Current location - Quotes Website - Personality signature - Responsibility book for safe production of water conservancy and hydropower projects
Responsibility book for safe production of water conservancy and hydropower projects
Responsibility book for safe production of water conservancy and hydropower projects

In daily life and work, each of us may come into contact with the responsibility book, which can better define the tasks we should undertake and help us complete the tasks we should complete. So how can the responsibility book be drafted to play its greatest role? The following is the responsibility book for safe production of water conservancy and hydropower projects that I have carefully compiled for reference only. Let's have a look.

According to the specific requirements of provinces, cities and counties for the "30,000" activities, in order to consolidate the achievements of water conservancy facilities construction in the "30,000" activities, strengthen the maintenance, conservation and water conservation work of the project, ensure that the project can give full play to the benefits and earnestly safeguard the interests of water users, the Chuwangjing Village Committee of Guojiaba Town (hereinafter referred to as Party A) decided to establish a responsibility system for the management and protection of rural water conservancy irrigation projects after discussion, and with ..

I. Rights and obligations of Party B:

1. Party B shall undertake the operation and management of (project name) and enjoy its operation, management and priority.

2. Party B has the right to supervise, manage and rationally allocate water resources for water users within its jurisdiction.

3. Party B shall strengthen the management and maintenance of irrigation facilities, ensure safe and efficient water supply, and ensure the reasonable water demand of water users in the jurisdiction.

Two. Rights and obligations of Party B:

1. Party A has the right to supervise and inspect Party B's management and protection of water conservancy irrigation projects.

2. Party A has the right and obligation to actively strive for policies and funds for the construction of water conservancy facilities and implement the relevant policies and regulations of the superior.

3. Party A has the right and obligation to coordinate and arbitrate civil disputes caused by water use.

4. Party A has the right to stop and correct Party B's breach of contract, and has the right to take back the management right.

Three. Liability for breach of contract:

If Party B fails to maintain and operate the project according to the regulations, Party A may order Party B to make rectification according to the actual situation. If the circumstances are serious, Party A may take back the management right of Party B..

Four, this responsibility is in quadruplicate, each party holds one copy, and submitted to the people's government of Guojiaba Town and the county "30,000" activity management office for the record.

Verb (abbreviation of verb) This responsibility letter shall come into effect as of the date of signature by both parties.

Party A: Party B:

Representative signature: Representative signature:

2. Party A's responsibility book for safety production of water conservancy and hydropower projects:

Party B:

Person in charge of project management and protection:

Supervision technical service organization in the region: water conservancy service center station (official seal)

Hereinafter referred to as Party A, Party B, supervision technical service organization and project manager respectively.

According to the relevant regulations, after full consultation, both parties agree that the ownership of small irrigation and water conservancy facilities within the scope of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. After the project is handed over, the property right, use right and management right shall be owned by Party B. Without Party A's consent, Party B shall not sell, mortgage or transfer the property right of the above-mentioned project, otherwise Party A has the right to pursue Party B's legal responsibility according to People's Republic of China (PRC) Water Law and other relevant laws.

2. Party B is responsible for the management and protection of the transferred small-scale farmland water conservancy facilities.

3. Party B shall, according to the actual situation of the handed-over project, establish a detailed account of fixed assets and fixed assets cards, formulate management and protection measures, establish a management and protection system, implement management and protection responsibilities, ensure the normal use of the project and bring into play long-term benefits.

4. In order to bring the project benefits into play, Party B should explore effective management methods. Establish a management organization, set up a special management team, and implement the management responsibility.

5. Party A shall keep track of Party B's management and use at any time, and have the right to give feedback to Party B and the competent leader to guide Party B to manage and use the units that are poorly managed and used.

6. Party B is obliged to report the management and protection of water conservancy facilities and existing problems to Party A at any time. Party A has the right to ask Party B to report the project management and protection and the performance of benefits according to the situation, and Party B shall assist in the implementation of rectification, and fill in the operation records and statements of project management and protection as required.

7. Management and protection units shall crack down on criminal acts of destroying water conservancy facilities according to law, and when saboteurs are found, they shall contact the District Water Conservancy Bureau and the local government police station in time.

8. Establish a performance appraisal system, incorporate the transferred projects into the target appraisal management of each administrative village, and give appropriate subsidies or rewards to the well-implemented management units in the form of "civilian-run assistance", "one-thing-one-discussion financial award", "substituting awards for subsidies" and "village collective projects are built by everyone"; Party A will reduce or cancel the annual district financial management and protection fund subsidy for the management units that are poorly implemented.

9. In addition to the management and protection funds of economic organizations, the management and protection funds of public welfare (quasi-public welfare) small-scale water conservancy projects shall be applied by Party B, and the grass-roots water conservancy stations shall prepare the project maintenance and repair plan, which shall be submitted to the district water conservancy bureau after being audited by the district finance department and incorporated into the district financial subsidy project, and Party B shall organize or adopt the way of government purchasing services for maintenance and repair.

10. Other outstanding matters shall be settled by both parties through consultation.

The responsibility book is in quadruplicate, one for each township (street), water conservancy station, villagers' committee and Liandu Water Conservancy Bureau.

XX,XX,XX,XX

In order to seriously implement the policy of "safety first, prevention first" and aim at "strengthening the awareness of red line and promoting safe development", the responsibility book 3 for safe production of water conservancy and hydropower projects strengthens the supervision and management of safe production of water conservancy projects, and standardizes and standardizes the construction safety management, so as to ensure the safe, high-quality and timely completion of the 20xx annual project crossing Donggang in X city, and further clarify the safety responsibilities of all construction parties. In order to prevent and reduce accidents in production safety, and ensure the safety of people's lives and property, the construction management unit, supervision unit and construction unit signed this water conservancy project in accordance with People's Republic of China (PRC) Law on Work Safety, Regulations on Work Safety in Construction Projects (Order No.393 of the State Council), Regulations on Work Safety in Water Conservancy Project Construction (Order No.26 of Ministry of Water Resources) and other laws and regulations, combined with the characteristics of water conservancy projects.

A, the construction management unit safety responsibility

1, according to the national laws and regulations on production safety, choose a construction enterprise with good safety qualification and safety reputation to contract the construction.

2, according to the relevant provisions of the bidding, fulfill the obligations stipulated in the contract, shall not be arbitrarily depressed and arrears of project funds, to create conditions to ensure adequate funds for security measures.

3. Before the project starts, all kinds of hidden information such as underground pipelines related to the construction site should be provided to the construction enterprises, and they should actively cooperate with the construction enterprises to make safety preparations.

4. Supervise supervision units and construction enterprises to strengthen safety management. Encourage supervision units and construction enterprises to increase safety investment, consciously implement national and industrial advanced technical standards for safety management, and strive for first-class enterprises.

Second, the safety responsibility of the supervision unit

1. Entrusted by the owner, it is responsible for supervising and inspecting the safety in production at the construction site of new construction, reconstruction and expansion projects, and investigating and handling violations of laws, decrees and regulations on safety in production during construction.

2. Before the project starts, measures for safety in production should be arranged comprehensively and systematically, and the responsibility for safety in production of the construction unit should be clarified.

3, should always urge the construction enterprises to strengthen safety management, according to the operating norms and procedures, the construction site safety hazards should promptly notify the construction unit to deal with the rectification.

4. According to the Law of People's Republic of China (PRC) on Safety in Production, Regulations on Safety in Production of Construction Projects, Regulations on Safety in Production of Water Conservancy Projects, Regulations on Supervision and Management of Water Conservancy Projects, and Several Opinions on Implementing Supervision Responsibility for Safety in Production of Construction Projects, the construction unit is required to strive to improve the level of safety management.

Third, the construction unit safety responsibility

1, the construction unit is mainly responsible for the safety in production on the construction site. The construction unit shall establish the responsibility system for production safety and the education and training system for production safety, formulate rules and regulations for production safety and operational norms, conduct regular and special safety inspections on the water conservancy projects undertaken, and make safety inspection records.

2. The legal representative of the construction unit shall be fully responsible for the safety production of this unit according to law. The person in charge of the project (project manager) shall be a person who has obtained the corresponding professional qualifications, take the first responsibility for the on-site safety construction of water conservancy construction projects, implement the first responsibility for safety production, safety production rules and regulations and operating procedures, organize the formulation of safety construction measures according to the engineering characteristics, eliminate the hidden dangers of safety accidents, and report production safety accidents in a timely and truthful manner.

3, the construction unit shall, in accordance with the relevant provisions of the state, set up a safety management organization, equipped with full-time safety management personnel. The construction site must have full-time safety production management personnel who are responsible for the supervision and inspection of on-site safety production. If hidden dangers of production safety accidents are found, it shall report to the project leader and the safety production management institution in a timely manner; Should immediately stop illegal command and operation.

4, the construction unit in the preparation of construction organization design, should formulate corresponding safety technical measures according to its characteristics; For partial projects with strong professionalism, special safety construction organization design should be prepared and measures should be taken to strictly implement them.

5, the construction site should improve all kinds of on-site safety management system, such as the construction site regular safety inspection and regular meeting system, all kinds of equipment, equipment safety acceptance system, safety technical disclosure system, safety production reward and punishment system, safety information management system in the industry and various technical operation procedures and job responsibilities. The construction site must strictly implement the system of temporary electricity consumption, scaffolding and aerial work protection, and safety inspection and acceptance of construction machinery, and resolutely refuse to handle those who have no acceptance procedures or fail to pass the acceptance.

6. The construction unit shall strictly implement the laws, decrees, regulations and industry rules and regulations of the state and the construction administrative department on the construction safety of water conservancy projects, prohibit all kinds of illegal command and operation, strengthen daily safety inspection at the same time, rectify the existing problems in time, and make records.

7, the construction unit should establish and improve the labor safety education and training system, strengthen the post education and training of employees, improve the safety awareness of workers, special workers must hold relevant certificates.

8. When an accident occurs during construction, the construction unit shall take emergency measures to reduce casualties and accident losses, and report to the relevant departments in a timely manner in accordance with relevant state regulations.

Four, the "water conservancy project construction safety responsibility" from the date of signing.

Construction management unit: legal representative (or authorized representative): (seal)

Supervision unit: legal representative (or authorized representative): (seal)

Construction unit: legal representative (or authorized representative): (seal)

Responsibility letter for safe production of water conservancy and hydropower projects 4 In order to strengthen the quality management of the South-to-North Water Transfer Project in Xinxiang City, implement the lifelong responsibility system for quality, ensure the quality of the project and protect the safety of people's lives and property, this responsibility letter is signed in accordance with the Regulations on Quality Management of Construction Projects, the Regulations on Quality Management of Water Conservancy Projects and the Measures for Quality Management of South-to-North Water Transfer Project.

I. Objectives

The quality goal of this project is: the quality grade of the unit project is qualified. Among them: the qualified rate of unit project 100%, and the excellent rate is over 85%; The qualified rate of all major unit projects, important concealed projects and key unit projects has reached over 90.0%; The unit project appearance quality score rate is above 70%; No major quality accidents.

Second, the responsibility of the construction unit

In the process of project construction, the construction unit has the following responsibilities:

1, the project manager of the construction unit shall take full responsibility for the construction quality of the construction project to ensure the realization of the quality objectives;

2, the project manager must fully implement and implement various policies, regulations and systems related to quality, and implement various quality assurance measures;

3. Establish and improve the quality assurance system, formulate the project management system, quality responsibility and assessment methods, and implement the project quality responsibility system;

4. Set up chief quality inspector, quality management organization and full-time quality management personnel;

5, often to the worker quality and safety education, strengthen the post technical training of construction personnel, improve the quality consciousness;

6. Carry out the construction in accordance with the national and water conservancy regulations, technical specifications, technical standards, relevant regulations and notices of relevant departments of South-to-North Water Transfer Project, design documents and construction contracts, conscientiously implement the mandatory standards for engineering construction, and shall not modify the design without authorization or cut corners;

7, in the construction organization design, clearly formulate technical measures to ensure the construction quality;

8, set up a full-time quality inspection agency, equipped with full-time quality inspection personnel, the configuration and accuracy of experimental instruments meet the requirements, quality inspection personnel show certificates, shall not be replaced without authorization, and accept the verification of the Construction Management Bureau and the supervision department;

9, must be in accordance with the engineering design requirements, construction technical standards and contract, the use of engineering materials and semi-finished products, sent to the construction unit approved by the quality inspection unit with corresponding qualification level for testing, without inspection or unqualified inspection, shall not be used. The test blocks, test pieces and related materials involved in structural safety shall be sampled under the witness of the supervision unit;

10. It is necessary to carry out total quality management, strengthen quality inspection in the construction process, strictly manage working procedures, earnestly implement the "three inspection system", effectively control the whole process of project quality, and make records of project quality evaluation in time to ensure the timeliness, completeness and accuracy of project quality technical data;

1 1, implement the quality traceability system, implement the real-name signature system of field operators for key parts and key working procedures of the project, and establish and improve the ledger management system;

12, and shall not illegally subcontract or subcontract the projects undertaken by it;

13, the project quality must conform to the current standards of the country, industry and South-to-North Water Transfer Project, meet the design and contract requirements, and submit complete engineering technical files, test results and related materials before the completion acceptance;

14, seriously implement the technical disclosure system. Pre-inspection and re-inspection of major concealed works and key parts of the project;

15. In case of quality accident, strictly protect the site, take effective measures to rescue personnel and property, prevent the accident from expanding, and report to the supervision unit and the Construction Management Bureau within the specified time. Accept the investigation of engineering quality accidents, provide quality accident analysis reports, and deal with accidents seriously;

16, accept the inspection and supervision of the project quality by the Construction Management Bureau, supervision units and quality supervision institutions, and give support and active cooperation.

Third, others.

1, this responsibility book is made in duplicate, with each party holding one copy;

2. This responsibility letter shall come into effect as of the date of signing and shall be valid until the project is accepted.

Construction Management Bureau (seal):

Director (signature):

Date of signing:

Project Department (signature):

Project Manager (signature):

Date of signing:

;