party B’s various types of work should cooperate with each other and solve problems on the spot or through the engineering management department.
7. Party B shall complete the construction tasks within the specified time, and ensure a balance of labor force during holidays. Party B shall not delay the construction period without reason.
8. Party B shall ensure the quality, construction period and acceptance of this project package.
2. Contract scope and price:
If the project is completed on time and with good quality, and has passed the one-time acceptance by the relevant unit and is assessed as an excellent project, additional rewards/sets will be given.
The above costs include construction personnel labor costs, on-site material storage fees, worker labor fees, on-site construction coordination fees, on-site construction tool fees, product cleaning and protection fees before the product is handed over to the customer, etc.
Note: The list of construction workers and wage standards of the construction team must be submitted to the company, and the wages of workers must be paid in proportion to what they receive; if violated, Party A has the right to terminate the contract Pay wages to workers on behalf of the contractor in the presence of workers.
3. Construction period:
Tentative date - month The construction will be carried out according to Party A's construction flow chart, and the total construction period will be controlled within days, and will be carried out specifically according to Party A's project plan progress requirements. If delayed, a penalty of 150-500 yuan/day will be imposed. If the construction period is delayed due to Party A's subjective reasons, the construction period will be postponed and corresponding living expenses will be provided to the construction team.
IV. Payment and settlement method:
● Living expenses of 5% of the total project price will be paid in advance for 7 days upon entry (the construction staffing must meet the construction requirements).
●When the masonry and woodworking division (sub-item) project is completed, 40% of the total project price will be paid after the acceptance is passed.
●After the completion acceptance is signed, 60% of the total project price will be paid. , the project payment will be settled 10-15 days after handover.
5. Construction quality requirements:
1. This project must be constructed in accordance with national standards and market quality inspection standards and drawing requirements. Acceptance shall be carried out in accordance with the requirements of national and enterprise standards
namely the "Residential Decoration Acceptance Standards" and Shanghai local standards, and the quality acceptance shall be guaranteed to be above or above. The construction quality shall be confirmed by Su Zhen issuing a construction acceptance form signed by the construction team. The content specified therein shall prevail.
2. If there is any discrepancy with the drawings or failure during the construction (except for special arrangements by the engineering department), the rework costs will be borne by Party B, and a fine of 30-50 yuan per time will be imposed according to the quality penalty regulations. .
3. The actual progress schedule of the project should be prepared every month and submitted to the project management department.
4. If the project management personnel finds that the project is unqualified, the management personnel will issue a rectification notice, and the construction team will unconditionally make repairs within the specified time until approved by the project management department. If rework is caused by Party A's subjective reasons, the cost will be borne by Party A.
5. The materials or spare parts used on site should be protected and cannot be left in a random pile.
The engineering department will check the reconciliation of these materials and spare parts. , except for appropriate losses, the remaining material quantities will be compared with the material list issued by the budget department. If the losses exceed any excess, Party B will be responsible for compensation, and the money will be deducted from its construction project payment.
6. For damaged company materials or excessive use of materials in rectification projects, the money will also be deducted from the project payment.
7. Every employee who has worked at a construction site should establish the concept of protecting finished products. They must protect the finished products of all types of work. If there is any damage, they will be compensated according to the price.
8. All tools used by Party B must be properly protected, such as machinery, tools, wires, iodine tungsten lamps, safety helmets and other materials received by Party B. They should be returned in full after the completion of the project (consumables and old products are returned for credit). The missing part will be compensated as leave.
9. Party B’s construction materials should be constructed according to the quota for each apartment type. If the quota exceeds the quota, the excess portion will be borne by the construction team (the material quota will be measured on-site by the company’s engineering department) , especially the cement mortar mixed on the same day must be used up on the same day to ensure that the site is cleared after the work is completed. Party A will conduct inspections from time to time and will be fined 50-200 yuan for each discovery.
6. Construction Responsibility:
1. Party B shall be responsible for the entire construction progress and quality of the project, including services during the warranty period, and shall be responsible for the construction team
Safety production of personnel, construction discipline, etc. Strictly implement the project plan and control quality. Assist the engineering department manager to coordinate on-site work and keep a construction diary every day. Follow the company's acceptance form as the criterion and obey the unified arrangements of the Engineering Management Department.
2. For a team that makes things difficult for the project management personnel or refuses to carry out the instructions of the Engineering Department, the Engineering Department has the right to require the construction team or related personnel to leave the site and immediately terminate the contract. If you are not satisfied with this decision, you can Report to the company's superiors, but the decision to withdraw must be obeyed.
3. Party B must adhere to the principle of "safe production and civilized construction", effectively implement labor, safety, laws and regulations, pay attention to safe production, strengthen safety education, implement safety precautions, and prevent work-related injuries. occurrence. If an accident occurs to Party B's personnel, machinery, equipment, etc., all liability and economic losses shall be borne by Party B.
4. Party B must strictly abide by the regulations on labor protection, labor safety and social security of the state and administrative departments at all levels when organizing production. It is not allowed to cancel or reduce the health care benefits of low-level employees and female workers through contracting, and the use of child labor is strictly prohibited. Party B's operators must be Party B's registered employees and have relevant employment certificates, ensure good technical quality, abide by Party A's various management systems, and obey the production deployment of Party A's management personnel.
5. When signing the contract, Party B shall submit the names, ID copies and photos of all construction personnel to the project management department for unified management, and shall accept Party A’s inspection, supervision, rewards and punishments, according to local The police station stipulates that the temporary residence permit and public security management fees shall be handled by Party B.
6. At the construction site, employees are not allowed to cook on the construction site. They must cook, cook and eat in designated places, and ensure that the site is hygienic, clean and safe.
7. Unfinished matters must be resolved through negotiation by both parties. This contract is made in two copies, with each party holding one copy. It will be effective upon signature by both parties. After the payment is paid, this contract will automatically expire. .
8. Others. (Related documents issued by the Engineering Management Department on-site for on-site construction)
Party A: Shanghai Suzhen Decoration Design Co., Ltd.
Party B:
Telephone :Tel:
Year, month, day;